trinityboringsolutions.com

Enchanted Oaks Texas Directional Boring: Axtell Loam, Highway 198, Cedar Branch

Quick Answer: Before a bore by Enchanted Drive, confirm the address water provider with the city, county or local water district; Oncor Electric Delivery Company and Trinity Valley Electric Cooperative report service in Henderson County. Trinity takes directional boring, also called horizontal directional drilling (HDD), work in Enchanted Oaks for lines beneath Enchanted Drive. The jobsite is 280 road miles from our Yukon yard, so mobilization and access along First Oak Drive matter. USDA maps Axtell loam across most of town, with clay loam below; sticky cuttings can load the reamer.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Enchanted Oaks bores at a glance

  • Incorporated city in Henderson County, Texas. Population 362 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 280 miles, about 5.6 hours of driving.
  • Ground: Axtell soil is mapped on 86 percent of the area, with clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • No state or US highway is mapped inside the boundary. Closest: Texas State Highway 198.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring along Enchanted Drive in Enchanted Oaks?

Before setting a route near Enchanted Drive, confirm the address water provider with the city, county or local water district; Oncor Electric Delivery Company and Trinity Valley Electric Cooperative report electric service in Henderson County, so the line owner must be known before conduit is planned. The Census Bureau Vintage 2024 estimate puts Enchanted Oaks at 362 residents. We install water, sewer, gas, electric conduit and fiber beneath streets such as First Oak Drive when the route calls for it.

Our main office is in Yukon, Oklahoma, and Enchanted Oaks work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore is roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa. A typical Enchanted Oaks job is much smaller, such as a service bore beneath Cedarwood Drive. We are a family business started in 1965, and we have done directional boring since 1982.

Horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
Our horizontal directional drill set up in an open field with the support trucks and the vacuum excavation truck. Photos on this page are from our jobs in Oklahoma and Texas.

What is Axtell soil like to bore in Enchanted Oaks?

The USDA soil survey maps Axtell across 86 percent of Enchanted Oaks, mostly as Axtell loam. Axtell loam with 1 to 5 percent slopes covers 53 percent of the mapped area, and the 5 to 12 percent slopes unit covers 33 percent. The surface texture is loam across 98 percent of the town. At about 40 inches, the mapped texture is clay loam across 53 percent and clay across 45 percent. Average clay content at that depth is 40 percent, so expect sticky returns rather than free flowing sandy cuttings. These are mapped soil patterns, not test borings.

USDA soil survey, inside the Enchanted Oaks city limitsWhat is mapped
Soil series mappedAxtell 86 percent and Derly 12 percent
Texture at the surfaceloam 98 percent
Texture about 40 inches downclay loam 53 percent and clay 45 percent
Engineering class about 40 inches downfat clay (CH) 86 percent and lean clay (CL) 12 percent
Average clay content about 40 inches down40 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches12 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel98 percent of the area

Bedrock is not mapped in the top five feet of Enchanted Oaks, though the geologic map shows Quaternary terrace deposits of sand, silt, clay and gravel below the surface. That mix can change along a bore, so the drill plan must account for variable material. The USDA survey maps a seasonal water table within 40 inches across 12 percent of town, but flood prone soils are not mapped. High steel corrosion risk covers 98 percent of the mapped area, a concern for uncoated casing and tracer wire that the line owner should address when choosing materials.

How do crews handle clay loam in Enchanted Oaks?

Axtell clay loam and clay at about 40 inches can cling to the reamer and grip the product pipe. On a route near Enchanted Drive, we control fluid and timing to keep the hole stable.

  1. We use thinner drilling fluid and polymer in the Axtell clay loam mapped below Enchanted Oaks, then ream in stages to limit sticky buildup.
  2. Because clay can grip pipe, we have the line ready and pull it soon after opening the hole along a route such as Cedarwood Drive.
  3. Heavy clay is mapped across much of town, so we watch fluid returns near pavement to avoid pressure lifting a driveway or street surface.
  4. Where the mapped seasonal water table is shallow, including areas along Enchanted Drive, we keep pits small and pump out water as needed.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

Where might a line go under Texas State Highway 198 near Enchanted Oaks?

No state highway is mapped inside Enchanted Oaks, but Texas State Highway 198 runs along or touches the town limits. A crossing there may need a longer bore route than a service line beneath a local street. Enchanted Drive is the longest named street at 2.77 miles within town, followed by First Oak Drive at 0.85 miles and Cedarwood Drive at 0.59 miles. Those streets give route planners specific corridors to check for pavement, driveways and marked utilities before setting drill pits.

CrossingTypeMapped extentWho has a say
Texas State Highway 198Highway nearbyRuns along or touches the city limitsState highway office
Cedar BranchStream nearby0.2 miles outsideChecked for Corps of Engineers jurisdiction
Cedar Creek ReservoirLake or pond23,637 acres, insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Enchanted Oaks or within one mile outside its limits, so there is no local track crossing to plan around. Cedar Branch is 0.2 miles from the town limits, while no named stream is mapped inside town. No street crossing of a named stream is mapped there. Cedar Creek Reservoir lies within the limits, so a proposed lake route would need water crossing review during planning. The mapped crossing record helps identify where a route needs special attention rather than assuming every street or water feature is crossed.

Who has to approve a bore in Henderson County near Enchanted Oaks?

Enchanted Oaks is incorporated, so its city streets belong to the city; a route on Texas State Highway 198 instead falls under TxDOT. Electric and communication lines crossing that highway need 60 inches of cover below the lowest point of the crossed grade, while water lines need 60 inches and pressurized sewer lines need 60 inches. The utility owner files the right of way application through TxDOT’s RULIS system, and the TxDOT Tyler District reviews it. We prepare the bore plan and profile and work under the utility owner’s permit. A proposed Cedar Creek Reservoir crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines already in the ground in Henderson County near Enchanted Oaks?

EPA drinking water records do not match a water provider to Enchanted Oaks. Before planning a bore on Enchanted Drive, confirm the provider for that specific address with the city, county or local water district. Oncor Electric Delivery Company and Trinity Valley Electric Cooperative report electric service in Henderson County, but that does not identify the owner at every address. We confirm the electric line owner before planning conduit so the bore follows the right specifications.

Line ownerWhat it isSourceSize
Oncor Electric Delivery Company and Trinity Valley Electric CooperativeElectric utilities reporting service in Henderson CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put the median Enchanted Oaks housing year at 1979. The estimates place 84 percent of homes from 1960 to 1999 and 16 percent in 2000 or later. That mix can mean a route along Cedarwood Drive serves a replacement line or a newer connection, and the existing utility must be located either way. We hydrovac expose every marked utility on the bore path before drilling near it; paint shows where a line runs, not its depth.

Exposed underground utility line in a hand dug potholing pit before a directional bore in Oklahoma
An existing utility line exposed in a pothole before a directional bore in Oklahoma.

How far is Enchanted Oaks from Payne Springs and our Yukon yard?

Enchanted Oaks is in Henderson County, at an elevation of 343 feet, and covers 0.4 square miles. ZIP code 75156 serves the town. Payne Springs is 2.2 miles northeast, Tool is 3.8 miles west, and Gun Barrel City is 4.5 miles north. Athens, the county seat, is 16.8 miles east. From our Yukon, Oklahoma yard, the drive is 280 road miles and 5.6 hours, so distance affects crew mobilization for a bore on Enchanted Drive or near Texas State Highway 198.

Places near Enchanted Oaks

What kinds of bores come up near First Oak Drive in Enchanted Oaks?

  • Street service: A water or sewer line can pass beneath Cedarwood Drive, with marked utilities exposed before the drill approaches them.
  • Highway crossing: A route beneath Texas State Highway 198 needs a bore plan that accounts for the highway right of way and required cover.
  • Fiber conduit: A conduit route beneath Enchanted Drive can avoid cutting the paved street while connecting properties along the town’s longest named street.
  • Reservoir approach: A line near Cedar Creek Reservoir needs its route reviewed for a possible water crossing before pits and equipment are placed.
  • Creek area: A proposed bore near Cedar Branch can be planned around the stream corridor and checked for federal water jurisdiction.
  • Utility replacement: A service route beneath First Oak Drive can replace or extend a line while keeping the street surface intact.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Cedar Branch area bore in Enchanted Oaks?

For a proposed route near Cedar Branch, send the address or map pin, what will go in the ground, the pipe or conduit size, the footage, and any sketch or plans. The detail that can change the plan most is whether the route approaches the reservoir or the highway, since those features alter the crossing and access work.

Price follows the route and scope. Axtell clay loam affects drilling and reaming; crossings of Texas State Highway 198, buried utilities or Cedar Creek Reservoir can add planning and exposure work. Pipe size, total length, concrete or pavement, pits, excavator time and sand backfill also matter. Enchanted Oaks is 280 road miles from Yukon, so mobilization is part of the logistics. High profile or emergency work can require a different schedule and crew plan.

Questions people ask about boring in Enchanted Oaks

Does Trinity Boring Solutions take jobs in Enchanted Oaks and Henderson County, and who staffs them?

Yes. We take directional boring work in Enchanted Oaks and staff it with our own crews or crews from satellite yards operated by drilling contractors we have vetted. You work with Trinity through the bore log, regardless of which crew is at the site. That service model applies to routes such as one beneath First Oak Drive.

Will a bore in Enchanted Oaks hit rock below Axtell soil?

The USDA soil survey does not map bedrock in the top five feet of Enchanted Oaks, but that does not rule out deeper rock. The geologic map shows Quaternary terrace deposits with sand, silt, clay and gravel. A bore under Enchanted Drive still needs field tracking because the mapped material can vary with depth.

Who approves a bore under Texas State Highway 198 near Enchanted Oaks?

TxDOT handles the state highway right of way, with review by the TxDOT Tyler District. The utility owner submits the application through RULIS, and we prepare the bore plan and profile for that filing. Texas State Highway 198 runs along or touches Enchanted Oaks, so the utility owner needs the permit before work in its right of way.

Can a line be bored under Cedar Branch near Enchanted Oaks?

A bore can be planned near Cedar Branch, which lies 0.2 miles from the town limits, but the route must be checked for the actual channel and water crossing conditions. During planning, a proposed creek crossing is reviewed for U.S. Army Corps of Engineers jurisdiction. No named stream crossing is mapped inside Enchanted Oaks.

Who owns electric lines in Henderson County near Enchanted Oaks, and who confirms conduit specs?

Oncor Electric Delivery Company and Trinity Valley Electric Cooperative report electric service in Henderson County, but those records do not identify the owner at every Enchanted Oaks address. We confirm the line owner and conduit specifications for the route before planning a bore, including one beneath Enchanted Drive.

Is the city or county in charge of Cedarwood Drive in Enchanted Oaks, and does it need to be cut?

Enchanted Oaks is incorporated, so Cedarwood Drive is a city street. Directional boring can pass below the pavement without cutting through the street; pits sit in the dirt on either side of the bore. We expose marked utilities along the path before drilling close to them.

How far is Enchanted Oaks from Gun Barrel City and Trinity’s Yukon office?

Gun Barrel City is 4.5 miles north of Enchanted Oaks. Our Yukon, Oklahoma main office is 280 road miles away, a 5.6 hour drive, so mobilization and the equipment needed for a route near First Oak Drive affect planning.

How much notice does Texas811 need for a bore on Enchanted Drive in Enchanted Oaks?

Request the locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before the start. If the start slips more than 14 days past the original notice, submit a new request. Have worn or moved marks refreshed through Texas811 before work continues along Enchanted Drive.

What affects the cost of a bore under Texas State Highway 198 near Enchanted Oaks?

The route length, pipe or conduit size, Axtell clay conditions, utility crossings, pavement, pits and equipment time all affect the job. A Texas State Highway 198 crossing also brings right of way planning and permit requirements. Mobilization matters because Enchanted Oaks is 280 road miles from our Yukon yard.

Where the Enchanted Oaks facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Enchanted Oaks

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Enchanted Oaks, Texas

Type the address of your job in Enchanted Oaks. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Enchanted Oaks

Same county: Athens · Chandler · Malakoff · Mabank · Seven Points · Brownsboro · Eustace · Berryville · Trinidad · Star Harbor · Murchison · Poynor. All counties: Texas county list.