trinityboringsolutions.com

Tool Texas Directional Boring: Axtell Loam, Texas State Highway 274 and Clay

Quick Answer: Texas State Highway 274 is the main route to plan around; we install utilities in Tool with directional boring, also called horizontal directional drilling (HDD), to keep pavement intact. Tool is 276 road miles from our Yukon, Oklahoma main office, so a bore near Gun Barrel City needs a clear access and mobilization plan. Axtell soil and clay at depth can grip the pipe. We manage that with controlled fluid, staged reaming and a ready pull.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Tool bores at a glance

  • Incorporated city in Henderson County, Texas. Population 2,380 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 276 miles, about 5.6 hours of driving.
  • Ground: Axtell soil is mapped on 49 percent of the area, with clay about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Texas State Highway 274 and FM 3225. State permit office: TxDOT Tyler District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring along Tool Drive in Tool?

We take directional boring work in Tool, Henderson County, where the Census Bureau Vintage 2024 estimate puts the population at 2,380. Along Tool Drive, Will White Road or another route, we install water, sewer, gas, electric conduit and fiber by matching the bore to the line and access. We also do auger boring, hydrovac potholing and trenching when the route calls for them.

Our main office is in Yukon, Oklahoma, and Tool work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have drilled directionally since 1982; along Tool Drive, that experience applies to service bores as well as longer utility runs. We handle lines from 3/4 inch service lines to 48 inch casing, with bore lengths from 10 feet to 5,000 feet.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

What is Axtell soil like to bore through in Tool?

The USDA soil survey maps Axtell soil across 49% of Tool, with Derly mapped across 33%. The surface is mostly loam, but about 40 inches down, clay covers 60% of the mapped area and clay loam another 30%. The survey estimates an average clay content of 40% at that depth. We use Axtell, Derly, Freestone, and Silawa maps as planning patterns, not substitutes for Tool test borings. Clay can cling to the reamer and grip the pipe, so a bore near Will White Road needs fluid and reaming suited to the actual ground.

USDA soil survey, inside the Tool city limitsWhat is mapped
Soil series mappedAxtell 49 percent, Derly 33 percent, Freestone 7 percent and Silawa 3 percent
Texture at the surfaceloam 82 percent, fine sandy loam 10 percent and loamy fine sand 4 percent
Texture about 40 inches downclay 60 percent, clay loam 30 percent and sandy clay loam 6 percent
Engineering class about 40 inches downfat clay (CH) 57 percent, lean clay (CL) 36 percent and clayey sand (SC) 3 percent
Average clay content about 40 inches down40 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches42 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel92 percent of the area

When planning a Tool crossing near Sanders Creek, we account for no mapped bedrock in the top five feet while allowing for deeper rock. The USDA soil survey maps a seasonal water table within 60 inches across 42% of the area, so pits may need pumping. It maps no flood prone soil area. High steel corrosion risk covers 92% of the mapped area, a concern for steel casing and tracer wire; the line owner selects coatings, while HDPE avoids that soil concern. The geologic map names the Wills Point Formation, Paleocene, mostly clay and siltstone, so conditions below the soil still need attention.

What does it take to bore Tool clay?

Tool’s mapped clay can stick to a reamer and tighten around pipe. Near Axtell soil, we match the fluid and reaming steps to the ground, then track the drill head as the bore advances.

  1. At an Axtell soil location, we use thinner drilling fluid with polymer and open the hole in stages so sticky clay does not build up on the reamer.
  2. Where Tool’s heavy clay lies beneath pavement, we watch the fluid returns and keep pressure controlled to reduce the chance of lifting the surface.
  3. The seasonal water table mapped near Tool can fill a bore pit; we plan smaller pits and pumping where the site conditions call for it.
  4. Before drilling near a marked line along Tool Drive, we hydrovac pothole it to check its depth; a walkover locator tracks the head and records depth and pitch.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

Which roads and waterways affect a Tool bore near Texas State Highway 274?

Texas State Highway 274 runs 5.6 mapped roadway miles inside Tool, and FM 3225 adds 0.6 miles. Texas State Highway 334 is 0.8 miles outside the city limits. A route crossing Texas State Highway 274 needs a bore plan that keeps the pavement intact. Tool Drive is the longest named street at 6.86 miles in the city, followed by Will White Road at 2.04 miles and Arnold Hills Road at 1.74 miles. Those streets give a route starting point, but the exact service path still matters.

CrossingTypeMapped extentWho has a say
Texas State Highway 274State highway5.6 roadway miles insideState highway office
FM 3225State highway0.6 roadway miles insideState highway office
Texas State Highway 334Highway nearby0.8 miles outsideState highway office
Sanders CreekStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Cedar Creek ReservoirLake or pond23,637 acres, insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Tool or within one mile outside it, and no street and rail crossings are mapped in the city. No named stream is mapped inside the limits; Sanders Creek is 0.4 miles beyond them. Cedar Creek Reservoir, at 23,637 acres, is inside the city. The mapped street crossings of named streams are none. A route near Sanders Creek or the reservoir needs a water crossing review during planning, including a check for U.S. Army Corps of Engineers jurisdiction.

Who approves a Tool bore in Henderson County?

Tool is incorporated, so city streets such as Tool Drive belong to the city. For work in the right of way of Texas State Highway 274, FM 3225 or Texas State Highway 334, the line owner files the utility permit in TxDOT’s online RULIS system; the TxDOT Tyler District reviews it. We prepare the bore plan and profile for the owner’s application and work under the permit issued to that owner. TxDOT cover depths vary by line type: electric and communication lines need 60 inches at a crossing and 48 inches along the right of way; water needs 60 inches at a crossing and 36 inches along it; pressurized sewer needs 60 inches at a crossing. The permit can require another depth.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground in Henderson County near Tool?

The provider for the specific Tool address has to be confirmed with the city, Henderson County or the local water district before a bore is planned. That check matters before we plan a water connection or pothole its route. Oncor Electric Delivery Company and Trinity Valley Electric Cooperative report electric service in Henderson County, but that does not identify the line owner at every Tool address. We confirm the owner before planning an electric conduit bore and expose marked lines before drilling near them.

Line ownerWhat it isSourceSize
Oncor Electric Delivery Company and Trinity Valley Electric CooperativeElectric utilities reporting service in Henderson CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

We treat Tool’s ACS 2019 to 2023 five year estimate of a 1981 median housing year as context when planning underground work along Tool Drive. The survey estimates 3% of homes were built before 1960, 86% from 1960 to 1999 and 11% in 2000 or later. A replacement bore near Will White Road may follow older buried service, while newer construction may need a new connection. Before the drill approaches a marked line, we hydrovac pothole it; paint shows position, not depth.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

How far is Tool from Gun Barrel City and our Yukon office?

Tool is an incorporated city in Henderson County, at an elevation of 363 feet across 3.59 square miles. ZIP code 75143 covers the city. Gun Barrel City is 4.1 miles northeast and is the nearest larger city; Enchanted Oaks is 3.8 miles east. The county seat, Athens, is 20.7 miles east. From our Yukon, Oklahoma main office, Tool is 276 road miles away and a 5.6 hour drive. That distance is part of planning mobilization for a bore on Tool Drive or another local route.

Places near Tool

What boring work comes up near Will White Road in Tool?

  • Highway crossing: A bore beneath Texas State Highway 274 keeps an installed utility below the paved route instead of cutting across it.
  • Water service: A new service along Tool Drive starts with confirming the provider for that specific address and locating existing lines.
  • Fiber conduit: A route near Will White Road can carry fiber conduit while a bore avoids opening the street surface.
  • Creek route: A proposed bore near Sanders Creek needs a plan for drainage, pit placement and a check for federal waterway jurisdiction.
  • Reservoir route: A utility alignment near Cedar Creek Reservoir needs site specific planning for the water edge and access.
  • Electric conduit: Along FM 3225, we confirm the line owner and expose marked utilities before drilling near the planned conduit path.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore near Sanders Creek in Tool?

Send the address or map pin first. The exact spot matters near Sanders Creek because the route may change the access, drainage crossing or pit location. Include what is going in the ground, the pipe or conduit size and the footage. A sketch or plans help us see how the route meets Tool Drive, a highway or nearby utilities.

For a Texas State Highway 274 crossing, we price the scope and route permit questions through TxDOT Tyler District. Ground conditions matter: Axtell soil and clay at depth can change reaming and fluid needs. Crossings matter too, including Texas State Highway 274, pavement, marked utilities and any creek or drainage route. Logistics include bore length, pipe size, pits, excavator time, sand backfill and access. Tool is 276 road miles from Yukon, so mobilization is part of the scope. High profile or emergency work can also change the plan.

Questions people ask about boring in Tool

Does Trinity take directional boring work in Henderson County near Tool, and who staffs it?

Yes, we take directional boring work in Tool and across Texas. The required crew may work from our own team or a satellite yard run by a partner drilling contractor we have vetted. You work with Trinity through the bore log, regardless of which crew is on site near Tool Drive.

How do older lines near Will White Road affect a replacement bore in Tool?

The American Community Survey 2019 to 2023 estimates Tool’s median housing year at 1981, with 86% of homes built from 1960 to 1999. That can mean a project is replacing existing service rather than reaching a new building. Near Will White Road, we expose marked utilities by hydrovac before drilling close to them.

Can groundwater or flood prone ground affect bore pits near Sanders Creek in Tool?

It can. The USDA soil survey maps a seasonal water table within 60 inches across 42% of Tool, so a pit may need pumping. It maps no flood prone soil area. Sanders Creek is 0.4 miles outside the city limits, and a proposed route near it needs drainage and water crossing review.

Does Axtell soil in Tool create a corrosion concern for steel pipe?

The USDA soil survey maps high steel corrosion risk across 92% of Tool, so the line owner should consider steel casing and tracer wire materials. We account for Tool’s mapped Axtell soils in material planning, and HDPE avoids the soil corrosion concern. At an Axtell soil site, we still need the planned pipe material and route before setting the bore approach.

What ground will an Axtell soil bore in Tool go through?

Axtell is the leading mapped soil series in Tool at 49%. The USDA soil survey maps clay across 60% of the area at about 40 inches below the surface and clay loam across another 30%. That mapped clay can stick to the reamer and grip pipe, so the bore plan must allow controlled fluid and staged reaming.

Will a Tool bore hit rock, and what does the local geology show?

Bedrock is not mapped in Tool’s top five feet, but that does not rule out deeper rock. The geologic map shows the Wills Point Formation, Paleocene, described mostly as clay and siltstone. We plan from the route and actual ground conditions rather than treating the map as a test boring.

How much 811 notice does a Tool Drive bore need, and what if marks move?

For a Tool Drive excavation, Texas811 needs the locate request at least 48 hours ahead, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work starts. If a start on FM 3225 slips more than 14 days past the original notice, we make a new request. Refresh worn or moved marks through Texas811 before continuing.

Does being near Gun Barrel City change a Tool job’s distance from Yukon?

We plan travel from our Yukon, Oklahoma main office, 276 road miles from Tool and a 5.6 hour drive away. Gun Barrel City is 4.1 miles northeast of Tool. The Yukon distance can affect mobilization, so we consider access, bore length and equipment needs when planning work on a local route such as Tool Drive.

What affects the cost of a directional bore under Texas State Highway 274 in Tool?

The route and work scope drive the price, not the highway name alone. Texas State Highway 274 may involve pavement and a right of way permit, while Axtell soil can affect drilling time. Bore length, pipe size, utility crossings, pits, concrete or pavement, creek routes and mobilization from Yukon also shape the job.

Where the Tool facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Tool

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Tool, Texas

Type the address of your job in Tool. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Tool

Same county: Athens · Chandler · Malakoff · Brownsboro · Eustace · Berryville · Log Cabin · Trinidad · Star Harbor · Murchison · Poynor · Coffee City. All counties: Texas county list.