trinityboringsolutions.com

Payne Springs Texas Directional Boring: Axtell Clay, Texas State Highway 198, Lynn Creek

Quick Answer: We take directional boring, also called horizontal directional drilling (HDD), for routes crossing Texas State Highway 198 or Lynn Creek in Payne Springs. The Yukon main office is 281 road miles away, and our crews can plan work along Leisureland Road from that base or a vetted partner yard. Axtell soil is common here, and clay deeper down can stick to the reamer. We adjust the drilling fluid and ream in stages to manage that ground.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Payne Springs bores at a glance

  • Incorporated city in Henderson County, Texas. Population 772 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 281 miles, about 5.6 hours of driving.
  • Ground: Axtell soil is mapped on 33 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 5 percent of the area.
  • Highways inside the boundary: Texas State Highway 198, FM 90, FM 316 and FM 198. State permit office: TxDOT Tyler District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Lynn Creek and Cedar Branch.
  • Public water: Payne Springs Water Supply Corporation, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near Lynn Creek in Payne Springs?

Payne Springs is 281 road miles from our Yukon yard, and work is staffed by our own crews or vetted partner drilling contractors. The Census Bureau Vintage 2024 estimate puts the town at 772 people. Along streets such as Double Bridge Road, we install water, sewer, gas, electric conduit and fiber, with the route and existing lines shaping the bore plan.

Our main office is in Yukon, Oklahoma, and Payne Springs work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We started directional boring in 1982, and four decades of work helps us plan around the sticky clay mapped near Lynn Creek. We stay involved from the first call through the bore log, whichever crew is on site.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

What ground should I expect for a bore in Payne Springs near Axtell soil?

The USDA soil survey maps Axtell across 33 percent of Payne Springs and Derly across 31 percent. Surface texture is mostly loam, while about 40 inches down, clay is mapped under 71 percent of the area and clay loam under 22 percent. At that depth in Payne Springs, we account for the average clay content of 43 percent when planning a bore. Because these are mapped soil patterns rather than test borings, we treat them as planning context for underground work in Payne Springs. For a bore near Double Bridge Road, the clay can cling to the reamer and grip the pipe, so the plan may call for staged reaming and a same day pull.

USDA soil survey, inside the Payne Springs city limitsWhat is mapped
Soil series mappedAxtell 33 percent, Derly 31 percent, Freestone 20 percent, Crockett 4 percent and Wilson 3 percent
Texture at the surfaceloam 73 percent, fine sandy loam 22 percent and loamy fine sand 4 percent
Texture about 40 inches downclay 71 percent, clay loam 22 percent and sandy clay loam 7 percent
Engineering class about 40 inches downfat clay (CH) 58 percent, lean clay (CL) 36 percent and clayey sand (SC) 5 percent
Average clay content about 40 inches down43 percent
Bedrock mapped within 60 inches5 percent of the area (0 percent hard rock, 5 percent weathered rock)
Seasonal water table within 60 inches55 percent of the area
Flood prone soils1 percent of the area
High corrosion risk for uncoated steel94 percent of the area

The USDA soil survey maps weathered bedrock within 60 inches across 5 percent of Payne Springs; hard bedrock is not mapped at that depth. A seasonal water table is mapped within 60 inches across 55 percent, so pits may need pumping. Flood prone soils cover 1 percent, while high steel corrosion risk is mapped across 94 percent. The Wilcox Group, undivided, is Paleogene and includes mudstone, sandstone and lignite. That mix calls for checking returns and discussing steel casing and tracer wire materials with the line owner.

How do we bore the clay ground in Payne Springs?

Near Payne Springs streets such as Peach Tree Road, clay can hold the hole open but also build up on the reamer. We match the fluid and reaming sequence to the mapped soil and keep the pull moving.

  1. Clay plan: With clay mapped under 71 percent of Payne Springs at about 40 inches, we use suitable fluid and staged reaming to limit buildup on the reamer.
  2. Wet pits: A seasonal water table is mapped within 60 inches across 55 percent of town, so a pit near Lynn Creek may need pumping.
  3. Utility exposure: On a route along Whispering Oaks Trail, we hydrovac marked lines before the drill approaches because paint does not show burial depth.
  4. Creek route: For a bore near Cedar Branch, we track the drill head from the surface and log depth and pitch as the route advances.
Walkover locator at the edge of the wetland on a directional bore at the Cimarron site in Logan County, Oklahoma
Walkover locator at the edge of a wetland on a directional bore in Logan County, Oklahoma.

Which Payne Springs roads, tracks or creeks involve Union Pacific?

Texas State Highway 198 runs 5.7 mapped roadway miles inside Payne Springs. FM 90, FM 316 and FM 198 are also inside town limits; US 175 and Texas State Highway 334 lie within 1.5 miles outside them. A route along Double Bridge Road, the town’s longest named street at 1.18 miles, may also involve local access. Peach Tree Road and Whispering Oaks Trail are other long named streets. Boring beneath pavement can keep the surface intact, with the route and required cover set during planning.

CrossingTypeMapped extentWho has a say
Texas State Highway 198State highway5.7 roadway miles insideState highway office
FM 90State highway1.9 roadway miles insideState highway office
FM 316State highway1.8 roadway miles insideState highway office
FM 198State highway1.2 roadway miles insideState highway office
US 175Highway nearby1.1 miles outsideState highway office
Texas State Highway 334Highway nearby1.2 miles outsideState highway office
Union PacificRailroad nearby0.7 miles outsideThe railroad
Lynn CreekStream0.26 channel miles insideChecked for Corps of Engineers jurisdiction
Cedar BranchStream0.05 channel miles insideChecked for Corps of Engineers jurisdiction
South Twin CreekStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Spring BranchStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Cedar Creek ReservoirLake or pond23,637 acres, insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad track is mapped inside Payne Springs, but a Union Pacific line is 0.7 miles outside the limits. No street and rail crossing is mapped in town. Lynn Creek runs 0.26 channel miles inside the limits, and Cedar Branch runs 0.05 miles; public mapping shows two street crossings of named streams. Cedar Creek Reservoir is within town limits. A creek or lake route needs a review for possible federal water jurisdiction during planning.

Who approves a Payne Springs bore in Henderson County?

Because Payne Springs is incorporated, we coordinate street boring with the city that owns its city streets. Texas State Highway 198, FM 90, FM 316 and FM 198 are state roads, and work in their right of way needs a TxDOT utility permit. The TxDOT Tyler District reviews the application in RULIS, filed by the utility owner rather than the drilling contractor. We prepare the bore plan and profile for that filing and work under the owner’s permit. A Union Pacific route needs an agreement with the railroad, and a Lynn Creek or reservoir crossing is checked for U.S. Army Corps of Engineers jurisdiction.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What lines are in Payne Springs near Payne Springs Water Supply Corporation?

Payne Springs Water Supply Corporation uses groundwater wells and reports 483 service connections serving 1,449 people. For an electric conduit route near Double Bridge Road, Oncor Electric Delivery Company and Trinity Valley Electric Cooperative are the utilities reporting service in Henderson County. Those county records do not identify the provider at every address, so we confirm the line owner before planning an electric conduit bore.

Line ownerWhat it isSourceSize
Payne Springs Water Supply CorporationPublic water systemGroundwater wells483 connections, 1,449 people served
Oncor Electric Delivery Company and Trinity Valley Electric CooperativeElectric utilities reporting service in Henderson CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Payne Springs’ median housing year at 1983. They estimate 9 percent of homes were built before 1960, 65 percent from 1960 to 1999 and 26 percent in 2000 or later. A route along Leisureland Road could serve a replacement line at an older home or a newer service. We hydrovac marked utilities to expose them before drilling near them; paint shows position, not depth.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

What is near Payne Springs, including Eustace?

Payne Springs is an incorporated town in Henderson County, at an elevation of 372 feet and covering 2.12 square miles. With ZIP codes 75156 and 75124 for Payne Springs, we confirm the address before planning underground work. Enchanted Oaks is 2.2 miles southwest, while Eustace is 4.0 miles northeast; Gun Barrel City is 4.7 miles northwest and the nearest larger city. Athens, the county seat, is 15.2 miles east. From our Yukon yard, the drive is 281 road miles and 5.6 hours, which can affect mobilization for work near Texas State Highway 198.

Places near Payne Springs

What boring work comes up along Whispering Oaks Trail in Payne Springs?

  • Highway crossing: A bore beneath Texas State Highway 198 keeps the travel surface uncut, with the utility owner arranging the TxDOT permit.
  • Water service: A connection near Payne Springs Water Supply Corporation lines can be planned after the route and existing utilities are checked.
  • Fiber route: A fiber conduit along Double Bridge Road can pass beneath pavement without opening a trench across the street.
  • Creek crossing: A route beneath Lynn Creek needs depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
  • Rail route: A project near the Union Pacific line outside town limits needs railroad coordination before a track crossing is planned.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Payne Springs bore near Leisureland Road?

For a quote near Leisureland Road, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage. A sketch or plans help us see how the route meets streets, utilities or a creek. That information lets us check the likely bore path before we set the scope.

Mobilization starts with the 281 road miles from Yukon. Axtell clay can affect reaming and fluid needs, while a Texas State Highway 198 crossing adds permit planning. A route near Lynn Creek or Union Pacific track may need more crossing coordination. Pipe size, bore length, marked utilities, pavement, pits, sand backfill, excavator time and emergency timing also affect the work involved.

Questions people ask about boring in Payne Springs

Does Trinity take boring jobs in Payne Springs and Henderson County?

Yes. We take directional boring work in Payne Springs, Henderson County, with our own crews and partner contractors we have vetted. Our Yukon office stays involved from the first call through the bore log. For a route near Leisureland Road, the site details help us decide which crew and equipment fit the work.

Is rock likely on a Payne Springs bore, and how much is mapped within five feet?

The USDA soil survey maps weathered bedrock within 60 inches across 5 percent of Payne Springs, and hard bedrock is not mapped within that depth. That does not rule out deeper rock. A route near Axtell soil should still be planned around the mapped clay and checked as drilling advances.

Who approves a bore beneath Texas State Highway 198 in Payne Springs before we schedule the crossing?

TxDOT reviews the right of way utility permit through its Tyler District for Texas State Highway 198. The utility owner submits the application in RULIS, not the drilling contractor. We prepare the bore plan and profile for the owner’s filing, with the route and cover requirements considered for the highway crossing.

What does a Payne Springs bore near Union Pacific track require?

A crossing beneath the Union Pacific track requires an agreement with the railroad that owns it. The agreement sets crossing conditions such as casing, depth and flagging. The track is mapped 0.7 miles outside Payne Springs, so the exact route matters when planning work near the town.

Can a line be bored beneath Lynn Creek in Payne Springs?

A bore can be planned beneath Lynn Creek, which runs 0.26 channel miles inside Payne Springs. The route needs depth planning to pass below the channel, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction. Access and the soil near the creek also shape pit placement.

In Payne Springs, who operates the public water system and identifies its water source before we plan nearby underground work?

Payne Springs Water Supply Corporation runs the public water system using groundwater wells. Public records list 483 service connections serving 1,449 people. A proposed connection near Texas State Highway 198 still needs an address level check to confirm which existing lines are on the planned route.

Can I call after hours about urgent boring on Whispering Oaks Trail in Payne Springs?

Yes. Call (405) 409-7423; a person answers Trinity’s phone 24 hours a day. For an urgent bore near Whispering Oaks Trail, tell us what line is involved and where the work is needed so we can discuss the response and site conditions.

How early do I need to call 811 for a Payne Springs bore on Double Bridge Road?

Texas811 needs the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work begins. If a Double Bridge Road start slips more than 14 days past the original notice, make a new request. Before underground work continues on Payne Springs city streets, we have worn or moved marks refreshed through Texas811.

What affects the cost of a Payne Springs bore under Texas State Highway 198?

The route and work scope determine the price, with no single factor deciding it. Mobilization from Yukon, pipe size, footage and Payne Springs clay all matter. A Texas State Highway 198 crossing adds permit planning; creek crossings, pavement, utility exposures, pits and excavator time can also change the scope.

Where the Payne Springs facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Payne Springs

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Payne Springs, Texas

Type the address of your job in Payne Springs. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Payne Springs

Same county: Athens · Chandler · Tool · Malakoff · Mabank · Seven Points · Brownsboro · Berryville · Trinidad · Star Harbor · Murchison · Poynor. All counties: Texas county list.