Star Harbor Texas Directional Boring: Axtell Loam, FM 3062 and Cedar Creek Reservoir
Quick Answer: Star Harbor is a small incorporated city, and our directional boring, also called horizontal directional drilling (HDD), can carry a line beneath FM 3062 without cutting the pavement. The 295 road miles from our Yukon, Oklahoma main office affect mobilization for a bore along Shoreline Drive. Axtell soil and clay mapped below the surface call for careful fluid control and staged reaming. The city owns its streets, including Sunset Boulevard, so street work starts with the right route and approvals.
Star Harbor bores at a glance
- Incorporated city in Henderson County, Texas. Population 525 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 295 miles, about 6 hours of driving.
- Ground: Axtell soil is mapped on 49 percent of the area, with clay about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: FM 3062. State permit office: TxDOT Tyler District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Star Harbor, surface water.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Does anyone handle directional boring near FM 3062 in Star Harbor?
Star Harbor is a small incorporated city, so its streets, including Shoreline Drive, belong to the city. Trinity Boring Solutions takes directional boring work in Henderson County, where the Census Bureau Vintage 2024 estimate puts the population at 525. We install water, sewer, gas, electric conduit and fiber, with routes planned beneath local streets such as Sunset Boulevard or along FM 3062 as the job requires.
Our main office is in Yukon, Oklahoma, and Star Harbor work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family started in 1965, then added directional boring in 1982. From 3/4 inch service lines to 48 inch casing, that range covers work from a small service route on Starview Drive to a larger bore near FM 3062.

What is Axtell soil like to bore in Star Harbor?
The USDA soil survey maps Axtell soil across 49 percent of Star Harbor, with Axtell loam on 37 percent of the mapped area. At about 40 inches below the surface, clay is mapped across 55 percent and sandy clay loam across 21 percent; average clay content at that depth is 38 percent. Our mapped Axtell, Styx, and Derly loam patterns in Star Harbor are not test borings, so we verify conditions before selecting a bore path. For a route near Shoreline Drive, sticky clay can build on a reamer and grip the pipe, so staged reaming and a same day pull can help manage the open hole.
| USDA soil survey, inside the Star Harbor city limits | What is mapped |
|---|---|
| Soil series mapped | Axtell 49 percent, Styx 21 percent and Derly 18 percent |
| Texture at the surface | loam 67 percent and loamy fine sand 21 percent |
| Texture about 40 inches down | clay 55 percent, sandy clay loam 21 percent and clay loam 12 percent |
| Engineering class about 40 inches down | fat clay (CH) 49 percent and lean clay (CL) 39 percent |
| Average clay content about 40 inches down | 38 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 39 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 88 percent of the area |
Bedrock is not mapped in the top five feet, but the geologic map lists clayey sand and sandy clay decompositon residuum of Cenozoic age, along with Early Eocene sedimentary material. Seasonal water tables are mapped within 60 inches across 39 percent of the area, while flood prone soils are not mapped. High steel corrosion risk covers 88 percent, so the line owner should consider casing and tracer wire materials. The water table can fill pits, and the line owner should select suitable protection for steel near Sunset Boulevard.
How do crews bore through clay in Star Harbor?
Axtell soil and clay at depth make fluid control and hole stability central to a bore near Shoreline Drive. We plan the route, expose marked lines and track the drill head as it advances.
- At the Axtell loam mapped across Star Harbor, we use a thinner drilling fluid with polymer and ream in stages to reduce sticky clay buildup on the reamer.
- With seasonal water tables mapped within 40 inches across 18 percent of the area, we keep pits small and pump out water if a Shoreline Drive bore needs it.
- Before drilling near a marked line on Sunset Boulevard, we hydrovac expose it; locate paint gives its position, not its depth.
- We track the drill head from the surface and log depth and pitch as a bore advances beneath FM 3062 or another Star Harbor route.

Which roads, tracks or creeks could a Star Harbor bore cross near Shoreline Drive?
FM 3062 has 0.1 mapped roadway miles inside Star Harbor, and Texas State Highway 198 is 1.3 miles outside the city limits. A bore beneath FM 3062 needs a route and depth that suit the state highway right of way. Shoreline Drive is the longest named street at 1.64 miles, followed by Sunset Boulevard at 1.08 miles and Starview Drive at 0.55 miles. Those streets give a project a local route reference, but the actual crossing plan depends on the address and existing lines.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 3062 | State highway | 0.1 roadway miles inside | State highway office |
| Texas State Highway 198 | Highway nearby | 1.3 miles outside | State highway office |
| Cedar Creek | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
| Cedar Creek Reservoir | Lake or pond | 23,637 acres, inside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Star Harbor or within 1 mile outside its limits, so there is no mapped rail route to plan around here. Cedar Creek is 0.9 miles outside the city limits; no named stream is mapped inside the limits. The mapped street crossings of named streams are also none. Cedar Creek Reservoir lies within the city, so a proposed lake crossing would need to be checked for U.S. Army Corps of Engineers jurisdiction during planning.
Who permits a Star Harbor bore in Henderson County?
Star Harbor is incorporated, so its city streets, including Shoreline Drive, belong to the city itself. For work in the right of way of FM 3062, the utility owner applies for a TxDOT utility permit through RULIS, and the TxDOT Tyler District reviews it; we prepare the bore plan and profile for that filing. Under TxDOT rules, an electric or communication line crossing a highway needs 60 inches of cover below the lowest crossed grade, while water needs 60 inches and pressurized sewer needs 60 inches. A Cedar Creek Reservoir crossing is checked for federal jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near the City of Star Harbor system?
The City of Star Harbor public water system uses surface water and reports 373 service connections serving 1,119 people. That makes the system a key utility to locate before a proposed water or conduit route near Shoreline Drive. Oncor Electric Delivery Company and Trinity Valley Electric Cooperative report electric service in Henderson County. The electric line owner for a particular address should be confirmed before conduit specifications are set; those county reports do not identify the provider at every Star Harbor property.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Star Harbor | Public water system | Surface water | 373 connections, 1,119 people served |
| Oncor Electric Delivery Company and Trinity Valley Electric Cooperative | Electric utilities reporting service in Henderson County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Star Harbor’s median housing year at 1987, and we plan underground work around established properties. It estimates 1 percent of housing was built before 1960, 70 percent from 1960 to 1999 and 29 percent in 2000 or later. That mix can mean a Sunset Boulevard project is replacing an older service or adding a new one, but it does not date buried lines. We hydrovac pothole marked utilities on the bore path before drilling near them; paint shows position, not depth.

What is near Star Harbor and Caney City?
Star Harbor is in Henderson County, at an elevation of 332 feet, and covers 0.47 square miles. ZIP code 75148 serves Star Harbor, and we use Shoreline Drive as a local reference when coordinating boring access. Caney City is 1.6 miles northeast, Malakoff is 2.4 miles southeast, and Log Cabin is 2.9 miles northeast. Gun Barrel City is the nearest larger city, 10.4 miles northwest, while county seat Athens is 13.1 miles east. From the Yukon, Oklahoma main office, Star Harbor is 295 road miles and a 6.0 hour drive, which figures into mobilization for work on FM 3062 or local streets.
Places near Star Harbor
- Directional boring in Caney City: 1.6 miles northeast
- Directional boring in Malakoff: 2.4 miles southeast
- Directional boring in Log Cabin: 2.9 miles northeast
- Directional boring in Trinidad: 3.9 miles southwest
- Directional boring in Enchanted Oaks: 6 miles northwest
- Directional boring in Gun Barrel City: 10.4 miles northwest
What boring work comes up near Cedar Creek and Star Harbor?
- Highway crossing: A bore beneath FM 3062 needs a route planned for the highway right of way and its required cover.
- Street crossing: Shoreline Drive runs 1.64 miles in the city, giving a long local route where a bore can avoid cutting pavement.
- Water service: The City of Star Harbor system uses surface water, so a proposed service route needs existing lines exposed before drilling near them.
- Reservoir crossing: A proposed bore at Cedar Creek Reservoir needs planning that checks whether the crossing falls under U.S. Army Corps of Engineers jurisdiction.
- Fiber route: A conduit bore along Sunset Boulevard can place a new line underground while leaving the street surface uncut.
- Utility replacement: A route near Starview Drive can be planned for a replacement service after marked utilities are exposed by hydrovac.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for directional boring on Rainbow Drive in Star Harbor?
For a Rainbow Drive quote, tell us the address or map pin, what will go in the ground, the pipe or conduit size and the footage. A sketch or plans can show whether the route follows the street or crosses another feature. Those details let us shape a bore plan around the actual Star Harbor location.
Price follows the route and work involved, not just footage. Axtell clay can affect drilling and reaming; a route beneath FM 3062 adds highway planning; and mobilization reflects the 295 road miles from Yukon. We also consider pipe size, marked utilities to expose, pavement or concrete, creek or drainage crossings, pits, excavator time, sand backfill and emergency or high profile conditions. A Rainbow Drive sketch helps identify which of those items apply.
Questions people ask about boring in Star Harbor
Does Trinity take directional boring jobs in Henderson County near Star Harbor?
Yes. We take directional boring work in Henderson County, including Star Harbor. Our own crews and partner contractor crews from satellite yards can handle the work; Trinity stays your contact from the first call through the bore log. For a route near FM 3062, the address and proposed line help us plan the scope.
Who runs Star Harbor’s public water system, and where does it get water?
The City of Star Harbor owns the public water system, which uses surface water. Public system records list 373 service connections and 1,119 people served. If a bore near Shoreline Drive is planned close to water infrastructure, the route needs utility locating and exposure before drilling near marked lines.
Which electric company should I ask about conduit specs in Henderson County near Star Harbor?
Confirm the line owner for the specific Star Harbor address before settling conduit specifications. Oncor Electric Delivery Company and Trinity Valley Electric Cooperative report electric service in Henderson County, but those records do not identify which provider serves every location. That check matters before a conduit bore along Sunset Boulevard is laid out.
Does the city or county control Starview Drive in Star Harbor, and must a bore cut it?
Star Harbor is incorporated, so Starview Drive is a city street. Directional boring can place a line beneath the street without opening the pavement, subject to the route and the approvals for the work. The actual plan depends on marked utilities and conditions at the Starview Drive address.
How old are homes and buried lines near Sunset Boulevard in Star Harbor?
The American Community Survey 2019 to 2023 five year estimates put the median housing year at 1987. Housing age does not establish the age or condition of a buried line, so a Sunset Boulevard replacement bore should be planned around the line owner’s information and current utility locates. Before drilling near FM 3062, we expose marked lines to confirm their location and protect the planned crossing.
Could groundwater or flooding affect bore pits near Cedar Creek and Star Harbor?
Seasonal water tables are mapped within 60 inches across 39 percent of Star Harbor, which can mean water in pits. Flood prone soils are not mapped inside the city, and Cedar Creek is 0.9 miles beyond its limits. We plan pit placement for the site and pump water if a bore location requires it.
Can I reach Trinity after hours about an urgent Starview Drive bore in Star Harbor?
Yes. For Star Harbor work in Henderson County, a person answers our phone 24 hours a day at (405) 409-7423. For an urgent Starview Drive bore, share the location and what line is involved so we can understand the request. Emergency work can affect the scope and planning for the job.
How much notice does Texas811 need before a bore on Shoreline Drive in Star Harbor?
For a Shoreline Drive excavation, Texas law requires a locate request at least 48 hours ahead, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work starts. For permits through TxDOT Tyler District, if the start slips more than 14 days past the original notice, we submit a new request. Near Texas State Highway 198, we have worn or moved marks refreshed through Texas811 before continuing boring work.
What affects the cost of a directional bore under FM 3062 in Star Harbor?
The job’s length, pipe size, Axtell clay, utilities to expose and pavement all affect the price. A route under FM 3062 also involves highway planning, while mobilization accounts for the 295 road miles from Yukon. Pits, excavator time, backfill, drainage crossings and urgent scheduling can change the scope as well.
Where the Star Harbor facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Star Harbor
- U.S. Census Bureau, TIGER/Line 2024: Star Harbor boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Star Harbor
- U.S. Census Bureau, American Community Survey 2019 to 2023: Star Harbor housing units and year built
- Macrostrat geologic map compilation: map units under Star Harbor
- U.S. EPA Safe Drinking Water Information System: public water systems serving Star Harbor
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Henderson County
- U.S. Geological Survey, Elevation Point Query Service: Star Harbor elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Star Harbor
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Star Harbor
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Star Harbor, Texas
Type the address of your job in Star Harbor. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Star Harbor
Same county: Athens · Chandler · Tool · Mabank · Seven Points · Brownsboro · Eustace · Berryville · Payne Springs · Murchison · Poynor · Coffee City. All counties: Texas county list.