New London Texas Directional Boring: Cuthbert Soil, Texas State Highway 42 and HOB Track
Quick Answer: New London is a small incorporated city, so its streets belong to the city; Trinity Boring Solutions takes directional boring work, also called horizontal directional drilling (HDD), along Texas State Highway 42. Our Yukon, Oklahoma main office is 345 road miles away, and Kilgore is 9.7 miles northeast. Cuthbert soil is mapped across 31% of the city, and clay below the surface can grip pipe. Main Street runs 4.53 miles within city limits.
New London bores at a glance
- Incorporated city in Rusk County, Texas. Population 988 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 345 miles, about 6.7 hours of driving.
- Ground: Cuthbert soil is mapped on 31 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 53 percent of the area.
- Highways inside the boundary: Texas State Highway 42, FM 1513, FM 850, FM 918 and Texas State Highway 323. State permit office: TxDOT Tyler District.
- Railroad track inside the boundary: a short line railroad (reporting mark HOB), with 6 mapped street and rail crossings.
- Named streams inside the boundary: Little Rabbit Creek.
- Public water: City of New London, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Texas State Highway 42 in New London?
New London is a small incorporated city in Rusk County, so its city streets belong to the city; we take directional boring work along Texas State Highway 42 and local roads. For underground work in New London, we treat the Census Bureau Vintage 2024 estimate of 988 residents as context, not a bore route measurement. We install water, sewer, gas, electric conduit and fiber lines, including routes along Main Street or connections near the state highway.
Our main office is in Yukon, Oklahoma, and New London work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have done directional boring since 1982, experience we bring to New London project planning. The work ranges from 3/4 inch service lines to 48 inch casing, with bore lengths from 10 feet to 5,000 feet, for routes such as those near Texas State Highway 42.

What does the soil survey show beneath Cuthbert soil in New London?
The USDA soil survey maps Cuthbert fine sandy loam across 31% of New London, with Kirvin, Lilbert and Tenaha also represented. At about 40 inches below the surface, clay is mapped under 54% of the city and sandy clay loam under 41%; average clay content at that depth is 37%. For New London boring plans, we treat mapped soil patterns as map information, not as test borings or confirmed conditions. The clay can hold an open hole, then stick to the reamer or grip pipe, so the actual route and soil conditions matter to the bore plan.
| USDA soil survey, inside the New London city limits | What is mapped |
|---|---|
| Soil series mapped | Cuthbert 31 percent, Kirvin 25 percent, Lilbert 19 percent, Tenaha 16 percent and Sacul 4 percent |
| Texture at the surface | fine sandy loam 56 percent, loamy fine sand 36 percent and gravelly fine sandy loam 5 percent |
| Texture about 40 inches down | clay 54 percent, sandy clay loam 41 percent and clay loam 3 percent |
| Engineering class about 40 inches down | silt (ML) 31 percent, lean clay (CL) 25 percent and fat clay (CH) 23 percent |
| Average clay content about 40 inches down | 37 percent |
| Bedrock mapped within 60 inches | 53 percent of the area (0 percent hard rock, 53 percent weathered rock) |
| Seasonal water table within 60 inches | 8 percent of the area |
| Flood prone soils | 4 percent of the area |
| High corrosion risk for uncoated steel | 58 percent of the area |
Weathered bedrock is mapped within 60 inches across 53% of New London, while hard bedrock is not mapped at that depth. The typical mapped bedrock depth is 40 inches, so a route may meet slower drilling in weathered material. Seasonal water table is mapped within 60 inches across 8%, and flood prone soils across 4%; Little Rabbit Creek still calls for site specific planning. High steel corrosion risk is mapped across 58%. The Reklaw Formation, an Eocene unit of sandstone and claystone, adds local variability to the soil map.
How do we run a bore through clay in New London?
In New London, we plan the bore around the clay mapped at about 40 inches and the Cuthbert soil that covers 31% of the city. The drill path, fluid use and reaming sequence depend on the ground found along the route.
- Clay handling: Cuthbert soil and the mapped clay at about 40 inches can make the reamer sticky, so we use thinner fluid with polymer and ream in stages.
- Pavement control: Where a New London route approaches Texas State Highway 42, we keep fluid pressure low enough to limit the chance of lifting pavement.
- Utility exposure: Before drilling near marked lines along Main Street, we hydrovac pothole each utility on the path because paint does not show its depth.
- Ground tracking: The Reklaw Formation includes sandstone and claystone, so we track the drill head from the surface and log depth and pitch as the ground changes.

What does a bore have to cross near Main Street in New London?
New London routes may meet Texas State Highway 42, FM 1513, FM 850, FM 918 or Texas State Highway 323, all mapped within city limits. Texas State Highway 42 has 5.0 mapped roadway miles in the city, and FM 1513 has 3.3. Main Street runs 4.53 miles within the limits; Humble Road runs 3.28 miles and Nubbin Fuller Road 2.26. A planned path along these roads needs to account for pavement, driveways and other marked utilities without assuming a clear route.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 42 | State highway | 5 roadway miles inside | State highway office |
| FM 1513 | State highway | 3.3 roadway miles inside | State highway office |
| FM 850 | State highway | 2 roadway miles inside | State highway office |
| FM 918 | State highway | 1.4 roadway miles inside | State highway office |
| Texas State Highway 323 | State highway | 0.4 roadway miles inside | State highway office |
| Texas State Highway 135 | Highway nearby | 0.7 miles outside | State highway office |
| a short line railroad (reporting mark HOB) | Railroad | 2.59 track miles inside | The railroad |
| Little Rabbit Creek | Stream | 0.48 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Johnson Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| Davis Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
| Bighead Creek | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
| Tiawichi Creek | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
A short line railroad (reporting mark HOB) has 2.59 track miles within New London, with 6 mapped street and rail crossings. Little Rabbit Creek has 0.48 channel miles in the city, and no street crossings of named streams are mapped there. Johnson Creek is 0.2 miles outside the city limits. Our underground planning for New London accounts for the map showing no lakes or ponds within one mile. A creek route needs its own depth and access review rather than being treated like an ordinary street bore.
Do I need a permit to bore under roads or tracks in Rusk County in New London?
For work in New London on Texas State Highway 42 or another state highway, farm to market road or ranch to market road, the line owner files for a TxDOT utility permit through RULIS; the contractor does not file it. We give the owner the bore plan and profile, and the TxDOT Tyler District reviews the application. Highway crossing cover is at least 60 inches for electric and communication lines and water lines, and for pressurized sewer lines; the district may set a different depth. Existing highway pavement is bored or tunneled, and crossings are encased. The city owns its city streets. A crossing of the HOB track needs an agreement with that railroad. Little Rabbit Creek is checked for Army Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried near the City of New London water system?
The City of New London public water system uses groundwater wells and has 828 service connections serving a population of 2,484. County records list Oncor Electric Delivery Company, Southwestern Electric Power, Cherokee County Electric Cooperative Association, Deep East Texas Electric Cooperative, Rusk County Electric Cooperative and Upshur Rural Electric Cooperative as reporting electric service in Rusk County; that list does not identify the provider at every address. Before a conduit bore near Main Street, we confirm the line owner and expose marked utilities with hydrovac potholing before drilling near them.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of New London | Public water system | Groundwater wells | 828 connections, 2,484 people served |
| Oncor Electric Delivery Company, Southwestern Electric Power, Cherokee County Electric Cooperative Association, Deep East Texas Electric Cooperative, Rusk County Electric Cooperative and Upshur Rural Electric Cooperative | Electric utilities reporting service in Rusk County | EIA Form 861 | Confirm the line owner by address |
We use New London’s American Community Survey 2019 to 2023 five year estimate of a median housing year of 1968 as context for underground planning. It estimates 27% of units were built before 1960, 62% from 1960 to 1999 and 11% in 2000 or later. A route serving older homes may involve replacing existing pipe, while newer housing can call for a new service. Along Humble Road or Main Street, we pothole marked utilities before drilling near them because locate marks show position, not depth.

How far is New London from Kilgore and our Yukon yard?
New London is in Rusk County, at an elevation of 547 feet, and covers 8.61 square miles. For underground planning in New London, we use ZIP codes 75684 and 75682 to identify the service area. Overton is 2.5 miles west, Arp is 7.8 miles southwest, Kilgore is 9.7 miles northeast, Henderson is 11.0 miles southeast, and Liberty City is 12.6 miles north. Henderson is the county seat; Kilgore is the nearest larger city. The Yukon, Oklahoma yard is 345 road miles away, a 6.7 hour drive, which affects mobilization for a New London job.
Places near New London
- Directional boring in Overton: 2.5 miles west
- Directional boring in Arp: 7.8 miles southwest
- Directional boring in Kilgore: 9.7 miles northeast
- Directional boring in Henderson: 11 miles southeast
- Directional boring in Liberty City: 12.6 miles north
What would we bore near Little Rabbit Creek in New London?
- Highway crossing: A bore beneath Texas State Highway 42 needs a route and profile suited to the highway crossing and its pavement.
- Water service: A connection near the City of New London system can carry a water line toward a home along Main Street.
- Fiber route: Fiber conduit along FM 1513 can be planned around marked utilities and pavement without cutting across the road surface.
- Creek crossing: A route beneath Little Rabbit Creek needs a depth plan for the channel and a jurisdiction check during planning.
- Rail crossing: Work beneath the HOB track requires an agreement with the railroad that owns it, with crossing conditions set for the route.
- Street service: A sewer or electric conduit bore near Humble Road can avoid an open cut across the roadway when the route allows.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a New London quote near a short line railroad (reporting mark HOB)?
For a New London quote, send the address or map pin, what will go in the ground, the pipe or conduit size and footage, and any sketch or plans. A route near the HOB track or Little Rabbit Creek can change the crossing plan, so showing those features on the map helps us review the scope.
The price depends on the work along the route, not one item alone. Cuthbert soil and clay at about 40 inches can affect drilling and reaming; weathered bedrock may add time. Crossings of Texas State Highway 42, the HOB track or Little Rabbit Creek bring different planning and access needs. We also account for length, pipe size, exposed utilities, pavement, pits, excavator time, backfill and mobilization from the Yukon yard, 345 road miles away.
Questions people ask about boring in New London
Does Trinity take directional boring work in New London, Rusk County, and who staffs it?
Yes, we take directional boring work in New London, Rusk County, using our crews and vetted partner contractor satellite yards. Our main office is in Yukon, Oklahoma, and customers deal with Trinity from the first call through the bore log, whichever crew is on site. That keeps project communication with one contractor for a route near Texas State Highway 42 or Main Street.
What ground should I expect for a New London bore through Cuthbert soil?
The USDA soil survey maps Cuthbert fine sandy loam across 31% of New London, while clay is mapped under 54% of the city at about 40 inches. That clay can hold an open hole but stick to the reamer or grip pipe. The soil map guides planning, but it is not a test boring, so the route conditions still need to be checked.
Will a New London bore encounter rock near the planned route?
It may encounter weathered bedrock: the map places bedrock within 60 inches across 53% of New London, with typical depth at 40 inches. Hard bedrock is not mapped in that depth range. The Reklaw Formation includes sandstone and claystone, so weathered material can slow drilling compared with soil and calls for attention to the ground transition.
Who approves work under Texas State Highway 42 in New London?
The line owner applies for a TxDOT utility permit in RULIS, and the TxDOT Tyler District reviews work on Texas State Highway 42. We provide the bore plan and profile for the owner’s application and work under the permit issued to that owner. TxDOT cover and crossing conditions depend on the line type and the approved permit.
What does a New London bore under a short line railroad (reporting mark HOB) require?
A bore under the HOB track needs an agreement from the railroad that owns it. At New London crossings, we follow the agreement’s conditions for casing, depth and flagging before directional work proceeds. The railroad has 2.59 track miles within New London, and 6 mapped street and rail crossings, so the proposed route needs to be checked against the track location.
Can a line be bored under Little Rabbit Creek in New London?
A bore under Little Rabbit Creek can be planned, subject to route conditions and a check for U.S. Army Corps of Engineers jurisdiction. The creek has 0.48 channel miles within New London. We plan the depth to stay below the channel and account for access at the banks rather than treating a creek crossing like a standard street route.
How far is New London from Kilgore and Trinity’s Yukon, Oklahoma main office?
New London is 9.7 miles southwest of Kilgore and 345 road miles from our Yukon, Oklahoma main office, a 6.7 hour drive. That distance can affect mobilization for work near Texas State Highway 42 or Little Rabbit Creek. The job route, equipment and scope determine how that travel fits into the work plan.
How early should I call Texas811 for a New London bore near Main Street?
For a bore near Main Street, submit the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If our New London start date moves more than 14 days beyond the original notice, we submit a new request. Before continuing work in New London, we request refreshed marks through Texas811 if they wear off or move.
What affects the cost of directional boring under Texas State Highway 42 in New London?
The route, length, pipe or conduit size, ground, exposed utilities and crossings all affect the job price. Clay mapped under 54% of New London at about 40 inches can shape the drilling plan, while Texas State Highway 42 adds highway crossing requirements. The HOB track, pavement, pits, backfill, equipment time and mobilization from Yukon can also change the scope.
Where the New London facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside New London
- U.S. Census Bureau, TIGER/Line 2024: New London boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: New London
- U.S. Census Bureau, American Community Survey 2019 to 2023: New London housing units and year built
- Macrostrat geologic map compilation: map units under New London
- U.S. EPA Safe Drinking Water Information System: public water systems serving New London
- U.S. Department of Transportation, North American Rail Network: track owners in Rusk County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Rusk County
- U.S. Geological Survey, Elevation Point Query Service: New London elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to New London
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in New London
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in New London, Texas
Type the address of your job in New London. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.