Arp Texas Directional Boring: Lilbert Soil, Kickapoo Creek and Union Pacific
Quick Answer: Arp is a small city, so Main Street is under city control; we take directional boring, also called horizontal directional drilling (HDD), work in Arp, Texas, near Kickapoo Creek and Union Pacific track. Our Yukon, Oklahoma main office is 333 road miles away, and Texas State Highway 135 is a local route to plan around. The USDA soil survey maps Lilbert loamy fine sand across 48 percent of Arp, so the hole may need staged reaming to stay open.
Arp bores at a glance
- Incorporated city in Smith County, Texas. Population 987 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 333 miles, about 6.6 hours of driving.
- Ground: Lilbert soil is mapped on 48 percent of the area, with sandy clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 5 percent of the area.
- Highways inside the boundary: Texas State Highway 135 and Texas State Highway 64. State permit office: TxDOT Tyler District.
- Railroad track inside the boundary: Union Pacific, with 4 mapped street and rail crossings.
- Named streams inside the boundary: Kickapoo Creek.
- Public water: City of Arp, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring in Arp near Union Pacific track?
Trinity Boring Solutions takes directional boring work in Arp, a small incorporated city in Smith County where Main Street is under city control. The Census Bureau’s Vintage 2024 estimate counts 987 residents in Arp. Water, sewer, gas, electric conduit and fiber can be routed beneath local streets or around the Union Pacific track, depending on the site plan and utility clearances.
Our main office is in Yukon, Oklahoma, and Arp work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We began directional boring in 1982, after our family business started in 1965. Four decades of boring help us plan for Arp’s Lilbert loamy fine sand and the clay mapped below it.

What does the soil survey show about Arp and Lilbert soil?
The USDA soil survey maps Lilbert soil across 48 percent of Arp, mostly as Lilbert loamy fine sand on 1 to 6 percent slopes. Surface mapping shows loamy fine sand over 61 percent of the city and fine sandy loam over 24 percent. About 40 inches down, sandy clay loam covers 86 percent of the mapped area, while the average clay content at that depth is 27 percent. These are mapped soil patterns, not test borings; sand can loosen behind the bit, while the deeper clay can grip the pipe.
| USDA soil survey, inside the Arp city limits | What is mapped |
|---|---|
| Soil series mapped | Lilbert 48 percent, Cuthbert 16 percent, Bowie 11 percent, Kirvin 6 percent and Tenaha 6 percent |
| Texture at the surface | loamy fine sand 61 percent, fine sandy loam 24 percent and very fine sandy loam 6 percent |
| Texture about 40 inches down | sandy clay loam 86 percent, clay 6 percent and clay loam 4 percent |
| Engineering class about 40 inches down | clayey sand (SC) 52 percent, lean clay (CL) 35 percent and fat clay (CH) 6 percent |
| Average clay content about 40 inches down | 27 percent |
| Bedrock mapped within 60 inches | 5 percent of the area (0 percent hard rock, 5 percent weathered rock) |
| Seasonal water table within 60 inches | 19 percent of the area |
| Flood prone soils | 4 percent of the area |
| High corrosion risk for uncoated steel | 24 percent of the area |
The mapped typical bedrock depth is 29 inches, and bedrock is shown within 60 inches across 5 percent of Arp. Seasonal water tables occur within 60 inches on 19 percent of the mapped area, so pits may need pumping. Flood prone soils cover 4 percent, including ground where creek depth needs attention. High steel corrosion risk is mapped on 24 percent. The Queen City Sand formation is Eocene age and includes sand and clay, so we plan for changing material rather than assuming one consistent layer.
How do we bore through Arp’s sandy clay loam?
We adapt the Arp bore plan to sandy clay loam beneath Lilbert loamy fine sand, with staged reaming where loose surface material could fall into the hole.
- Lilbert loamy fine sand is mapped across 48 percent of Arp, so we use wall building drilling fluid and staged reaming to limit cave in.
- Where sandy clay loam lies about 40 inches down, we manage fluid and reamer size to keep the deeper clay from gripping the pipe.
- Seasonal water tables are mapped within 60 inches on 19 percent of the area, so we keep pits compact and pump them if water collects.
- At Kickapoo Creek, we plan a route below the channel and check for federal jurisdiction before selecting the crossing approach.

What is in the way of a new line in Arp near Kickapoo Creek?
Texas State Highway 135 runs 2.4 mapped roadway miles inside Arp, and Texas State Highway 64 runs 1.7. Both need a planned route that accounts for pavement and the state right of way. Longview Street is the longest named street at 2.38 miles in the city; Main Street runs 1.66 miles and Front Street 1.15. Those street lengths give route context, but the exact bore path still depends on the address, marked lines and crossing points.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 135 | State highway | 2.4 roadway miles inside | State highway office |
| Texas State Highway 64 | State highway | 1.7 roadway miles inside | State highway office |
| Union Pacific | Railroad | 2.1 track miles inside | The railroad |
| Kickapoo Creek | Stream | 1.93 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Caney Creek | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| Henson Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
| Wright Branch | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific owns 2.1 track miles inside Arp on its Palestine Subdivision, and public mapping shows 4 street and rail crossings. A bore under the track needs an agreement from Union Pacific that sets crossing conditions. Kickapoo Creek runs 1.93 channel miles in the city, with 3 mapped street crossings of named streams. Creek work is planned for depth and access, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction.
Do I need a permit to bore under Texas State Highway 135 in Arp?
A crossing beneath Texas State Highway 135 needs at least 60 inches of cover below the lowest crossed grade for electric and communication lines or water lines; pressurized sewer also needs 60 inches at a crossing. TxDOT’s Tyler District reviews the utility permit. The utility owner files through TxDOT’s online RULIS system, and we prepare the bore plan and profile for its application. Existing highway pavement is crossed by boring or tunneling, with the bore extending beneath all travel lanes on rural highways. Arp street work falls under the city, while a Union Pacific track crossing needs the railroad’s agreement. Kickapoo Creek is checked for federal jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the lines in Arp and Smith County?
The City of Arp public water system uses groundwater wells and reports 592 service connections for 1,249 people. For electric service, Oncor Electric Delivery Company, Southwestern Electric Power, Cherokee County Electric Cooperative Association, Upshur Rural Electric Cooperative and Wood County Electric Cooperative report service in Smith County. Those county reports do not identify the provider at every Arp address, so we confirm the line owner before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Arp | Public water system | Groundwater wells | 592 connections, 1,249 people served |
| Oncor Electric Delivery Company, Southwestern Electric Power, Cherokee County Electric Cooperative Association, Upshur Rural Electric Cooperative and Wood County Electric Cooperative | Electric utilities reporting service in Smith County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Arp’s median housing year at 1968; 42 percent of homes were built before 1960, 38 percent from 1960 to 1999 and 20 percent in 2000 or later. Work on older streets such as Front Street may involve replacement lines, while newer service routes can add connections. We use hydrovac potholing to expose marked lines near the City of Arp water system and the electric provider confirmed for the address, since paint gives position but not depth.

Where is Arp in relation to Overton and other nearby places?
Arp is in Smith County, at an elevation of 499 feet and within 2.62 square miles. ZIP code 75750 serves the city. Overton is 5.8 miles northeast, Troup is 6.9 miles southwest, New London is 7.8 miles northeast, New Chapel Hill is 8.5 miles northwest and Whitehouse is 9.8 miles west. Tyler, the county seat, is 16.1 miles northwest. From our Yukon, Oklahoma main office, the road distance to Arp is 333 miles and the drive takes 6.6 hours, which affects mobilization for work near Longview Street or Kickapoo Creek.
Places near Arp
- Directional boring in Overton: 5.8 miles northeast
- Directional boring in Troup: 6.9 miles southwest
- Directional boring in New London: 7.8 miles northeast
- Directional boring in New Chapel Hill: 8.5 miles northwest
- Directional boring in Whitehouse: 9.8 miles west
What kinds of bores come up in Arp near Main Street?
- Highway crossing: A bore under Texas State Highway 135 stays beneath the travel lanes and follows the cover depth set for the line type.
- Water service: A connection from the City of Arp groundwater system can be routed beneath Main Street after nearby lines are exposed.
- Fiber route: A fiber conduit near Longview Street can be bored beneath pavement, with the route checked against marked utilities.
- Creek crossing: A line under Kickapoo Creek needs planned depth and a jurisdiction check before the bore path is set.
- Rail crossing: A bore beneath Union Pacific’s Palestine Subdivision needs the railroad’s agreement for the track crossing.
- Street connection: Work along Front Street can place water, sewer or conduit without cutting the street surface.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a bore in Arp near Longview Street?
A map pin matters in Arp because a route near Longview Street can have different crossings from one near Kickapoo Creek. Send the job address or pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans help us identify the route, access and marked crossings before we scope the bore.
In Arp, soil and crossing conditions lead the price review: Lilbert loamy fine sand can require staged reaming, while deeper sandy clay loam can hold and grip the hole. We also account for the number of utilities to expose, pavement at Texas State Highway 135, Union Pacific track or creek crossings, pits, excavator time and sand backfill. The 333 road miles from Yukon affect mobilization, and high profile or emergency work can add planning needs.
Questions people ask about boring in Arp
Does Trinity take directional boring work in Arp and Smith County, and how is it staffed?
Yes, we take directional boring projects in Arp and Smith County. Our own crews and crews at satellite yards operated by drilling contractors we have vetted can staff the work. You work with Trinity from the first call through the bore log, including when a partner contractor’s crew is on site near Main Street.
What does a bore beneath Union Pacific track in Arp require?
A bore beneath Union Pacific track in Arp requires an agreement from the railroad that owns it. That agreement sets crossing details such as casing, depth and flagging. The local track is part of Union Pacific’s Palestine Subdivision, so the railroad’s conditions need to be established before the crossing plan is finalized.
Can a line be bored under Kickapoo Creek in Arp?
A line can be planned beneath Kickapoo Creek in Arp, subject to the site conditions and crossing review. The stream runs 1.93 channel miles within the city, and mapped streets cross named streams at 3 points. During planning, the creek crossing is checked for U.S. Army Corps of Engineers jurisdiction.
Who runs Arp’s public water system and where does its water come from?
The City of Arp runs the public water system, which draws water from groundwater wells. It reports 592 service connections and serves 1,249 people. A new connection near Front Street still needs route planning and exposure of marked lines before the drill approaches the existing water infrastructure.
Which electric provider should I check with in Arp and Smith County before a conduit bore?
Confirm the electric line owner for the Arp address before planning a conduit bore. Oncor Electric Delivery Company, Southwestern Electric Power, Cherokee County Electric Cooperative Association, Upshur Rural Electric Cooperative and Wood County Electric Cooperative report service in Smith County, but the county list does not assign a provider to every address.
Does the city control Front Street in Arp, and does a bore require cutting it?
Arp controls its city streets, including Front Street. A directional bore can pass beneath the street without cutting its surface, subject to the route and utility clearances. We expose marked utilities along the planned path before drilling near them, since surface marks show a line’s position but not its depth.
How much notice does Texas811 need for a bore on Longview Street in Arp?
For a bore on Longview Street, Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.
How far is Arp from Yukon, and does Whitehouse affect the job?
Arp is 333 road miles and a 6.6 hour drive from our Yukon, Oklahoma main office. Whitehouse is 9.8 miles west of Arp and is the nearest larger city. The Yukon distance can affect mobilization; the Whitehouse location does not change the need to plan the bore around Arp’s actual route and crossings.
What affects the cost of a bore under Texas State Highway 135 in Arp?
The Arp job’s soil and crossing scope matter, including the mapped Lilbert loamy fine sand, utility exposures and pavement at Texas State Highway 135. Pipe or conduit size, bore length, creek or rail crossings, pits, excavator time and sand backfill also shape the work. Mobilization from Yukon and high profile or emergency conditions are considered as well.
Where the Arp facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Arp
- U.S. Census Bureau, TIGER/Line 2024: Arp boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Arp
- U.S. Census Bureau, American Community Survey 2019 to 2023: Arp housing units and year built
- Macrostrat geologic map compilation: map units under Arp
- U.S. EPA Safe Drinking Water Information System: public water systems serving Arp
- U.S. Department of Transportation, North American Rail Network: track owners in Smith County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Smith County
- U.S. Geological Survey, Elevation Point Query Service: Arp elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Arp
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Arp
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Arp, Texas
Type the address of your job in Arp. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Arp
Same county: Tyler · Lindale · Bullard · Hideaway · Emerald Bay · Noonday · Winona. All counties: Texas county list.
