trinityboringsolutions.com

Arp Texas Directional Boring: Lilbert Soil, Kickapoo Creek and Union Pacific

Quick Answer: Arp is a small city, so Main Street is under city control; we take directional boring, also called horizontal directional drilling (HDD), work in Arp, Texas, near Kickapoo Creek and Union Pacific track. Our Yukon, Oklahoma main office is 333 road miles away, and Texas State Highway 135 is a local route to plan around. The USDA soil survey maps Lilbert loamy fine sand across 48 percent of Arp, so the hole may need staged reaming to stay open.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Arp bores at a glance

  • Incorporated city in Smith County, Texas. Population 987 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 333 miles, about 6.6 hours of driving.
  • Ground: Lilbert soil is mapped on 48 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 5 percent of the area.
  • Highways inside the boundary: Texas State Highway 135 and Texas State Highway 64. State permit office: TxDOT Tyler District.
  • Railroad track inside the boundary: Union Pacific, with 4 mapped street and rail crossings.
  • Named streams inside the boundary: Kickapoo Creek.
  • Public water: City of Arp, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Arp near Union Pacific track?

Trinity Boring Solutions takes directional boring work in Arp, a small incorporated city in Smith County where Main Street is under city control. The Census Bureau’s Vintage 2024 estimate counts 987 residents in Arp. Water, sewer, gas, electric conduit and fiber can be routed beneath local streets or around the Union Pacific track, depending on the site plan and utility clearances.

Our main office is in Yukon, Oklahoma, and Arp work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We began directional boring in 1982, after our family business started in 1965. Four decades of boring help us plan for Arp’s Lilbert loamy fine sand and the clay mapped below it.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show about Arp and Lilbert soil?

The USDA soil survey maps Lilbert soil across 48 percent of Arp, mostly as Lilbert loamy fine sand on 1 to 6 percent slopes. Surface mapping shows loamy fine sand over 61 percent of the city and fine sandy loam over 24 percent. About 40 inches down, sandy clay loam covers 86 percent of the mapped area, while the average clay content at that depth is 27 percent. These are mapped soil patterns, not test borings; sand can loosen behind the bit, while the deeper clay can grip the pipe.

USDA soil survey, inside the Arp city limitsWhat is mapped
Soil series mappedLilbert 48 percent, Cuthbert 16 percent, Bowie 11 percent, Kirvin 6 percent and Tenaha 6 percent
Texture at the surfaceloamy fine sand 61 percent, fine sandy loam 24 percent and very fine sandy loam 6 percent
Texture about 40 inches downsandy clay loam 86 percent, clay 6 percent and clay loam 4 percent
Engineering class about 40 inches downclayey sand (SC) 52 percent, lean clay (CL) 35 percent and fat clay (CH) 6 percent
Average clay content about 40 inches down27 percent
Bedrock mapped within 60 inches5 percent of the area (0 percent hard rock, 5 percent weathered rock)
Seasonal water table within 60 inches19 percent of the area
Flood prone soils4 percent of the area
High corrosion risk for uncoated steel24 percent of the area

The mapped typical bedrock depth is 29 inches, and bedrock is shown within 60 inches across 5 percent of Arp. Seasonal water tables occur within 60 inches on 19 percent of the mapped area, so pits may need pumping. Flood prone soils cover 4 percent, including ground where creek depth needs attention. High steel corrosion risk is mapped on 24 percent. The Queen City Sand formation is Eocene age and includes sand and clay, so we plan for changing material rather than assuming one consistent layer.

How do we bore through Arp’s sandy clay loam?

We adapt the Arp bore plan to sandy clay loam beneath Lilbert loamy fine sand, with staged reaming where loose surface material could fall into the hole.

  1. Lilbert loamy fine sand is mapped across 48 percent of Arp, so we use wall building drilling fluid and staged reaming to limit cave in.
  2. Where sandy clay loam lies about 40 inches down, we manage fluid and reamer size to keep the deeper clay from gripping the pipe.
  3. Seasonal water tables are mapped within 60 inches on 19 percent of the area, so we keep pits compact and pump them if water collects.
  4. At Kickapoo Creek, we plan a route below the channel and check for federal jurisdiction before selecting the crossing approach.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

What is in the way of a new line in Arp near Kickapoo Creek?

Texas State Highway 135 runs 2.4 mapped roadway miles inside Arp, and Texas State Highway 64 runs 1.7. Both need a planned route that accounts for pavement and the state right of way. Longview Street is the longest named street at 2.38 miles in the city; Main Street runs 1.66 miles and Front Street 1.15. Those street lengths give route context, but the exact bore path still depends on the address, marked lines and crossing points.

CrossingTypeMapped extentWho has a say
Texas State Highway 135State highway2.4 roadway miles insideState highway office
Texas State Highway 64State highway1.7 roadway miles insideState highway office
Union PacificRailroad2.1 track miles insideThe railroad
Kickapoo CreekStream1.93 channel miles insideChecked for Corps of Engineers jurisdiction
Caney CreekStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
Henson CreekStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Wright BranchStream nearby0.9 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific owns 2.1 track miles inside Arp on its Palestine Subdivision, and public mapping shows 4 street and rail crossings. A bore under the track needs an agreement from Union Pacific that sets crossing conditions. Kickapoo Creek runs 1.93 channel miles in the city, with 3 mapped street crossings of named streams. Creek work is planned for depth and access, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction.

Do I need a permit to bore under Texas State Highway 135 in Arp?

A crossing beneath Texas State Highway 135 needs at least 60 inches of cover below the lowest crossed grade for electric and communication lines or water lines; pressurized sewer also needs 60 inches at a crossing. TxDOT’s Tyler District reviews the utility permit. The utility owner files through TxDOT’s online RULIS system, and we prepare the bore plan and profile for its application. Existing highway pavement is crossed by boring or tunneling, with the bore extending beneath all travel lanes on rural highways. Arp street work falls under the city, while a Union Pacific track crossing needs the railroad’s agreement. Kickapoo Creek is checked for federal jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines in Arp and Smith County?

The City of Arp public water system uses groundwater wells and reports 592 service connections for 1,249 people. For electric service, Oncor Electric Delivery Company, Southwestern Electric Power, Cherokee County Electric Cooperative Association, Upshur Rural Electric Cooperative and Wood County Electric Cooperative report service in Smith County. Those county reports do not identify the provider at every Arp address, so we confirm the line owner before planning an electric conduit bore.

Line ownerWhat it isSourceSize
City of ArpPublic water systemGroundwater wells592 connections, 1,249 people served
Oncor Electric Delivery Company, Southwestern Electric Power, Cherokee County Electric Cooperative Association, Upshur Rural Electric Cooperative and Wood County Electric CooperativeElectric utilities reporting service in Smith CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Arp’s median housing year at 1968; 42 percent of homes were built before 1960, 38 percent from 1960 to 1999 and 20 percent in 2000 or later. Work on older streets such as Front Street may involve replacement lines, while newer service routes can add connections. We use hydrovac potholing to expose marked lines near the City of Arp water system and the electric provider confirmed for the address, since paint gives position but not depth.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

Where is Arp in relation to Overton and other nearby places?

Arp is in Smith County, at an elevation of 499 feet and within 2.62 square miles. ZIP code 75750 serves the city. Overton is 5.8 miles northeast, Troup is 6.9 miles southwest, New London is 7.8 miles northeast, New Chapel Hill is 8.5 miles northwest and Whitehouse is 9.8 miles west. Tyler, the county seat, is 16.1 miles northwest. From our Yukon, Oklahoma main office, the road distance to Arp is 333 miles and the drive takes 6.6 hours, which affects mobilization for work near Longview Street or Kickapoo Creek.

Places near Arp

What kinds of bores come up in Arp near Main Street?

  • Highway crossing: A bore under Texas State Highway 135 stays beneath the travel lanes and follows the cover depth set for the line type.
  • Water service: A connection from the City of Arp groundwater system can be routed beneath Main Street after nearby lines are exposed.
  • Fiber route: A fiber conduit near Longview Street can be bored beneath pavement, with the route checked against marked utilities.
  • Creek crossing: A line under Kickapoo Creek needs planned depth and a jurisdiction check before the bore path is set.
  • Rail crossing: A bore beneath Union Pacific’s Palestine Subdivision needs the railroad’s agreement for the track crossing.
  • Street connection: Work along Front Street can place water, sewer or conduit without cutting the street surface.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a bore in Arp near Longview Street?

A map pin matters in Arp because a route near Longview Street can have different crossings from one near Kickapoo Creek. Send the job address or pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans help us identify the route, access and marked crossings before we scope the bore.

In Arp, soil and crossing conditions lead the price review: Lilbert loamy fine sand can require staged reaming, while deeper sandy clay loam can hold and grip the hole. We also account for the number of utilities to expose, pavement at Texas State Highway 135, Union Pacific track or creek crossings, pits, excavator time and sand backfill. The 333 road miles from Yukon affect mobilization, and high profile or emergency work can add planning needs.

Questions people ask about boring in Arp

Does Trinity take directional boring work in Arp and Smith County, and how is it staffed?

Yes, we take directional boring projects in Arp and Smith County. Our own crews and crews at satellite yards operated by drilling contractors we have vetted can staff the work. You work with Trinity from the first call through the bore log, including when a partner contractor’s crew is on site near Main Street.

What does a bore beneath Union Pacific track in Arp require?

A bore beneath Union Pacific track in Arp requires an agreement from the railroad that owns it. That agreement sets crossing details such as casing, depth and flagging. The local track is part of Union Pacific’s Palestine Subdivision, so the railroad’s conditions need to be established before the crossing plan is finalized.

Can a line be bored under Kickapoo Creek in Arp?

A line can be planned beneath Kickapoo Creek in Arp, subject to the site conditions and crossing review. The stream runs 1.93 channel miles within the city, and mapped streets cross named streams at 3 points. During planning, the creek crossing is checked for U.S. Army Corps of Engineers jurisdiction.

Who runs Arp’s public water system and where does its water come from?

The City of Arp runs the public water system, which draws water from groundwater wells. It reports 592 service connections and serves 1,249 people. A new connection near Front Street still needs route planning and exposure of marked lines before the drill approaches the existing water infrastructure.

Which electric provider should I check with in Arp and Smith County before a conduit bore?

Confirm the electric line owner for the Arp address before planning a conduit bore. Oncor Electric Delivery Company, Southwestern Electric Power, Cherokee County Electric Cooperative Association, Upshur Rural Electric Cooperative and Wood County Electric Cooperative report service in Smith County, but the county list does not assign a provider to every address.

Does the city control Front Street in Arp, and does a bore require cutting it?

Arp controls its city streets, including Front Street. A directional bore can pass beneath the street without cutting its surface, subject to the route and utility clearances. We expose marked utilities along the planned path before drilling near them, since surface marks show a line’s position but not its depth.

How much notice does Texas811 need for a bore on Longview Street in Arp?

For a bore on Longview Street, Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.

How far is Arp from Yukon, and does Whitehouse affect the job?

Arp is 333 road miles and a 6.6 hour drive from our Yukon, Oklahoma main office. Whitehouse is 9.8 miles west of Arp and is the nearest larger city. The Yukon distance can affect mobilization; the Whitehouse location does not change the need to plan the bore around Arp’s actual route and crossings.

What affects the cost of a bore under Texas State Highway 135 in Arp?

The Arp job’s soil and crossing scope matter, including the mapped Lilbert loamy fine sand, utility exposures and pavement at Texas State Highway 135. Pipe or conduit size, bore length, creek or rail crossings, pits, excavator time and sand backfill also shape the work. Mobilization from Yukon and high profile or emergency conditions are considered as well.

Where the Arp facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Arp

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Arp, Texas

Type the address of your job in Arp. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Arp

Same county: Tyler · Lindale · Bullard · Hideaway · Emerald Bay · Noonday · Winona. All counties: Texas county list.