trinityboringsolutions.com

Easton Texas Directional Boring: Kullit Soil, BNSF Railway, Sabine River

Quick Answer: BNSF Railway and the Sabine River are key crossings to plan around; we take directional boring, also called horizontal directional drilling (HDD), work in Easton, Texas. Easton is 353 road miles from our Yukon, Oklahoma main office, so a route near FM 2906 affects mobilization planning. Kullit soil is common here, and clay loam below the surface can grip the pipe. We plan the bore path, expose marked lines and track the drill as it advances.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Easton bores at a glance

  • Incorporated city in Gregg County and Rusk County, Texas. Population 513 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 353 miles, about 6.8 hours of driving.
  • Ground: Kullit soil is mapped on 20 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 11 percent of the area.
  • Highways inside the boundary: FM 2906. State permit office: TxDOT Tyler District.
  • Railroad track inside the boundary: BNSF Railway, with 4 mapped street and rail crossings.
  • Named streams inside the boundary: Sabine River.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near BNSF Railway in Easton?

We take directional boring work in Easton, including Gregg County, where the Census Bureau Vintage 2024 estimate puts the population at 513. For underground utility work in Easton, we install water, sewer, gas, electric conduit and fiber lines. On Kennedy or South Main, the route and existing lines help determine where a service connection or conduit bore can run.

Our main office is in Yukon, Oklahoma, and Easton work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, with directional boring work since 1982. That experience covers the range from small service lines to casing for crossings such as the BNSF Railway track in Easton.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show for Kullit soil in Easton?

The USDA soil survey maps Kullit across 20 percent of Easton, with Kullit very fine sandy loam, 1 to 3 percent slopes, as its largest named map unit. Fine sandy loam is mapped at the surface across 37 percent, and very fine sandy loam across 23 percent. At about 40 inches below the surface, sandy clay loam covers 34 percent and clay loam 33 percent. These mapped patterns point to ground that can hold the bore open but may become sticky around the reamer.

USDA soil survey, inside the Easton city limitsWhat is mapped
Soil series mappedKullit 20 percent, Bowie 15 percent, Sacul 10 percent, Wrightsville 9 percent and Kirvin 8 percent
Texture at the surfacefine sandy loam 37 percent, very fine sandy loam 23 percent and loam 13 percent
Texture about 40 inches downsandy clay loam 34 percent, clay loam 33 percent and clay 19 percent
Engineering class about 40 inches downlean clay (CL) 53 percent, fat clay (CH) 15 percent and silty clayey sand (SC SM) 11 percent
Average clay content about 40 inches down29 percent
Bedrock mapped within 60 inches11 percent of the area (0 percent hard rock, 11 percent weathered rock)
Seasonal water table within 60 inches69 percent of the area
Flood prone soils3 percent of the area
High corrosion risk for uncoated steel75 percent of the area

At about 40 inches, the mapped clay content averages 29 percent; heavy clay is mapped across 26 percent. Bedrock is mapped within five feet in 11 percent of Easton, and that mapped bedrock is weathered; hard bedrock is not mapped at that depth. A seasonal water table is mapped within 60 inches across 69 percent, while flood prone soils cover 3 percent. High steel corrosion risk covers 75 percent, so the line owner should consider casing and tracer wire materials. The map includes alluvial clay, silt, sand, and gravel of Pleistocene age, plus Early Eocene sedimentary rock of Paleogene age.

How do we bore through sandy clay loam in Easton?

Easton soil maps show sandy clay loam at about 40 inches and seasonal water tables in many areas. We use the planned route, marked utilities and changing ground conditions to set the bore and reaming sequence.

  1. Kullit soil is mapped across 20 percent of Easton; we plan for sticky clay loam by reaming in stages and pulling pipe while the bore remains open.
  2. With seasonal water tables mapped within 60 inches across 69 percent of the city, we plan compact pits and pumping where wet ground fills them.
  3. Before the drill approaches marked lines on Kennedy or Main, we use hydrovac potholing to expose each one and verify its depth.
  4. We track the drill head from the surface and log depth and pitch as it advances beneath FM 2906 or toward a Sabine River crossing.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

Could a bore cross the Sabine River near Easton?

FM 2906 runs through Easton, while Texas State Highway 149 lies 0.1 miles outside the city limits. A route on either road needs its own review of pavement and right of way. Kennedy is the longest named street at 1.38 miles in the city; Pegues Road runs 1.13 miles and South Main 0.93 miles. Main covers 0.9 miles. These street lengths help locate a route, but the exact address and marked utilities determine the bore alignment.

CrossingTypeMapped extentWho has a say
FM 2906State highway1.4 roadway miles insideState highway office
Texas State Highway 149Highway nearby0.1 miles outsideState highway office
BNSF RailwayRailroad1.43 track miles insideThe railroad
Sabine RiverStream2.17 channel miles insideChecked for Corps of Engineers jurisdiction
Cherokee BayouStream nearby0.2 miles outsideChecked for Corps of Engineers jurisdiction
Watt CreekStream nearby0.3 miles outsideChecked for Corps of Engineers jurisdiction
Lake CherokeeLake or pond2,453 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

BNSF Railway has 1.43 track miles inside Easton, on the BNSF Railway Longview Subdivision, and 4 mapped street and rail crossings make track clearance a planning concern. The Sabine River runs 2.17 channel miles through the city. None of the mapped street crossings is over a named stream, but any planned river crossing needs a check for U.S. Army Corps of Engineers jurisdiction. Lake Cherokee is within one mile, outside the city limits.

Who approves a bore near FM 2906 in Gregg County in Easton?

Easton is incorporated, so its city streets belong to the city itself; FM 2906 and Texas State Highway 149 are state routes. A utility line in their right of way needs a TxDOT utility permit, reviewed for Gregg County by the TxDOT Tyler District. The line owner files through TxDOT’s online RULIS system, and we prepare the bore plan and profile for that filing. Cover depth sets the route beneath the road: electric and communication lines need 60 inches at crossings, water lines 60 inches, and pressurized sewer lines 60 inches. A BNSF Railway crossing needs an agreement with the railroad, and any Sabine River crossing is checked for Corps jurisdiction.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines near Easton in Gregg County?

The water provider for the specific Easton address has to be confirmed with the city, the county or the local water district before a bore is planned. EPA drinking water records do not identify a provider tied to the town. Southwestern Electric Power, Rusk County Electric Cooperative and Upshur Rural Electric Cooperative report electric service in Gregg County. We confirm the line owner for the address before planning an electric conduit bore near Kennedy or FM 2906.

Line ownerWhat it isSourceSize
Southwestern Electric Power, Rusk County Electric Cooperative and Upshur Rural Electric CooperativeElectric utilities reporting service in Gregg County and Rusk CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The survey puts Easton’s median housing year at 1989, a detail we consider when planning underground work in Easton. The survey estimates 11 percent of homes were built before 1960, 70 percent from 1960 to 1999, and 19 percent in 2000 or later; we consider this Easton housing profile when planning underground work. On streets such as Main, a bore may serve a newer connection or replace an older line. We expose marked utilities with hydrovac potholing before drilling near them, since surface marks show position, not depth.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

How far is Easton from Tatum and our Yukon office?

Easton covers 2.44 square miles across Gregg County and Rusk County, at an elevation of 271 feet. We reference ZIP codes 75603 and 75641 when coordinating boring work in Easton. Lake Cherokee is 3.8 miles southwest, Tatum is 6.2 miles southeast, Lakeport is 7.1 miles west, Hallsville is 8.2 miles north and Beckville is 12.4 miles southeast. Longview, the county seat and nearest larger city, is 13.8 miles northwest. The Yukon yard is 353 road miles away, a 6.8 hour drive, which factors into mobilization for work near FM 2906.

Places near Easton

What would we bore near Kennedy in Easton?

  • Highway crossing: A bore under FM 2906 stays beneath the pavement, with the utility owner’s permit and cover requirements shaping the alignment.
  • Water service: A service route on Kennedy needs its address specific water provider confirmed before we plan the connection bore.
  • Fiber conduit: A route along South Main can use a bore to pass beneath pavement without cutting the street surface.
  • River crossing: A proposed bore under the Sabine River needs channel planning and a check for U.S. Army Corps of Engineers jurisdiction.
  • Rail crossing: A bore beneath the BNSF Railway track needs the railroad’s agreement to set crossing conditions.
  • Street service: Near Pegues Road, potholing marked utilities before drilling helps establish their actual depth along the planned route.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a directional boring quote near Main in Easton?

Start with a map pin or address near Main, Kennedy or the Sabine River crossing. The precise location shows which street, track or water feature the bore route must account for. Include what is going underground, the pipe or conduit size and the footage. A sketch or plans help us review access and the proposed path.

The Easton route sets the scope, not footage alone. Kullit soil and clay loam affect drilling and reaming; BNSF Railway, the Sabine River and road pavement can add crossing work. Pipe size, exposed utilities, pits, sand backfill and excavator time also matter. At 353 road miles from Yukon, mobilization is part of the estimate, along with any high profile or emergency requirements.

Questions people ask about boring in Easton

Does Trinity Boring Solutions take Easton jobs in Gregg County, and who staffs them?

Yes. We take Easton work in Gregg County and handle it with our own crews or partner contractor crews from satellite yards. When planning a bore in Easton, we connect you with Trinity from the first call through the bore log, regardless of which crew is on site. A route near FM 2906 helps us plan the job and mobilization.

Does Kullit soil in Easton create a steel corrosion concern, and what pipe can be used?

The USDA soil survey maps high steel corrosion risk across 75 percent of Easton, including areas mapped as Kullit soil. The line owner should weigh that risk when choosing steel casing or tracer wire coatings. HDPE is not affected by soil corrosion, so material selection depends on the line and crossing design.

What ground should I expect around Kullit soil in Easton at about 40 inches?

The USDA soil survey maps sandy clay loam across 34 percent of Easton at about 40 inches, with clay loam across another 33 percent. Kullit is the leading mapped soil series. That mix can make the reamer sticky, so the drill plan may use staged reaming and manage fluid to keep the hole workable.

Is there rock near the surface for an Easton bore?

Weathered bedrock is mapped within five feet across 11 percent of Easton, while hard bedrock is not mapped within that depth. That does not rule out deeper rock along a particular route. The mapped alluvial deposits include clay, silt, sand and gravel, so the actual bore path still needs site specific planning.

Who approves an Easton bore beneath FM 2906?

TxDOT reviews a utility permit for work in the FM 2906 right of way through the TxDOT Tyler District. The utility that owns the line submits the application in RULIS; we prepare the bore plan and profile. Cover requirements help set the depth beneath the road, and the permit can specify project conditions.

Who owns the Easton track at BNSF Railway, and what does a bore need?

BNSF Railway owns the 1.43 track miles mapped inside Easton. A bore beneath its track needs an agreement with the railroad, which sets the crossing conditions, including casing, depth and flagging. If the line also occupies highway right of way, TxDOT asks for a copy of that agreement.

What bore lengths and sizes can Trinity handle for an Easton job near Main?

For Easton boring work, we handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. For a route near Main, the pipe or conduit, crossing conditions and ground all shape the plan. We review the proposed alignment and access before setting the bore sequence.

How much 811 notice do I need for an Easton bore near Kennedy?

Texas811 needs a locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If a Kennedy bore starts more than 14 days after the original notice, make a new request. Before work continues in Easton, we refresh worn or moved marks through Texas811.

What affects the cost of an Easton directional bore near FM 2906?

The route, length, pipe size, soil, exposed utilities, pavement, crossings, pits and equipment time all affect the estimate. Kullit soil can influence reaming; a BNSF Railway or Sabine River crossing adds planning needs. Mobilization also reflects the 353 road miles from Yukon, and high profile or emergency work can change the scope.

Where the Easton facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Easton

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Easton, Texas

Type the address of your job in Easton. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Easton

County: Rusk County directional boring. Same county: Kilgore · White Oak · Gladewater · Liberty City · Clarksville City · Warren City · Henderson · Overton · New London · Mount Enterprise · Reklaw. All counties: Texas county list.