Elmo Texas Directional Boring: Crockett Soil, US 80 and Muddy Cedar Creek
Quick Answer: Can we get your line under US 80, the Union Pacific track or Muddy Cedar Creek without cutting the surface? Trinity Boring Solutions uses directional boring, also called horizontal directional drilling (HDD), for those Elmo crossings. Our Yukon main office is 257 road miles away, and FM 2728 is another route to consider. Crockett soil overlies clay at depth; sticky clay can load a reamer, so staged passes and controlled fluid matter.
Elmo bores at a glance
- Unincorporated community in Kaufman County, Texas. Population 803 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 257 miles, about 5.2 hours of driving.
- Ground: Crockett soil is mapped on 50 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 50 percent of the area.
- Highways inside the boundary: US 80 and FM 2728. State permit office: TxDOT Dallas District.
- Railroad track inside the boundary: Union Pacific, with 2 mapped street and rail crossings.
- Named streams inside the boundary: Muddy Cedar Creek.
- Public water: Elmo Water Supply Corporation, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near Elmo and Union Pacific?
Can we put a new line beneath US 80 or the Union Pacific track without cutting the surface? Yes, we take directional boring work in Elmo, Kaufman County. The 2020 Census count for Elmo is 803; the Census Bureau does not publish yearly estimates for unincorporated places. A water, sewer, gas, electric conduit or fiber line could run along Emerald Lane or cross FM 2728, depending on your route.
Our main office is in Yukon, Oklahoma, and Elmo work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1982, four decades of directional boring have taught us to account for sticky ground like the clay mapped under Crockett soil near Elmo. Our family business started in 1965, and you work with Trinity through the bore log whichever crew is on site.

How does Crockett soil affect drilling in Elmo?
The USDA soil survey maps Crockett soil across 50 percent of Elmo, including Crockett fine sandy loam on 1 to 3 percent slopes and on eroded 2 to 5 percent slopes. Lufkin, Mabank, Kemp and Normangee are also mapped. The surface is mostly fine sandy loam, but about 40 inches down, clay is mapped across 83 percent of the area and average clay content is 42 percent. Those are soil survey patterns, not test borings. For a bore near Grabbs Lane, sticky clay at depth may cling to the reamer and grip pipe.
| USDA soil survey, inside the Elmo mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Crockett 50 percent, Lufkin 15 percent, Mabank 12 percent, Kemp 6 percent and Normangee 5 percent |
| Texture at the surface | fine sandy loam 79 percent, clay loam 8 percent and loam 6 percent |
| Texture about 40 inches down | clay 83 percent, sandy clay loam 6 percent and clay loam 4 percent |
| Engineering class about 40 inches down | fat clay (CH) 71 percent and lean clay (CL) 23 percent |
| Average clay content about 40 inches down | 42 percent |
| Bedrock mapped within 60 inches | 50 percent of the area (0 percent hard rock, 50 percent weathered rock) |
| Seasonal water table within 60 inches | 7 percent of the area |
| Flood prone soils | 9 percent of the area |
| High corrosion risk for uncoated steel | 76 percent of the area |
The USDA soil survey maps bedrock within five feet in 50 percent of Elmo, and that mapped bedrock is weathered; hard bedrock is not mapped within that depth. Seasonal water tables are mapped within 60 inches in 7 percent of the area, and flood prone soils in 9 percent. High steel corrosion risk is mapped across 76 percent, so the line owner should consider casing and tracer wire materials; On underground work in Elmo, HDPE helps us avoid that soil corrosion concern along the bore route. The geologic map names Smectitic clay decomposition residuum of Cenozoic age, a clay and sand unit that can call for controlled fluid and staged reaming.
How do crews handle clay while boring in Elmo?
Crockett soil covers much of Elmo, while clay is common below the surface. We plan the bore around sticky cuttings and watch fluid returns, especially where US 80 pavement is nearby.
- Crockett clay can stick to the reamer and tighten around pipe, so we use thinner fluid with polymer and advance through staged reaming.
- Near US 80 pavement, we watch fluid returns and keep pressure controlled so drilling does not lift the surface.
- Before drilling close to marked utilities on Grabbs Lane, we hydrovac pothole them because paint shows position, not depth.
- At Muddy Cedar Creek, we track the drill head from the surface and log depth and pitch while planning below the channel.

Where might a line go under Grabbs Lane in Elmo?
US 80 and FM 2728 run inside the mapped Elmo community boundary, with 2.6 roadway miles of US 80 and 3.9 miles of FM 2728 mapped there. Texas highway pavement is bored beneath rather than cut without approval. Grabbs Lane is the longest named street at 0.49 miles, followed by Emerald Lane at 0.3 miles. The mapped public road network totals 22.21 miles, so a route may need to pass beneath a street or driveway while leaving its surface intact.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 80 | US highway | 2.6 roadway miles inside | State highway office |
| FM 2728 | State highway | 3.9 roadway miles inside | State highway office |
| Union Pacific | Railroad | 0.64 track miles inside | The railroad |
| Muddy Cedar Creek | Stream | 1.49 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Rocky Cedar Creek | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
| New Terrell City Lake | Lake or pond | 821 acres, inside | Checked for Corps of Engineers jurisdiction |
Union Pacific owns 0.64 track miles inside Elmo on its Mineola Subdivision, and two street and rail crossings are mapped. A crossing there calls for an agreement with Union Pacific that establishes its requirements for casing, depth and flagging. Muddy Cedar Creek runs 1.49 channel miles inside the community, with two mapped street crossings of named streams. New Terrell City Lake is also inside the boundary, so a planned water crossing needs a jurisdiction check during planning.
Do I need a permit for Elmo work in Kaufman County?
Elmo is an unincorporated community with no city government, so street and permit authority belongs to Kaufman County or the state, depending on the route. For work in the right of way of US 80 or FM 2728, the line owner, not the driller, files the TxDOT utility permit in RULIS. We give the owner the bore plan and profile and work under its permit. For Elmo work, we account for TxDOT Dallas District review when setting the schedule for a directional bore. Highway cover depends on the line: electric and communication crossings need 60 inches, water crossings need 60 inches, and pressurized sewer crossings need 60 inches. The permit can set another depth.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the Elmo Water Supply Corporation lines in Elmo?
Elmo Water Supply Corporation is the local government owned public water system. It uses purchased surface water and reports 825 service connections serving 2,475 people. That gives a water line proposal near Emerald Lane a specific system to check against, but the address and line owner still need confirming. Electric service reported in Kaufman County includes Oncor Electric Delivery Company, Farmers Electric Cooperative and Trinity Valley Electric Cooperative. We confirm the line owner for the address before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Elmo Water Supply Corporation | Public water system | Surface water bought from another system | 825 connections, 2,475 people served |
| Oncor Electric Delivery Company, Farmers Electric Cooperative and Trinity Valley Electric Cooperative | Electric utilities reporting service in Kaufman County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Elmo’s median housing year at 1986; 9 percent of homes were built before 1960, 68 percent from 1960 to 1999 and 23 percent in 2000 or later. A replacement line near Grabbs Lane may have older buried utilities to work around, while newer services can mean a different route. For the US 80 crossing in Elmo, we hydrovac pothole each marked utility on the bore path before drilling near it. For example, a line planned under Emerald Lane gets marked utilities exposed before the drill approaches.

Do you cover Elmo and nearby Terrell?
Elmo is an unincorporated community in Kaufman County, at an elevation of 538 feet and with 4.0 square miles of land. ZIP code 75161 serves the area. Terrell is 8.5 miles west and is the nearest larger place; Wills Point is 8.8 miles east, Poetry 9.3 miles northwest, Oak Ridge 10.3 miles southwest and Hawk Cove 10.8 miles north. County seat Kaufman is 14.6 miles southwest. From our Yukon, Oklahoma main office, Elmo is 257 road miles and a 5.2 hour drive, which is part of planning mobilization for a US 80 bore.
Places near Elmo
- Directional boring in Terrell: 8.5 miles west
- Directional boring in Wills Point: 8.8 miles east
- Directional boring in Poetry: 9.3 miles northwest
- Directional boring in Oak Ridge: 10.3 miles southwest
- Directional boring in Hawk Cove: 10.8 miles north
What boring work comes up near Muddy Cedar Creek in Elmo?
- Highway crossing: A bore under US 80 keeps the roadway uncut, with the line owner’s permit and crossing depth guiding the plan.
- Street service: A route along Emerald Lane can use a bore to cross a driveway without opening the paved or traveled surface.
- Rail crossing: A line under the Union Pacific Mineola Subdivision needs the railroad’s agreement to set crossing details.
- Creek crossing: A bore under Muddy Cedar Creek is planned below the channel, with jurisdiction checked during planning.
- Water service: A connection near Elmo Water Supply Corporation lines needs the specific address and existing utility route confirmed.
- State road crossing: Work beneath FM 2728 pavement is bored, and the TxDOT utility permit is filed by the line owner.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send to quote a bore under US 80 in Elmo?
For a line beneath US 80, start with where the route begins and ends, such as an address or map pin near FM 2728. Tell us what goes underground, whether water or fiber, then give the pipe or conduit size and footage. A sketch or plans showing the street, creek or Union Pacific track crossing helps us see the route before we plan it.
A short route with clear access near Emerald Lane and no pavement or creek crossing is simpler to plan. Length, pipe size, Crockett clay, marked utilities to expose, pits and excavator time all affect the work. A bore beneath US 80 or Union Pacific track brings crossing requirements into the plan; Muddy Cedar Creek adds a water crossing to check. Mobilization also reflects the 257 road miles from Yukon, and high profile or emergency work can change the scope.
Questions people ask about boring in Elmo
Does Trinity take directional boring jobs in Elmo, Kaufman County?
Yes. We take Elmo work with our own crews and vetted drilling contractor partners operating from satellite yards. From the first call through the bore log, we coordinate with Trinity for Elmo work, whichever crew is on site. That applies to a planned route beneath US 80 or a service near Emerald Lane.
How old are Elmo’s homes and buried lines near Emerald Lane?
The American Community Survey 2019 to 2023 five year estimates put the median year built at 1986. It estimates 9 percent of homes were built before 1960 and 68 percent from 1960 to 1999. A replacement bore near Emerald Lane may need to avoid older buried lines, so marked utilities are exposed before drilling nearby.
Does Crockett soil in Elmo corrode steel, and what pipe can I use?
The USDA soil survey maps high steel corrosion risk across 76 percent of Elmo, so the line owner should consider casing and tracer wire materials. On underground work in Elmo, HDPE helps us avoid that soil corrosion concern along the bore route. The right material depends on the line and crossing, including a possible route beneath Grabbs Lane.
What ground will an Elmo bore pass through around Crockett soil?
Crockett soil is mapped across 50 percent of Elmo. The surface is mostly fine sandy loam, while about 40 inches down clay is mapped across 83 percent of the area and averages 42 percent clay. These USDA soil survey patterns, not test borings, indicate sticky cuttings may need staged reaming.
Will a bore in Elmo hit rock, and how much bedrock is mapped?
The USDA soil survey maps bedrock within five feet in 50 percent of Elmo, and the mapped bedrock is weathered. Hard bedrock is not mapped at that depth. Conditions can differ along a particular route, so a proposed bore near FM 2728 still needs planning for the ground it encounters.
Who approves an Elmo bore under US 80?
TxDOT reviews a utility permit for work in the US 80 right of way through its Dallas District. The line owner files in RULIS, not the drilling contractor; we supply the bore plan and profile for that filing. The permit establishes the requirements for the specific crossing.
How far is Elmo from Trinity’s Yukon office, and does Terrell affect the job?
From our Yukon, Oklahoma main office, we plan around the 257 road miles and a 5.2 hour drive to Elmo. Terrell is 8.5 miles west of Elmo, but a nearby place does not remove the distance for crew mobilization. Route length, access and whether the bore crosses US 80 also shape planning.
How much 811 notice does a bore near Elmo’s Grabbs Lane need?
Count back at least 48 hours from the planned start, excluding Saturdays, Sundays and legal holidays, and do not request the ticket more than 14 days early. If the start slips more than 14 days past the original notice for a Grabbs Lane bore, make a new request. Before work continues on the Elmo crossing, we refresh worn or moved marks through Texas811.
What shapes the cost of a directional bore under US 80 in Elmo?
The route, length, pipe or conduit size, Crockett clay, marked utilities, pavement, pits and excavator time all affect the job. A US 80 crossing has highway requirements to plan around, while a route near Muddy Cedar Creek may involve a water crossing. Mobilization from Yukon also matters because Elmo is 257 road miles away.
Where the Elmo facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Elmo
- U.S. Census Bureau, TIGER/Line 2024: Elmo boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Elmo population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Elmo housing units and year built
- Macrostrat geologic map compilation: map units under Elmo
- U.S. EPA Safe Drinking Water Information System: public water systems serving Elmo
- U.S. Department of Transportation, North American Rail Network: track owners in Kaufman County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Kaufman County
- U.S. Geological Survey, Elevation Point Query Service: Elmo elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Elmo
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Elmo
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Elmo, Texas
Type the address of your job in Elmo. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Elmo
Same county: Forney · Kaufman · Crandall · Mabank · Talty · Travis Ranch · Combine · Kemp · Post Oak Bend · Scurry · Oak Grove · Grays Prairie. All counties: Texas county list.