trinityboringsolutions.com

New Berlin Texas Directional Boring: Branyon Clay, FM 775 and Cibolo Creek

Quick Answer: Need a line beneath FM 775 without opening the pavement? We handle directional boring, also called horizontal directional drilling (HDD), in New Berlin for crossings like this. The Yukon main office is 474 road miles away, and Cibolo Creek is one local feature to plan around. Branyon clay is common here and can cling to the reamer, so the drilling plan matters. We can bore under roads and creek banks without cutting across them.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

New Berlin bores at a glance

  • Incorporated city in Guadalupe County, Texas. Population 711 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 474 miles, about 8.9 hours of driving.
  • Ground: Branyon soil is mapped on 24 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 12 percent of the area.
  • Highways inside the boundary: FM 775, FM 2538 and FM 467. State permit office: TxDOT San Antonio District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Cibolo Creek, Cibola Creek, Santa Clara Creek and Deadman Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring in New Berlin, Guadalupe County?

Can we get a line under a New Berlin road or creek without cutting across it? Yes, we take directional boring work in Guadalupe County, including routes near Gin Road and Cibolo Creek. The Census Bureau Vintage 2024 estimate puts New Berlin’s population at 711. We install water, sewer, gas, electric conduit and fiber, including service lines routed beneath local streets or creek banks.

Our main office is in Yukon, Oklahoma, and New Berlin work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore was roughly 4,100 feet of 48 inch pipe under the Arkansas River in Tulsa. A typical New Berlin job, such as a service line crossing near Gin Road, is much shorter and planned for its own ground and access.

Trinity Boring Solutions branded compact directional drilling unit positioned beside a tree on a red dirt jobsite
Our compact directional drill set up beside a tree on a tight site. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show beneath New Berlin and Branyon soil?

The USDA soil survey maps Branyon across 24% of New Berlin, and Branyon clay map units include areas with 0 to 1 percent slopes and 1 to 3 percent slopes. Clay makes up 54% of the mapped surface texture. At about 40 inches below the surface, clay is mapped across 71% of the area, with average clay content at that depth of 46%. Mapped Branyon, Heiden, Crockett, and Windthorst soil patterns help us plan New Berlin bores, but they are not test borings. On a route near FM 775, the actual ground still needs to be checked as the bore is planned.

USDA soil survey, inside the New Berlin city limitsWhat is mapped
Soil series mappedBranyon 24 percent, Heiden 22 percent, Crockett 12 percent, Windthorst 10 percent and Lewisville 10 percent
Texture at the surfaceclay 54 percent, loam 18 percent and fine sandy loam 13 percent
Texture about 40 inches downclay 71 percent, silty clay 11 percent and sandy clay 10 percent
Engineering class about 40 inches downfat clay (CH) 72 percent and lean clay (CL) 27 percent
Average clay content about 40 inches down46 percent
Bedrock mapped within 60 inches12 percent of the area (0 percent hard rock, 12 percent weathered rock)
Seasonal water table within 60 inches1 percent of the area
Flood prone soils7 percent of the area
High corrosion risk for uncoated steel83 percent of the area

Bedrock is mapped within 60 inches across 12% of New Berlin, and the mapped bedrock there is weathered; hard bedrock is not mapped at that depth. The USDA geology map identifies the Wilcox Group, undivided, of Ypresian age, with mudstone, sandstone, shale and siltstone. Seasonal water tables are mapped within 60 inches across 1%, while flood prone soils cover 7%, so Cibolo Creek routes need channel depth planning. High steel corrosion risk is mapped across 83%, which makes the line owner’s casing and tracer wire material choices relevant.

How do we plan a directional boring crossing near FM 775 through New Berlin clay?

New Berlin’s heavy clay can stick to the reamer and grip pipe. On a route near Gin Road, we plan fluid and reaming to suit the ground, then coordinate the pull with the open hole.

  1. Branyon clay can ball onto a reamer and grip the pipe, so we use staged reaming and plan the pull while the hole is open.
  2. With heavy clay mapped near FM 775, we watch fluid returns and keep pressure controlled to reduce the chance of lifting pavement.
  3. At a Cibolo Creek route, we plan the bore depth beneath the channel and check jurisdiction during crossing planning.
  4. Where steel casing or tracer wire is considered near Gin Road, the line owner weighs the mapped high corrosion risk and selects materials.
Reel of 4 inch HDPE conduit on the exit side of a 385 foot directional bore under creeks and wetland in Guthrie, Oklahoma
A reel of 4 inch HDPE conduit on the exit side of a 385 foot bore under creeks and wetland in Guthrie, Oklahoma.

What is in the way of a new line near New Berlin Gin Road?

FM 775 runs 6.5 mapped roadway miles inside New Berlin, while FM 2538 has 1.6 miles and FM 467 has 0.9 miles. Interstate 10 and US 90 run along or touch the city limits. Gin Road is the longest named street at 4.03 miles in the city, followed by Linne Road at 3.76 miles and Santa Clara Road at 3.21 miles. A bore route across any of these roads needs a plan for pavement, access and existing utilities.

CrossingTypeMapped extentWho has a say
FM 775State highway6.5 roadway miles insideState highway office
FM 2538State highway1.6 roadway miles insideState highway office
FM 467State highway0.9 roadway miles insideState highway office
Interstate 10Highway nearbyRuns along or touches the city limitsState highway office
US 90Highway nearbyRuns along or touches the city limitsState highway office
Cibolo CreekStream3.76 channel miles insideChecked for Corps of Engineers jurisdiction
Cibola CreekStream3.73 channel miles insideChecked for Corps of Engineers jurisdiction
Santa Clara CreekStream3.31 channel miles insideChecked for Corps of Engineers jurisdiction
Deadman CreekStream1.56 channel miles insideChecked for Corps of Engineers jurisdiction
Dry Santa Clara CreekStream1.31 channel miles insideChecked for Corps of Engineers jurisdiction
Buzzard CreekStream0.75 channel miles insideChecked for Corps of Engineers jurisdiction
Elm CreekStream0.12 channel miles insideChecked for Corps of Engineers jurisdiction
Martinez CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Blue CreekStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside New Berlin or within one mile outside its limits, and no street and rail crossings are mapped in the city. Cibolo Creek runs 3.76 channel miles inside New Berlin, and five mapped street crossings of named streams call for careful route planning. Cibola Creek and Santa Clara Creek also run through the city. No lakes or ponds are mapped within one mile, so the crossing work centers on streets and streams.

Do I need a permit to bore beneath FM 775 in New Berlin?

For a bore within FM 775 right of way, the utility owner applies for the TxDOT utility permit through RULIS; the TxDOT San Antonio District reviews it. We prepare the bore plan and profile for the owner’s application and work under its permit. TxDOT rules require boring or tunneling beneath existing highway pavement, with encasement and a bore extending beneath all travel lanes on rural highways. New Berlin city streets such as Gin Road belong to the city. A Cibolo Creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried in New Berlin, Guadalupe County?

The water provider for a specific New Berlin address has to be confirmed with the city, Guadalupe County or the local water district before a bore is planned. Electric service reported in Guadalupe County includes AEP Texas Central, City of New Braunfels, City of San Antonio, City of Seguin, Bluebonnet Electric Cooperative, Guadalupe Valley Electric Cooperative and Pedernales Electric Cooperative. Those countywide reports do not identify the electric line owner at every address, so we confirm the owner before planning a conduit bore near FM 775.

Line ownerWhat it isSourceSize
AEP Texas Central, City of New Braunfels, City of San Antonio, City of Seguin, Bluebonnet Electric Cooperative, Guadalupe Valley Electric Cooperative and Pedernales Electric CooperativeElectric utilities reporting service in Guadalupe CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put New Berlin’s median housing year at 1994; before a Gin Road bore, we verify underground conditions. The survey estimates 16% of housing was built before 1960, 45% from 1960 to 1999 and 39% in 2000 or later. That mix can mean a route along Santa Clara Road serves either a replacement line or a newer connection. Before drilling near marked utilities, we hydrovac pothole each one on the bore path; paint shows position, not depth.

Trinity Boring Solutions technician hydrovac daylighting along a commercial curbline during utility locating in Oklahoma City
Hydrovac daylighting along a commercial curb line in Oklahoma City to find the utilities before a bore.

What is near New Berlin, including Marion?

New Berlin is an incorporated city in Guadalupe County, with 9.63 square miles of land and an elevation of 585 feet. ZIP codes serving the area are 78155, 78124 and 78121. Zuehl is 2.8 miles northwest, Marion is 6.1 miles north, St. Hedwig is 7.6 miles southwest, Santa Clara is 7.8 miles northwest and McQueeney is 8.5 miles northeast. Cibolo, the nearest larger city, is 8.6 miles northwest; Seguin, the county seat, is 11.0 miles northeast. The Yukon yard is 474 road miles and a 8.9 hour drive away.

Places near New Berlin

What boring work comes up near New Berlin Linne Road?

  • Highway crossing: A bore beneath FM 775 is planned around pavement, the TxDOT right of way and the utility owner’s permit.
  • Street crossing: A service line beneath Gin Road can avoid cutting the road surface, with marked utilities exposed along the route.
  • Creek crossing: A route under Cibolo Creek needs channel depth planning and a check for federal jurisdiction during planning.
  • Water service: A connection near Linne Road starts with confirming the provider for that specific address.
  • Electric conduit: Near Santa Clara Road, we confirm the line owner before setting conduit size and route.
  • Drainage crossing: The unnamed drainage across New Berlin calls for route planning around pits and water flow.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a New Berlin bore near Cibolo Creek?

For a quote near Cibolo Creek or Linne Road, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help us see the route. That gives us a starting picture of the work before we look at the crossings and site conditions.

The 474 road miles from Yukon affect mobilization for New Berlin work. Branyon clay can change drilling and reaming, while a crossing beneath FM 775 brings pavement and permit planning into the scope. Cibolo Creek or drainage crossings, the number of utilities to expose, pits, excavator time and sand backfill also affect the work. Pipe size, bore length and any high profile or emergency conditions help shape the plan.

Questions people ask about boring in New Berlin

Does Trinity Boring Solutions take jobs in New Berlin, Guadalupe County, and how are crews assigned?

Yes. We take directional boring work in New Berlin and across Texas, including planning around FM 2538 within city limits. Our own crews and partner drilling contractors Trinity has personally vetted handle the field work, while you deal with Trinity from the first call through the bore log. That applies to a service route near Gin Road as well as a crossing near Cibolo Creek.

Is there rock under New Berlin, and how much is mapped within five feet?

The USDA soil survey maps bedrock within 60 inches across 12% of New Berlin, and the mapped bedrock is weathered. Hard bedrock is not mapped within that depth, but the survey does not rule out rock deeper down. A route near FM 2538 still needs a plan that accounts for the conditions encountered along its alignment.

Who approves a bore under FM 775 in New Berlin?

TxDOT reviews a utility permit for work in FM 775 right of way through its San Antonio District. The utility owner submits the application in RULIS, using the bore plan and profile we prepare. For a crossing beneath existing highway pavement, TxDOT rules call for boring or tunneling rather than open trenching.

Can you bore a line beneath Cibolo Creek in New Berlin?

A bore beneath Cibolo Creek can be planned to cross without cutting the creek bank. The route needs enough depth under the channel, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. Cibolo Creek runs 3.76 channel miles within New Berlin, so the alignment and access points matter.

Which electric company owns lines in New Berlin, Guadalupe County?

County reports name several providers, including AEP Texas Central, Guadalupe Valley Electric Cooperative and Bluebonnet Electric Cooperative, among others. Those reports do not establish the owner at a particular New Berlin address. We confirm the line owner before planning an electric conduit bore near a street such as Santa Clara Road.

Does New Berlin control Santa Clara Road, and can a bore avoid cutting it?

New Berlin is incorporated, so its city streets, including Santa Clara Road, belong to the city. Directional boring can route a line under the street surface instead of opening a trench across it. Marked utilities on the planned path still need to be exposed before drilling near them.

Can I reach Trinity after hours about an urgent New Berlin bore near Santa Clara Road?

Yes. A person answers Trinity’s phone 24 hours a day at (405) 409-7423, including after hours. If the urgent work is near Santa Clara Road, have the address or map pin and the line details ready so we can understand the location and scope.

How early should I call Texas811 before a New Berlin bore near Gin Road?

Submit the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before the start. If work near Gin Road slips more than 14 days past the original notice, make a new request. Before we continue work near Cibolo Creek, worn or moved marks must be refreshed through Texas811.

What affects the cost of a directional bore beneath FM 775 in New Berlin?

The scope drives the price: length, pipe or conduit size, Branyon clay, utility exposures and pavement all matter. A crossing under FM 775 also brings right of way planning into the work. Creek or drainage crossings, pits, excavator time, sand backfill, emergency conditions and mobilization from Yukon can change the job requirements.

Where the New Berlin facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in New Berlin

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in New Berlin, Texas

Type the address of your job in New Berlin. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for New Berlin

Same county: Seguin · Schertz · New Braunfels · Redwood · Selma · Lake Dunlap · Geronimo · Staples · Kingsbury. All counties: Texas county list.