Quick Answer: The City of San Marcos owns the public water and electric systems, so a bore near Guadalupe Street starts with confirming which buried lines are in its path. Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), in San Marcos, including routes beneath Interstate 35 without cutting pavement. San Marcos is 430 road miles from our Yukon, Oklahoma main office, and Union Pacific track crossings need their own planning. Houston Black soil is sticky and can grip pipe, so the drilling fluid and reaming plan matter.
San Marcos bores at a glance
- County seat of Hays County, with part of the city in Caldwell County, Texas. Population 74,316 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 430 miles, about 8.3 hours of driving.
- Ground: Houston Black soil is mapped on 17 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 27 percent of the area.
- Highways inside the boundary: Interstate 35, Texas State Highway 123, RM 12, Texas State Highway 21 and Texas State Highway 80. State permit office: TxDOT Austin District.
- Railroad track inside the boundary: Union Pacific, with 26 mapped street and rail crossings.
- Named streams inside the boundary: Blanco River, Purgatory Creek, San Marcos River and Willow Springs Creek.
- Public water: City of San Marcos, surface water.
- Electric: City of San Marcos municipal electric system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring in San Marcos along Interstate 35?
San Marcos is the Hays County seat, with 74,316 residents in the Census Bureau Vintage 2024 estimate. We install water, sewer, gas, electric conduit and fiber along routes such as Guadalupe Street and McCarty Lane, where existing pavement and buried services can make a trench disruptive. Directional boring lets those lines pass below the surface; the line owner and exact route still need confirming.
Our main office is in Yukon, Oklahoma, and San Marcos work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For San Marcos, our size range runs from 3/4 inch service lines for a single connection to 48 inch casing for a major utility crossing near Interstate 35. Trinity is a family business started in 1965, and we have drilled directionally since 1982; the route and ground decide what equipment the job needs.

What does Houston Black soil mean for a San Marcos bore?
The USDA soil survey maps Houston Black soil across 17 percent of San Marcos. Its map units include Houston Black clay, while Branyon clay and Lewisville silty clay are also mapped. At about 40 inches below the surface, clay is mapped across 54 percent of the area; average clay content there is 47 percent, and heavy clay covers 63 percent. Clay can hold an open bore, but it sticks to the reamer and may swell around pipe. These maps guide planning, but they are not a soil boring at a particular Guadalupe Street address.
| USDA soil survey, inside the San Marcos city limits | What is mapped |
|---|---|
| Soil series mapped | Houston Black 17 percent, Branyon 16 percent, Comfort 15 percent, Heiden 10 percent and Lewisville 8 percent |
| Texture at the surface | clay 57 percent, very stony clay 15 percent and silty clay 13 percent |
| Texture about 40 inches down | clay 54 percent, bedrock 26 percent and silty clay 9 percent |
| Engineering class about 40 inches down | fat clay (CH) 57 percent and lean clay (CL) 11 percent |
| Average clay content about 40 inches down | 47 percent |
| Bedrock mapped within 60 inches | 27 percent of the area (23 percent hard rock, 4 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 7 percent of the area |
| High corrosion risk for uncoated steel | 92 percent of the area |
The soil survey gives a typical bedrock depth of 19 inches and maps bedrock within 60 inches across 27 percent of San Marcos, including hard bedrock across 23 percent. No seasonal water table is mapped within 60 inches, while flood prone soils cover 7 percent. High steel corrosion risk is mapped across 92 percent, so the line owner should consider casing and tracer wire materials; HDPE avoids that soil concern. Holocene alluvium along streams includes sand, silt, clay and gravel, so a creek route needs its own ground plan.
How do we plan a bore through San Marcos clay so our underground route accounts for the ground conditions?
Houston Black clay can stay open but cling to the reamer and pipe. Along San Marcos routes near Guadalupe Street or a mapped creek, we adjust the fluid, reaming sequence and depth to the ground and the crossing.
- Houston Black clay can cling to the reamer, so we use a thinner fluid mix and polymer, open the hole in stages and pull pipe while the bore remains ready.
- Heavy clay is mapped across 63 percent of San Marcos at about 40 inches, so we watch fluid returns and keep pressure controlled beneath pavement near Guadalupe Street.
- Holocene alluvium follows San Marcos streams and can include sand and gravel; staged reaming and a prepared pipe help manage ground that may cave behind the drill.
- At a Blanco River or Purgatory Creek crossing, we track the drill head from the surface, log depth and pitch, and plan the route below the channel.

What could a bore cross near Guadalupe Street in San Marcos?
Interstate 35 has 25.1 mapped roadway miles inside San Marcos. Texas State Highway 123 and RM 12 each have 8.6 miles in the city, while Texas State Highway 21 has 7.9. Texas State Highway 142 is 1.2 miles outside the limits. Guadalupe Street runs 5.7 miles inside the city; McCarty Lane runs 3.76 miles and Hunter Road runs 3.5. These routes bring pavement, driveways and buried utilities into the bore plan, and a crossing under existing highway pavement must be bored or tunneled.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 35 | Interstate | 25.1 roadway miles inside | State highway office |
| Texas State Highway 123 | State highway | 8.6 roadway miles inside | State highway office |
| RM 12 | State highway | 8.6 roadway miles inside | State highway office |
| Texas State Highway 21 | State highway | 7.9 roadway miles inside | State highway office |
| Texas State Highway 80 | State highway | 5.2 roadway miles inside | State highway office |
| Loop 82 | State highway | 3.9 roadway miles inside | State highway office |
| FM 2439 | State highway | 3.5 roadway miles inside | State highway office |
| FM 110 | State highway | 3.2 roadway miles inside | State highway office |
| FM 621 | State highway | 1.4 roadway miles inside | State highway office |
| FM 1984 | State highway | 0.5 roadway miles inside | State highway office |
| Texas State Highway 142 | Highway nearby | 1.2 miles outside | State highway office |
| Union Pacific | Railroad | 15.35 track miles inside | The railroad |
| Blanco River | Stream | 5.91 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Purgatory Creek | Stream | 5.49 channel miles inside | Checked for Corps of Engineers jurisdiction |
Union Pacific has 15.35 track miles inside San Marcos, with 26 mapped street and rail crossings. A route near the track needs railroad coordination as well as room for bore pits. The Blanco River runs 5.91 channel miles in the city, and Purgatory Creek runs 5.49; 40 street crossings of named streams are mapped. Spring Lake covers 17 acres inside the limits. Creek and lake routes need depth and access planning before drilling.
What does a San Marcos bore near Union Pacific need?
For work in San Marcos on Interstate 35, Texas State Highway 123, RM 12 or another state route, the utility that owns the line files the TxDOT permit through RULIS. TxDOT’s Austin District reviews it, and we prepare the bore plan and profile for the owner’s application. Cover depends on the line: electric and communication crossings need 60 inches below the lowest crossed grade, water crossings need 60 inches, and pressurized sewer crossings need 60 inches. A different depth can be set in the permit. Work beneath existing highway pavement is bored or tunneled.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the lines near the City of San Marcos water system, and how do we confirm the route before boring?
The City of San Marcos owns the public water system, which uses surface water and reports 42,746 service connections serving 72,970 people. Because San Marcos owns its municipal electric system, we account for city owned utility lines when planning underground work. Before a conduit bore near Guadalupe Street, we confirm the line owner and the conduit specifications for that route; the electric system’s ownership does not identify the position or depth of each buried line.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of San Marcos | Public water system | Surface water | 42,746 connections, 72,970 people served |
| City of San Marcos municipal electric system | City owned electric system | Reports to the U.S. Energy Information Administration | 25,492 customers reported |
| City of San Marcos, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative | Electric utilities reporting service in Hays County and Caldwell County | EIA Form 861 | Confirm the line owner by address |
American Community Survey 2019 to 2023 five year estimates put the median San Marcos housing year at 1998. The estimates show 11 percent of housing built before 1960, 41 percent from 1960 to 1999, and 48 percent in 2000 or later. A McCarty Lane project could involve replacement work or a newer service connection. We hydrovac pothole marked utilities on the bore path first, since surface marks show position, not depth.

Do you cover San Marcos and nearby Redwood?
San Marcos covers 39.93 square miles in Hays County and extends into Caldwell County. The city sits at an elevation of 575 feet and uses ZIP codes 78666 and 78656. Redwood is 4.7 miles south; Martindale is 6.2 miles east, and Kyle is 8.9 miles north. San Marcos is the Hays County seat, while Austin is 31.3 miles north. Our Yukon yard is 430 road miles away, an 8.3 hour drive; that distance is part of planning crew and equipment mobilization for a San Marcos bore.
Places near San Marcos
- Directional boring in Redwood: 4.7 miles south
- Directional boring in Martindale: 6.2 miles east
- Directional boring in Kyle: 8.9 miles north
- Directional boring in Staples: 10.2 miles southeast
- Directional boring in Uhland: 11 miles northeast
- Directional boring in Austin: 31.3 miles north
Which jobs call for a bore near McCarty Lane in San Marcos?
- Highway crossing: A route beneath Interstate 35 can carry water or conduit without cutting existing highway pavement, subject to the utility owner’s permit.
- Water service: A connection near Guadalupe Street needs a route checked against the City of San Marcos water system and other marked lines.
- Fiber conduit: A run along McCarty Lane can pass below pavement and driveways, with potholing to verify marked utilities before drilling nearby.
- Creek crossing: A bore beneath the Blanco River needs a planned depth and a check for U.S. Army Corps of Engineers jurisdiction.
- Rail crossing: A route beneath Union Pacific track needs the railroad’s crossing agreement, with casing, depth and flagging details set for that crossing.
- Park utility: A water or conduit route near Rio Vista Park needs an entry and exit plan that accounts for nearby stream corridors.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near Stagecoach Trail in San Marcos?
For a Stagecoach Trail bore, give us the address or map pin, what is going in the ground, the pipe or conduit size and the footage. A sketch or plans help show nearby streets, utilities and the entry and exit pits, so we can review the route before choosing a drilling setup.
A clear route through open ground near Stagecoach Trail is simpler to plan than a crossing crowded with utilities. The answer changes with length, pipe size, Houston Black clay or rock, exposed utilities, pavement and creek crossings. A route under Interstate 35 or beside Union Pacific track adds crossing coordination and design detail. Pit access, excavator time, sand backfill and emergency timing also shape the scope. San Marcos is 430 road miles from Yukon, so mobilization matters too.
Questions people ask about boring in San Marcos
Does Trinity Boring Solutions take San Marcos jobs in Hays County, and who does the work?
Yes. We take directional boring work in San Marcos and keep the customer’s contact with Trinity from the first call through the bore log. Our own crews or crews from satellite yards run by partner contractors we have vetted may staff the job. The route and schedule near Guadalupe Street help determine the crew plan.
What does a bore under Union Pacific track in San Marcos require from us before we plan the crossing?
A bore under Union Pacific track needs an agreement from the railroad that owns it. That agreement sets the crossing details, including casing, depth and flagging. San Marcos has 15.35 track miles inside the city, so identify the exact track and route before fixing the bore plan.
Can a San Marcos line go under the Blanco River?
A line can be planned beneath the Blanco River, but the route needs a suitable bore depth and a check for U.S. Army Corps of Engineers jurisdiction during planning. The river runs 5.91 channel miles inside San Marcos. We review the crossing and access conditions before selecting the bore path.
Who runs San Marcos public water, and where does the water come from?
The City of San Marcos owns and operates the public water system, and its source is surface water. Public records report 42,746 service connections and 72,970 people served. For a bore near Guadalupe Street, the planned route still needs to be checked against the water lines already in the ground.
Who owns electric lines in San Marcos and Hays County, and who confirms conduit specs?
The City of San Marcos owns its municipal electric system. Confirm the line owner for the particular address and check conduit specifications with that owner before planning a bore near McCarty Lane. Knowing who owns the system does not show the position or depth of each buried line on a specific route.
Who controls San Marcos streets like Hunter Road, and does a bore require cutting them?
Since San Marcos is incorporated, we treat its city streets as city owned when planning boring routes. A directional bore can pass beneath Hunter Road without cutting the street surface, using pits on either side of the crossing. The route still needs to account for marked utilities and any applicable road or right of way requirements.
Does Trinity cover San Marcos, Redwood and rural sites nearby?
Yes. We take work in San Marcos, nearby Redwood and rural sites in the area. Redwood is 4.7 miles south of San Marcos, and the route and access at each address shape the crew plan. Send the location and scope so we can assess the particular crossing or service run.
How early should I request a San Marcos locate for a bore along Guadalupe Street?
The excavator or person responsible for the work requests the locate through Texas811 at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. Texas811 describes notice as at least two working days, so we schedule San Marcos boring work around that lead time. If the start slips more than 14 days past the notice, request a new ticket; worn or moved marks must be refreshed through Texas811 before work continues.
What affects the cost of directional boring in San Marcos near Interstate 35?
For San Marcos boring, we base pricing on the job scope, including the ground conditions and crossing requirements. Length, pipe or conduit size, Houston Black clay or rock, utility crossings, pavement, creek crossings and pit work all affect the plan. A crossing beneath Interstate 35 or Union Pacific track takes added coordination, and San Marcos’s 430 road miles from Yukon affect mobilization.
Where the San Marcos facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside San Marcos
- U.S. Census Bureau, TIGER/Line 2024: San Marcos boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: San Marcos
- U.S. Census Bureau, American Community Survey 2019 to 2023: San Marcos housing units and year built
- Macrostrat geologic map compilation: map units under San Marcos
- U.S. EPA Safe Drinking Water Information System: public water systems serving San Marcos
- U.S. Department of Transportation, North American Rail Network: track owners in Hays County and Caldwell County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Hays County and Caldwell County
- U.S. Geological Survey, Elevation Point Query Service: San Marcos elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to San Marcos
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in San Marcos
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in San Marcos, Texas
Type the address of your job in San Marcos. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for San Marcos
Same county: Buda · Dripping Springs · Wimberley · Woodcreek · Mountain City · Niederwald · Bear Creek · Hays · Driftwood · Creedmoor · Belterra. All counties: Texas county list.