Eustace Texas Directional Boring: Woodtell Soil, US 175 and Union Pacific Track
Quick Answer: Eustace is an incorporated small city, so city streets such as Henderson Street belong to the city; we do directional boring, also called horizontal directional drilling (HDD), for routes near US 175. The Yukon main office is 280 road miles away, with US 175 in town shaping access and mobilization. Woodtell soil is common here, and heavy clay deeper down can cling to the reamer and pipe. Dry Creek sits just outside the limits, so a route near it needs crossing review.
Eustace bores at a glance
- Incorporated city in Henderson County, Texas. Population 1,153 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 280 miles, about 5.5 hours of driving.
- Ground: Woodtell soil is mapped on 37 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 15 percent of the area.
- Highways inside the boundary: US 175, FM 316, RM 2329 and FM 2709. State permit office: TxDOT Tyler District.
- Railroad track inside the boundary: Union Pacific, with 4 mapped street and rail crossings.
- Public water: City of Eustace, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Does anyone do directional boring near US 175 in Eustace?
Eustace is an incorporated small city in Henderson County, so its city streets belong to the city itself. For underground work in Eustace, we account for a population of 1,153 in the Census Bureau Vintage 2024 estimate. We install water, sewer, gas, electric conduit and fiber on routes along streets such as Henderson Street or connecting to US 175, with the route and existing lines shaping the bore plan.
Our main office is in Yukon, Oklahoma, and Eustace work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We handle jobs from 3/4 inch service lines to 48 inch casing, from short service bores to long crossings. Our family business started in 1965 and has done directional boring since 1982; those capabilities apply to Eustace routes such as FM 316.

What kind of ground does Woodtell soil mean for an Eustace bore?
The USDA soil survey maps Woodtell soil across 37 percent of Eustace, with Freestone at 30 percent and Lufkin at 20 percent. Surface texture is mapped as loam across 60 percent of the area, while fine sandy loam accounts for 30 percent. About 40 inches down, clay is mapped across 65 percent and clay loam across 25 percent. Average clay content at that depth is 43 percent. These are mapped patterns, not test borings, so the actual route still needs field checks.
| USDA soil survey, inside the Eustace city limits | What is mapped |
|---|---|
| Soil series mapped | Woodtell 37 percent, Freestone 30 percent, Lufkin 20 percent, Wolfpen 8 percent and Nahatche 3 percent |
| Texture at the surface | loam 60 percent, fine sandy loam 30 percent and loamy fine sand 9 percent |
| Texture about 40 inches down | clay 65 percent, clay loam 25 percent and sandy clay loam 8 percent |
| Engineering class about 40 inches down | fat clay (CH) 87 percent, clayey sand (SC) 8 percent and lean clay (CL) 3 percent |
| Average clay content about 40 inches down | 43 percent |
| Bedrock mapped within 60 inches | 15 percent of the area (0 percent hard rock, 15 percent weathered rock) |
| Seasonal water table within 60 inches | 41 percent of the area |
| Flood prone soils | 3 percent of the area |
| High corrosion risk for uncoated steel | 70 percent of the area |
Weathered bedrock is mapped within 60 inches across 15 percent of Eustace, with a typical depth of 57 inches; hard bedrock is not mapped there within that depth. Seasonal water tables fall within 60 inches across 41 percent, so pits may need pumping. Flood prone soils cover 3 percent. High steel corrosion risk is mapped across 70 percent, a concern for casing and tracer wire. The Wilcox Group, undivided, is Paleogene and includes mudstone and sand, so ground conditions can change along a bore.
How is a bore run through Eustace clay?
Eustace soil maps show substantial clay at about 40 inches down. On a route by US 175 or Oak Street, we check actual ground and keep drilling fluid and reaming suited to the conditions.
- Woodtell soil covers 37 percent of Eustace. We check the route rather than treating the mapped soil series as a site specific test.
- Clay is mapped across 65 percent of the area at about 40 inches down. We use a thinner fluid mix and staged reaming where sticky clay holds the reamer.
- Heavy clay can grip pipe and build pressure, so near Oak Street we watch fluid returns and pull pipe the same day the hole is opened.
- Seasonal water tables are mapped within 60 inches across 41 percent of town. At a wet site near US 175, we keep pits small and pump as needed.

What is in the way of a new line in Eustace near Dry Creek?
US 175 runs through Eustace, along with FM 316, RM 2329 and FM 2709; Texas State Highway 334 is 0.8 miles outside the limits. Work in a highway right of way brings TxDOT review, while existing pavement calls for a bore or tunnel rather than an open cut. Among local streets, Oak Street runs 1.48 miles, Weakes Street 1.06 miles and Henderson Street 0.96 miles within the city. A route along any of them needs its marked lines checked before drilling.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 175 | US highway | 6.1 roadway miles inside | State highway office |
| FM 316 | State highway | 2.2 roadway miles inside | State highway office |
| RM 2329 | State highway | 0.9 roadway miles inside | State highway office |
| FM 2709 | State highway | 0.4 roadway miles inside | State highway office |
| Texas State Highway 334 | Highway nearby | 0.8 miles outside | State highway office |
| Union Pacific | Railroad | 2.29 track miles inside | The railroad |
| Dry Creek | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| South Twin Creek | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| Lynn Creek | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
| Mc Goughlin Branch | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific track runs 2.29 miles inside Eustace, and four street and rail crossings are mapped in town. A route that crosses the track needs an agreement with Union Pacific, which sets crossing conditions. No named stream crosses are mapped inside the city, but Dry Creek and South Twin Creek are each 0.1 miles from the limits. Unnamed drainage totals 0.59 miles in town, and none of the mapped street crossings is of a named stream. A creek route needs jurisdiction checked during planning.
Who approves an Eustace bore near Union Pacific track?
Eustace is incorporated, so its city streets, including Henderson Street, belong to the city; no city department or permit process is assumed here. For work in the right of way of US 175, FM 316, RM 2329 or FM 2709, the line owner files the utility permit in TxDOT’s online RULIS system, and the TxDOT Tyler District reviews it. We prepare the bore plan and profile for the owner’s application. TxDOT cover rules vary by line type, and the permit may require a different depth. A Union Pacific track crossing needs an agreement with the railroad. A planned Dry Creek crossing is checked for federal jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried in Henderson County near Eustace?
At the City of Eustace, we plan around groundwater wells and a public water system serving 1,638 people through 1,092 service connections. A bore near Oak Street or US 175 still needs the actual water line located along its proposed path. Oncor Electric Delivery Company and Trinity Valley Electric Cooperative report electric service in Henderson County. We confirm the line owner for the specific route before a conduit bore, since county reporting does not identify the provider at every address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Eustace | Public water system | Groundwater wells | 1,092 connections, 1,638 people served |
| Oncor Electric Delivery Company and Trinity Valley Electric Cooperative | Electric utilities reporting service in Henderson County | EIA Form 861 | Confirm the line owner by address |
For underground work in Eustace, we account for the American Community Survey 2019 to 2023 five year estimate placing the median housing year at 1988. Sixteen percent of homes were built before 1960, 45 percent from 1960 to 1999 and 39 percent in 2000 or later. A replacement bore along Weakes Street may meet older buried service lines, while newer construction can call for a new connection. We hydrovac expose marked utilities on the bore path before drilling near them; paint shows position, not depth.

How far is Eustace from Payne Springs and our Yukon office?
Eustace is in Henderson County, at an elevation of 428 feet, and covers 2.93 square miles. For Eustace underground work, we use ZIP code 75124 to identify the city area being served. Payne Springs is 4.0 miles southwest, and Log Cabin is 5.8 miles south. Gun Barrel City, the nearest larger city, is 7.0 miles west; Athens, the county seat, is 12.9 miles southeast. Our Yukon, Oklahoma main office is 280 road miles away, a 5.5 hour drive, which matters when setting mobilization for a bore near US 175.
Places near Eustace
- Directional boring in Payne Springs: 4 miles southwest
- Directional boring in Log Cabin: 5.8 miles south
- Directional boring in Enchanted Oaks: 6.2 miles southwest
- Directional boring in Caney City: 6.9 miles south
- Directional boring in Gun Barrel City: 7 miles west
Which jobs call for a bore near Henderson Street in Eustace?
- Highway crossing: A route beneath US 175 is bored or tunneled under existing pavement, with the line owner handling the TxDOT permit.
- Water service: A connection near the City of Eustace groundwater system follows the proposed route and located water lines.
- Fiber drop: A fiber route along Oak Street can pass beneath pavement without cutting the street surface.
- Creek crossing: A proposed route near Dry Creek needs channel depth planning and a jurisdiction check before drilling.
- Rail crossing: A line crossing the 2.29 miles of Union Pacific track in town needs the railroad’s agreement.
- Street replacement: A water or sewer replacement along Weakes Street can be bored past marked utilities rather than opened through the full route.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Eustace quote near Bent Tree Circle?
A map pin matters on Bent Tree Circle because the exact route determines which streets, buried lines and access points are involved. To scope boring in Eustace, we need the address or pin, what will go underground, the pipe or conduit size, and the footage. A sketch or plans help us assess the route, especially if it approaches US 175 or Union Pacific track.
The price follows the route and scope. Woodtell soil and the clay mapped below the surface affect drilling and reaming; crossings of US 175 or Union Pacific track add planning. We also consider bore length, pipe size, marked utilities to expose, pavement, creek or drainage crossings, pits, excavator time and sand backfill. Mobilization matters because Eustace is 280 road miles from Yukon. High profile or emergency work can add requirements to the plan.
Questions people ask about boring in Eustace
Does Trinity take directional boring jobs in Eustace and Henderson County?
Yes. We take directional boring work in Texas, including Eustace routes near US 175. Our own crews and partner contractor crews working from satellite yards are part of the service model, and Trinity stays responsible from the first call through the bore log. We need the route and line details to assess the work.
Can a line be bored under Dry Creek near Eustace?
A bore can be planned for a Dry Creek crossing, but the route and ground conditions must be reviewed first. The creek is 0.1 miles from Eustace city limits. We plan depth to stay beneath the channel, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Who runs Eustace’s public water system, and do we account for its groundwater wells?
The City of Eustace owns the public water system, which draws from groundwater wells. In Eustace, we account for service to 1,638 people through 1,092 service connections when planning underground work. For a bore near Oak Street, the proposed path still needs utility locating so the drilling plan accounts for water lines.
Which electric company should I check for a conduit bore in Eustace, Henderson County?
Oncor Electric Delivery Company and Trinity Valley Electric Cooperative report electric service in Henderson County. That countywide record does not identify the provider at every Eustace address. Before planning a conduit bore near US 175, confirm the line owner and the conduit specifications with that owner.
Does Eustace control Henderson Street, and does a bore require cutting it?
Eustace is incorporated, so Henderson Street is a city street. Directional boring can put a line beneath pavement without opening a trench through the street, subject to the route and applicable approvals. Marked utilities along the proposed path need to be exposed before the drill approaches them.
Do older buried lines near Weakes Street affect replacement bores in Eustace?
They can. The American Community Survey 2019 to 2023 estimates give Eustace a median housing year of 1988, with 16 percent of homes built before 1960. A replacement route near Weakes Street should account for existing services and utilities, which we expose at marked crossings before drilling nearby.
Can I reach Trinity after hours about an urgent Eustace bore near Henderson Street?
Yes. A person answers our phone 24 hours a day at (405) 409-7423. For an urgent bore near Henderson Street, be ready to describe the location, what line is involved and any immediate access or crossing issue so we can understand the request.
How far ahead do I call 811 for a bore by Oak Street in Eustace?
Contact Texas811 at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If an Oak Street start slips more than 14 days past the original notice, make a new request. Before we continue underground work in Eustace, we have worn or moved marks refreshed through Texas811.
What affects the cost of a directional bore near US 175 in Eustace?
The route, bore length and line size matter, as do Eustace’s clay soil, pavement and crossings of US 175 or Union Pacific track. We also account for utilities to expose, creek or drainage crossings, pits, excavator time, backfill and mobilization from Yukon. An exact map pin helps show which conditions apply.
Where the Eustace facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Eustace
- U.S. Census Bureau, TIGER/Line 2024: Eustace boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Eustace
- U.S. Census Bureau, American Community Survey 2019 to 2023: Eustace housing units and year built
- Macrostrat geologic map compilation: map units under Eustace
- U.S. EPA Safe Drinking Water Information System: public water systems serving Eustace
- U.S. Department of Transportation, North American Rail Network: track owners in Henderson County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Henderson County
- U.S. Geological Survey, Elevation Point Query Service: Eustace elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Eustace
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Eustace
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Eustace, Texas
Type the address of your job in Eustace. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Eustace
Same county: Athens · Chandler · Tool · Malakoff · Mabank · Seven Points · Brownsboro · Berryville · Trinidad · Star Harbor · Murchison · Poynor. All counties: Texas county list.