trinityboringsolutions.com

Lipan Texas Directional Boring: Granbury Soil, FM 4 And Weaver Branch

Quick Answer: Granbury very fine sandy loam is common in Lipan; clay at depth can cling to a reamer and grip pipe. We use directional boring, also called horizontal directional drilling (HDD), to place lines beneath Weaver Branch without opening its channel. Lipan is 271 road miles from our Yukon, Oklahoma main office, so mobilization is part of planning Caddo Street work. Bedrock is mapped within 40 inches across 53 percent of the city, so the route may need slower drilling.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Lipan bores at a glance

  • Incorporated city in Hood County, Texas. Population 546 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 271 miles, about 5.4 hours of driving.
  • Ground: Granbury soil is mapped on 51 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 59 percent of the area.
  • Highways inside the boundary: FM 4 and FM 1189. State permit office: TxDOT Fort Worth District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Weaver Branch.
  • Public water: City of Lipan, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring on Lipan’s Caddo Street?

We take directional boring work in Lipan, an incorporated city in Hood County. The Census Bureau Vintage 2024 estimate is 546 for Lipan; along Caddo Street, we plan boring around actual underground conditions. Along Caddo Street, Lipan Drive or Gafford Street, our crews can bore for water, sewer, gas, electric conduit or fiber, with the route and line type confirmed for the specific job.

Our main office is in Yukon, Oklahoma, and Lipan work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore ran roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa, Oklahoma. A Lipan job could be a shorter water service or fiber route beneath Caddo Street. We have been a family business since 1965 and have done directional boring since 1982.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

How does Lipan’s Granbury soil drill?

The USDA soil survey maps Granbury soil across 51 percent of Lipan. Granbury very fine sandy loam, 1 to 5 percent slopes, is the leading map unit at 42 percent. About 40 inches below the surface, bedrock is mapped across 53 percent of the area; clay loam accounts for 23 percent and clay for 11 percent. The survey maps no sandy area at that depth. Average clay content there is 36 percent, with heavy clay mapped across 25 percent. Granbury, Bosque, Hassee, and Blanket soil series show mapped patterns, so we verify site conditions before choosing a bore path. Clay can stick to a reamer and grip pipe, so the actual route matters.

USDA soil survey, inside the Lipan city limitsWhat is mapped
Soil series mappedGranbury 51 percent, Bosque 9 percent, Hassee 7 percent, Blanket 7 percent and Chaney 4 percent
Texture at the surfacevery fine sandy loam 51 percent, loam 16 percent and fine sandy loam 12 percent
Texture about 40 inches downbedrock 53 percent, clay loam 23 percent and clay 11 percent
Engineering class about 40 inches downlean clay (CL) 35 percent and fat clay (CH) 11 percent
Average clay content about 40 inches down36 percent
Bedrock mapped within 60 inches59 percent of the area (53 percent hard rock, 6 percent weathered rock)
Seasonal water table within 60 inches7 percent of the area
Flood prone soils10 percent of the area
High corrosion risk for uncoated steel16 percent of the area

Bedrock is mapped within 60 inches across 59 percent of Lipan, typically at 26 inches; hard bedrock accounts for 53 percent and weathered bedrock for 6 percent. That can mean slower drilling and a change in tooling. A seasonal water table within 60 inches is mapped across 7 percent, and flood prone soils across 10 percent. Those conditions matter for pit placement near Weaver Branch. The Lazy Bend Formation, of Moscovian age, includes black shale, limestone and sandstone; its presence makes site specific ground information useful when planning a bore.

How do crews handle Lipan bedrock?

Granbury soil and bedrock mapped near the surface call for a plan built around the actual route. Along Lipan Drive or near Weaver Branch, we check the ground, locate marked lines and choose the drilling approach for the crossing.

  1. In Granbury soil, we manage the sticky clay with drilling fluid suited to the ground, ream in stages and have pipe ready before opening the hole.
  2. Where bedrock is mapped within 40 inches in Lipan, we check the ground as the bore advances and allow for slower progress through harder material.
  3. Before approaching a marked line near the City of Lipan water system or an electric route, we use hydrovac potholing to expose it and verify its depth.
  4. At Weaver Branch, we plan the bore below the channel, track the drill head from the surface and record depth and pitch along the route.
Rock bit on the drill rod at the front of a Vermeer D24x40 S3 with broken sandstone at the entry of a rock bore in Guthrie, OK
Rock bit on the drill rod with broken sandstone at the entry of a rock bore in Guthrie, Oklahoma.

Which roads, tracks or creeks does a Lipan bore cross near Weaver Branch?

FM 4 and FM 1189 run inside Lipan, with mapped roadway lengths of 1.3 miles and 1.2 miles in the city. A bore in either highway right of way needs the state permit process. Caddo Street is the longest named street at 1.49 miles, followed by Lipan Drive at 1.27 miles and Gafford Street at 0.71 miles. Those routes help define where a line can pass beneath pavement rather than cut across it.

CrossingTypeMapped extentWho has a say
FM 4State highway1.3 roadway miles insideState highway office
FM 1189State highway1.2 roadway miles insideState highway office
Weaver BranchStream1.34 channel miles insideChecked for Corps of Engineers jurisdiction
Kickapoo CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Crockery CreekStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
Dry BranchStream nearby0.3 miles outsideChecked for Corps of Engineers jurisdiction
Baileys LakeLake or pond16 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Lipan or within 1 mile outside its limits, and no street and rail crossing is mapped in the city. Weaver Branch runs 1.34 channel miles through Lipan, where two street crossings of named streams are mapped. Kickapoo Creek touches or runs along the city boundary, while Crockery Creek is 0.1 miles away. Baileys Lake, a 16 acre lake, is within 1 mile but outside the city limits. Creek and lake crossings need their own route review.

Who approves a Lipan bore in Hood County?

Under FM 4 or FM 1189, the cover depth sets the bore profile: electric and communication lines need 60 inches at a highway crossing, water lines need 60 inches, and pressurized sewer lines need 60 inches. Work in the state highway right of way needs a TxDOT utility permit. The utility owner files through RULIS, and the TxDOT Fort Worth District reviews it; we prepare the bore plan and profile for that application. TxDOT requires boring or tunneling under existing highway pavement. Along Gafford Street, we treat the roadway as a Lipan city street when planning boring access and coordination. A Weaver Branch crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns lines near the City of Lipan water system?

The City of Lipan public water system draws from groundwater wells and lists 448 service connections serving 1,344 people. For an electric conduit route in Lipan, Oncor Electric Delivery Company, Texas-New Mexico Power, Tri-County Electric Cooperative and United Electric Cooperative Service report service in Hood County. We confirm the line owner for the specific route before planning a conduit bore. Around Caddo Street, hydrovac potholing can expose marked water or electric lines before the drill approaches.

Line ownerWhat it isSourceSize
City of LipanPublic water systemGroundwater wells448 connections, 1,344 people served
Oncor Electric Delivery Company, Texas-New Mexico Power, Tri-County Electric Cooperative and United Electric Cooperative ServiceElectric utilities reporting service in Hood CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

ACS 2019 to 2023 estimates place Lipan’s median housing year at 1973; near FM 1189, we verify underground conditions rather than infer them from age. It estimates 35 percent of housing was built before 1960, 55 percent from 1960 to 1999, and 10 percent in 2000 or later. Housing age does not establish the age of a buried line, but it helps frame replacement work versus a new service near Lipan Drive. We pothole marked lines on the route first; locate paint shows position, not depth.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

How far is Lipan from Horseshoe Bend?

Lipan is in Hood County, covers 1.06 square miles and sits at an elevation of 923 feet. Its ZIP code is 76462. Dennis is 8.9 miles northeast, Horseshoe Bend is 10.3 miles northeast, Brazos is 10.9 miles northwest, Santo is 11.4 miles northwest and Tolar is 11.6 miles southeast. Granbury, the county seat and nearest larger city, is 16.9 miles east. From our Yukon yard, the drive is 271 road miles and 5.4 hours, which is part of planning mobilization for a Lipan job.

Places near Lipan

What boring work comes up on Lipan’s Caddo Street?

  • Highway crossing: A route beneath FM 4 or FM 1189 stays below the pavement, with the utility owner’s TxDOT permit guiding the bore.
  • Water service: A new connection near Caddo Street can be planned around the City of Lipan system and its groundwater wells.
  • Fiber route: A line following Lipan Drive can pass beneath pavement by boring rather than opening a trench across the street.
  • Creek crossing: A Weaver Branch route needs a profile beneath the channel and a check for federal jurisdiction during planning.
  • Electric conduit: Near Gafford Street, we confirm the line owner and expose marked utilities before drilling close to them.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of directional boring near Lipan’s FM 4?

A map pin matters near Weaver Branch because the exact approach can change the creek crossing and pit locations. For a Lipan quote, send the address or pin, what is going in the ground, the pipe or conduit size and the footage. A sketch or plans help us assess a route along Caddo Street or beneath FM 4.

The price follows the route and scope. Granbury soil and bedrock affect drilling time; line size and bore length affect equipment and reaming. Crossings and exposed utilities add planning, especially near Weaver Branch or beneath FM 4 pavement. Concrete, pits, excavator time and sand backfill can also shape the work. Lipan is 271 road miles from Yukon, so mobilization matters. High profile or emergency work can require a different plan.

Questions people ask about boring in Lipan

Does Trinity Boring Solutions take Lipan directional boring jobs in Hood County, and who staffs them?

Yes. We take directional boring work in Lipan, and the job can be staffed by our crews or from a satellite yard operated by a partner drilling contractor we have vetted. You work with Trinity through the bore log. A route near Caddo Street is planned for its specific lines and ground.

Who controls Gafford Street in Lipan, and can a bore avoid cutting it?

Because Lipan is incorporated, we treat Brown Street as a city street when coordinating boring access. A bore along or across Gafford Street can be planned to pass beneath the pavement instead of opening a trench through it. The proposed route and any marked utilities still need to be checked before drilling.

Does Lipan Drive have older buried lines because Lipan has older housing?

Housing age does not prove the age of a buried line. The American Community Survey 2019 to 2023 estimates put Lipan’s median housing year at 1973, with 35 percent of housing built before 1960. For a replacement bore near Lipan Drive, we expose marked utilities before the drill approaches them.

Could water or flood prone ground affect bore pits near Lipan’s Weaver Branch?

It can affect pit planning in mapped areas. The USDA soil survey maps a seasonal water table within 60 inches across 7 percent of Lipan and flood prone soils across 10 percent. Near Weaver Branch, we plan the route and pits for the crossing and check for U.S. Army Corps of Engineers jurisdiction.

What ground does a Lipan bore pass through in Granbury soil?

Granbury soil is mapped across 51 percent of Lipan, often as very fine sandy loam. At about 40 inches, clay loam and clay are mapped, and the survey reports average clay content of 36 percent. Clay can cling to the reamer, so the drilling plan accounts for the ground on a Caddo Street route.

How much of Lipan has bedrock near the surface, and is it hard or weathered?

The USDA soil survey maps bedrock within 60 inches across 59 percent of Lipan and within 40 inches across 53 percent. Hard bedrock is mapped across 53 percent, while weathered bedrock is mapped across 6 percent. These patterns can mean slower drilling, including on a route near FM 4.

Can I reach Trinity after hours about an urgent Lipan bore on Gafford Street?

Yes. Near Kickapoo Creek, we answer Trinity’s phone 24 hours a day at (405) 409-7423 for Lipan project questions. For an urgent issue involving a proposed Gafford Street bore, call to discuss the line, location and timing. Trinity also provides 24 hour emergency response.

How much notice does Texas811 need for a Lipan bore along Caddo Street?

Request a locate through Texas811 at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. On FM 4, we allow at least two working days for Texas811 notice before boring starts, as Texas811 describes. If a Caddo Street start slips more than 14 days past the original notice, make a new request; worn or moved marks need refreshing before work continues.

What affects the cost of a Lipan directional bore near FM 4?

The route and scope drive the price, including bore length, line size, Granbury soil and bedrock, utility crossings, pavement, creek crossings, pits and equipment time. Work beneath FM 4 can involve highway permit requirements and a longer plan. Lipan’s 271 road miles from Yukon also affect mobilization.

Where the Lipan facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Lipan

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Lipan, Texas

Type the address of your job in Lipan. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Lipan

Same county: Pecan Plantation · DeCordova · Oak Trail Shores · Cresson · Canyon Creek · Stockton Bend. All counties: Texas county list.