trinityboringsolutions.com

Tioga Texas Directional Boring: Crockett Loam, US 377 and Union Pacific

Quick Answer: Crockett soil is sticky, so we plan each bore to manage clay around US 377 and other routes in Tioga. Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), for lines crossing Tioga streets and the Union Pacific track. Our Yukon, Oklahoma main office is 176 road miles away, with US 377 access shaping the route plan. Heavy clay can grip a pipe, so staged reaming and a same day pull help keep the hole moving.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Tioga bores at a glance

  • Incorporated city in Grayson County, Texas. Population 1,288 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 176 miles, about 3.5 hours of driving.
  • Ground: Crockett soil is mapped on 55 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 72 percent of the area.
  • Highways inside the boundary: US 377, US 377 Business, FM 922 and FM 121. State permit office: TxDOT Paris District.
  • Railroad track inside the boundary: Union Pacific, with 4 mapped street and rail crossings.
  • Public water: City of Tioga, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring in Tioga and Grayson County?

Crockett loam is common under Tioga, and our crews plan for its sticky clay when routing utilities. We take work in Grayson County, where the Census Bureau Vintage 2024 estimate puts the population at 1,288. Water, sewer, gas, electric conduit and fiber can run beneath streets such as Main Street or along a planned route connecting properties.

Our main office is in Yukon, Oklahoma, and Tioga work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Trinity is a family business that started in 1965 and has done directional boring since 1982. Our record of no utility strike in over 25 years matters around the City of Tioga groundwater system and lines reported by electric providers in Grayson County.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What ground should a Tioga bore expect in Crockett soil?

The USDA soil survey maps Crockett soil across 55% of Tioga, including Crockett loam map units. At about 40 inches below the surface, clay makes up 80% of the mapped texture; average clay content there is 43%. The surface is more often loam, mapped across 56%, or clay loam, mapped across 23%. For Tioga, mapped soil patterns inform boring plans, but we do not treat them as test borings. For a bore, the clay down below can stay around the open hole, stick to the reamer and swell against the pipe.

USDA soil survey, inside the Tioga city limitsWhat is mapped
Soil series mappedCrockett 55 percent, Normangee 23 percent, Wilson 11 percent, Callisburg 4 percent and Gasil 3 percent
Texture at the surfaceloam 56 percent, clay loam 23 percent and silty clay loam 11 percent
Texture about 40 inches downclay 80 percent, silty clay 11 percent and sandy clay 4 percent
Engineering class about 40 inches downfat clay (CH) 82 percent and lean clay (CL) 17 percent
Average clay content about 40 inches down43 percent
Bedrock mapped within 60 inches72 percent of the area (0 percent hard rock, 72 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils1 percent of the area
High corrosion risk for uncoated steel94 percent of the area

Weathered bedrock is mapped within 60 inches across 72% of Tioga, with typical depth at 53 inches; hard bedrock is not mapped in that interval. The Woodbine Formation, a Cenomanian unit, includes sandstone and mudstone, so a route may move from clay into slower, weathered rock. Seasonal water table soils are not mapped, and flood prone soils cover 1%. High steel corrosion risk is mapped across 94%, a concern for casing and tracer wire that the line owner should address.

How do crews bore through Tioga clay?

Crockett soil makes clay management central to a Tioga bore. We choose fluid and reaming steps around the mapped ground, then track the drill head so the route stays measured beneath streets such as Texas Street.

  1. Crockett clay can ball on a reamer, so we use thinner fluid with polymer and open the hole in stages before pulling pipe the same day.
  2. With heavy clay mapped beneath Tioga, we watch fluid returns closely and limit pressure near pavement so drilling fluid does not lift the surface.
  3. Where a route approaches the Woodbine Formation’s weathered rock, we account for slower drilling and check depth and pitch as the ground changes.
  4. Before drilling near marked lines on Main Street, we hydrovac pothole each utility on the path; paint shows position, not depth.
Rock bit on the drill rod at the front of a Vermeer D24x40 S3 with broken sandstone at the entry of a rock bore in Guthrie, OK
Rock bit on the drill rod with broken sandstone at the entry of a rock bore in Guthrie, Oklahoma.

Where might a Tioga line pass beneath US 377?

US 377 runs for 2.1 mapped roadway miles inside Tioga, and US 377 Business adds 0.8 miles. FM 922 and FM 121 also cross the town, so a route can involve a state highway as well as local streets. Ray Roberts Parkway is the longest named street at 1.69 miles, followed by Main Street at 1.51 miles and Texas Street at 1.13 miles. A bore can keep pavement and driveways uncut when a route passes beneath them.

CrossingTypeMapped extentWho has a say
US 377US highway2.1 roadway miles insideState highway office
US 377 BusinessUS highway0.8 roadway miles insideState highway office
FM 922State highway1.4 roadway miles insideState highway office
FM 121State highway1.3 roadway miles insideState highway office
Union PacificRailroad1.13 track miles insideThe railroad
Ray Roberts LakeLake or pond7,546 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific owns 1.13 track miles inside Tioga, and public records map 4 street and rail crossings. A bore beneath the track needs the railroad’s crossing agreement. No streams are mapped inside town, and none are mapped within one mile outside it. Ray Roberts Lake, a 7,546 acre lake, is within one mile beyond the limits; if a proposed route crosses lake waters, planning checks whether the U.S. Army Corps of Engineers has jurisdiction.

Do Tioga US 377 or Union Pacific bores need approval?

US 377, US 377 Business, FM 922 and FM 121 are state routes, so work in their right of way needs a TxDOT utility permit. The TxDOT Paris District reviews it. The utility that owns the line files through TxDOT’s online RULIS system; we prepare the bore plan and profile for that filing. TxDOT rules call for boring or tunneling beneath existing highway pavement, with cover and casing set by the applicable rules or permit. Since Tioga is incorporated, we coordinate street work with the city when planning directional boring routes. A bore under the Union Pacific track needs an agreement from the railroad, which sets crossing conditions.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are near the City of Tioga water system?

The City of Tioga public water system draws from groundwater wells and reports 649 service connections serving 938 people. That makes water lines a key conflict to check along a proposed Tioga route. Grayson County electric service is reported by Oncor Electric Delivery Company, Texas-New Mexico Power, Cooke County Electric Cooperative Association, Denton County Electric Cooperative, Fannin County Electric Cooperative and Grayson-Collin Electric Cooperative. We confirm the line owner for an electric conduit bore at the specific address.

Line ownerWhat it isSourceSize
City of TiogaPublic water systemGroundwater wells649 connections, 938 people served
Oncor Electric Delivery Company, Texas-New Mexico Power, Cooke County Electric Cooperative Association, Denton County Electric Cooperative, Fannin County Electric Cooperative and Grayson-Collin Electric CooperativeElectric utilities reporting service in Grayson CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

American Community Survey 2019 to 2023 five year estimates put Tioga’s median housing year at 2003; 10% of homes were built before 1960, while 54% date to 2000 or later. That mix can mean either a replacement route or a newer service near Main Street, but home age alone does not identify a pipe’s age. Before a drill approaches marked utilities, we hydrovac pothole them to check their actual depth beneath the proposed path.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

What places near Tioga, including Pilot Point, can our crews reach?

Tioga is in Grayson County at an elevation of 666 feet, with 1.97 square miles of land and ZIP code 76271. Pilot Point is 5.6 miles southwest and is the nearest larger city; Collinsville is 6.0 miles north, and Gunter is 6.7 miles southeast. Sherman, the county seat, is 19.8 miles northeast. From our Yukon, Oklahoma main office, the drive to Tioga is 176 road miles and 3.5 hours, which informs planning for work around US 377 and nearby communities.

Places near Tioga

What boring work may come up near Texas Street in Tioga?

  • Highway crossing: A bore beneath US 377 can keep the existing pavement intact while the route passes under the travel lanes.
  • Water service: A connection near the City of Tioga system needs a planned path around groundwater lines and other marked utilities.
  • Fiber route: A conduit run along Texas Street can pass beneath pavement and driveways without an open cut across the road.
  • Rail crossing: Work beneath the Union Pacific track needs the railroad agreement to set crossing conditions for the proposed line.
  • Street replacement: A sewer or water replacement along Main Street can be routed beneath the surface after existing lines are exposed.
  • Lake approach: A route toward Ray Roberts Lake needs planning for the proposed crossing and review of possible federal jurisdiction.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore near Ray Roberts Parkway in Tioga?

A map pin matters near Ray Roberts Parkway because the route’s exact position determines which street, utility or other crossing a bore must pass. Send the address or pin, what is going in the ground, pipe or conduit size and footage. A sketch or plans help us see the proposed path beneath Tioga streets and identify questions before we scope the job.

The 176 road miles from Yukon matter for mobilization to Tioga, while Crockett clay and possible weathered bedrock affect the drilling plan. Price also reflects bore length, pipe size, utilities to expose, pavement, pits, excavator time and sand backfill. A route under US 377 or Union Pacific track adds crossing details to assess. Creek or drainage crossings, high profile work and emergency timing can also change the job scope.

Questions people ask about boring in Tioga

Does Trinity take directional boring work in Tioga and Grayson County?

Yes. We take directional boring work in Tioga, with our own crews and partner contractor satellite yards that Trinity has vetted. We guide Tioga customers from first call through bore log, keeping the process consistent regardless of which crew performs the work. For a route near Crockett soil or US 377, we plan around the specific ground and crossing.

What does a bore beneath the Union Pacific track in Tioga need?

Union Pacific owns the track in Tioga, and a bore beneath it needs a crossing agreement from the railroad. That agreement sets requirements such as casing, depth and flagging. The mapped track totals 1.13 miles inside town, with 4 street and rail crossings, so the exact proposed crossing matters.

Who operates Tioga’s public water system, and what is its water source?

The City of Tioga owns the public water system, which uses groundwater wells. Public records list 649 service connections and 938 people served, figures we use when planning underground work in Tioga. We account for the system when planning a bore near a proposed water route, and expose marked utilities before drilling close to them.

Which electric provider should I check for a Tioga job in Grayson County?

Oncor Electric Delivery Company, Texas-New Mexico Power and four electric cooperatives report service in Grayson County. Those records do not identify the provider at every Tioga address. Confirm the line owner before setting electric conduit specifications, especially for a proposed route near Main Street or US 377.

Who controls Texas Street in Tioga, and does a bore have to cut it?

Since Tioga is incorporated, we coordinate street work with the city when planning directional boring routes. A bore beneath Texas Street can avoid an open cut through the pavement when the route and site conditions allow. We locate and expose marked utilities along the planned path before drilling near them.

Does Tioga housing near Main Street mean old lines need replacement bores?

Not necessarily. American Community Survey 2019 to 2023 estimates give Tioga a median housing year of 2003, but the age of a home does not establish the age of its buried lines. A replacement bore near Main Street needs the existing route checked and marked utilities exposed before drilling.

What bore sizes and lengths can Trinity handle near Lamar Street in Tioga?

For a job near Lamar Street, we handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The suitable size and length depend on what the route needs to cross and the ground mapped beneath the proposed path.

How early should I request a locate for a Tioga bore near Ray Roberts Parkway?

Count back at least two working days from the planned start near Ray Roberts Parkway; Saturdays, Sundays and legal holidays do not count. Texas law sets the minimum at 48 hours, and the notice cannot be earlier than 14 days before excavation. If the start slips more than 14 days past the notice, request a new ticket. Before work continues in Tioga, we refresh worn or moved marks through Texas811 to help keep underground routes properly identified.

What affects the price of directional boring beneath US 377 in Tioga?

The route and scope determine the price. Near US 377, factors include bore length, pipe or conduit size, Crockett clay, pavement, and how many utilities need exposure. Union Pacific crossings, pits, excavator time, sand backfill, emergency timing and mobilization from Yukon can also affect the job.

Where the Tioga facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Tioga

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Tioga, Texas

Type the address of your job in Tioga. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Tioga

Same county: Sherman · Denison · Van Alstyne · Whitesboro · Howe · Pottsboro · Preston · Whitewright · Bells · Sherwood Shores · Southmayd · Tom Bean. All counties: Texas county list.