Shadybrook Texas Directional Boring: Betis Soil, FM 346 and Stone Chimney Creek

Quick Answer: FM 346 is the highway through Shadybrook, and Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work for routes beneath it. Woodhue Drive is one of the area’s longest streets, and our Yukon, Oklahoma main office is 330 road miles away, so distance is part of mobilization planning. USDA maps show loamy fine sand across 39 percent of the surface, while sandy clay loam is common around 40 inches; that change can affect hole support and reaming.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Shadybrook bores at a glance

  • Unincorporated community in Cherokee County, Texas. Population 2,400 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 330 miles, about 6.5 hours of driving.
  • Ground: Betis soil is mapped on 20 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 5 percent of the area.
  • Highways inside the boundary: FM 346. State permit office: TxDOT Tyler District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Stone Chimney Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Does Trinity do directional boring near Shadybrook’s Woodhue Drive?

Shadybrook is an unincorporated community in Cherokee County; the Census Bureau counted 2,400 residents in the 2020 Census. Along Woodhue Drive and Caroline Lane, our crews can bore water, sewer, gas, electric conduit and fiber routes without opening the full street, with the line size and route setting the equipment.

Our main office is in Yukon, Oklahoma, and Shadybrook work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, and we have done directional boring since 1982. For a route along San Saba Street or toward Stone Chimney Creek, our equipment range runs from 3/4 inch service lines to 48 inch casing, with bore lengths from 10 feet to 5,000 feet.

Horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
Our horizontal directional drill set up in an open field with the support trucks and the vacuum excavation truck. Photos on this page are from our jobs in Oklahoma and Texas.

What is Shadybrook ground like around Betis soil?

The USDA soil survey maps Betis as 20 percent of the soil series in Shadybrook. Betis loamy fine sand appears on 11 percent of the mapped area at 0 to 3 percent slopes and 9 percent at 3 to 8 percent slopes. Across the surface, loamy fine sand covers 39 percent and fine sandy loam covers 38 percent. At about 40 inches, sandy clay loam is mapped under 35 percent of the area, while clay is mapped under 18 percent. These are mapped soil patterns, not test borings, so a route can meet changing ground along one bore.

USDA soil survey, inside the Shadybrook mapped community boundaryWhat is mapped
Soil series mappedBetis 20 percent, Lilbert 15 percent, Nacogdoches 11 percent, Bowie 11 percent and Elrose 4 percent
Texture at the surfaceloamy fine sand 39 percent, fine sandy loam 38 percent and clay loam 3 percent
Texture about 40 inches downsandy clay loam 35 percent, loamy fine sand 20 percent and clay 18 percent
Engineering class about 40 inches downclayey sand (SC) 27 percent, silty sand (SM) 20 percent and fat clay (CH) 17 percent
Average clay content about 40 inches down26 percent
Bedrock mapped within 60 inches5 percent of the area (0 percent hard rock, 5 percent weathered rock)
Seasonal water table within 60 inches20 percent of the area
Flood prone soils3 percent of the area
High corrosion risk for uncoated steel33 percent of the area

The USDA soil survey maps bedrock within 60 inches in 5 percent of Shadybrook, with typical depth listed as 35 inches; the mapped geology includes Quartz Sand Decomposition Residuum of Cenozoic age and Sparta Sand of Eocene age. A bore may move from sand into cohesive ground, so the head and reaming plan need to suit the changing material. Seasonal water tables occur within 60 inches across 20 percent, and flood prone soils cover 3 percent, making pit drainage and creek depth worth planning. High steel corrosion risk is mapped under 33 percent, so the line owner should choose any steel protection.

How do we drill Shadybrook’s sandy clay loam?

Shadybrook’s mapped sandy clay loam at about 40 inches calls for a plan that manages both hole support and sticky cuttings. We adjust fluid, reaming and pullback to the ground along the specific route.

  1. Where Shadybrook’s sandy clay loam is expected around 40 inches, we adjust fluid and reaming stages to manage sticky cuttings and keep the hole stable.
  2. Loamy fine sand covers 39 percent of the mapped surface, so we use drilling fluid to help hold loose ground open and have the pipe ready before the final ream.
  3. Before drilling near Woodhue Drive, we hydrovac pothole each marked utility on the planned path; paint locates position, while potholing establishes depth.
  4. At Stone Chimney Creek, we plan the bore beneath the channel and monitor the drill head from the surface, recording depth and pitch as it advances.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

Which roads and creeks can a Shadybrook bore cross near FM 346?

FM 346 runs through Shadybrook, with 6.7 mapped roadway miles inside the community boundary; a route in its right of way involves TxDOT review. Texas State Highway 155 is 1.3 miles outside the boundary. The longer local streets include Woodhue Drive at 2.15 miles, San Saba Street at 2.05 miles and Caroline Lane at 2.04 miles. A bore under any of them can pass below the pavement rather than cut across the traveled surface, subject to the route, utility locations and required approvals.

CrossingTypeMapped extentWho has a say
FM 346State highway6.7 roadway miles insideState highway office
Texas State Highway 155Highway nearby1.3 miles outsideState highway office
Stone Chimney CreekStream2.51 channel miles insideChecked for Corps of Engineers jurisdiction
County Line CreekStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Lake PalestineLake or pond15,279 acres, insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Shadybrook or within 1 mile outside the community boundary, so there is no mapped track crossing to plan around. Stone Chimney Creek runs 2.51 channel miles inside the area, and two street crossings of named streams are mapped. A creek route needs depth planning below the channel, and its crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. Lake Palestine is also inside the community boundary, covering 15,279 acres, so a route near the lake needs site specific review.

Who approves a Shadybrook bore in Cherokee County?

Shadybrook has no city government, so Caroline Lane and other local streets are not under a city permit office. County or state authority depends on the road and right of way involved. FM 346 is a state highway, so TxDOT’s Tyler District reviews a utility permit application for work in its right of way. The utility owner files through TxDOT’s RULIS system; we prepare the bore plan and profile and work under the permit issued to that owner. TxDOT requires boring beneath existing highway pavement, and a Stone Chimney Creek crossing is checked for federal waterway jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already in the ground in Shadybrook, Cherokee County?

EPA drinking water records do not tie water systems to towns, so the provider for a Woodhue Drive address has to be confirmed with the county or local water district before planning a bore. Do not assume the same provider serves every property. Oncor Electric Delivery Company, Cherokee County Electric Cooperative Association and Houston County Electric Cooperative report electric service in the county, but the line owner for a specific FM 346 conduit route must be confirmed before the bore.

Line ownerWhat it isSourceSize
Oncor Electric Delivery Company, Cherokee County Electric Cooperative Association and Houston County Electric CooperativeElectric utilities reporting service in Cherokee CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

American Community Survey 2019 to 2023 five year estimates put Shadybrook’s median housing year at 2000; 7 percent of homes were built before 1960, and 52 percent were built in 2000 or later. A replacement line near San Saba Street may follow older utilities, while a Caroline Lane project may be a new service. Before the drill approaches either route, we hydrovac pothole each marked utility on the bore path; surface paint shows position, not depth.

Trinity Boring Solutions technician hydrovac daylighting along a commercial curbline during utility locating in Oklahoma City
Hydrovac daylighting along a commercial curb line in Oklahoma City to find the utilities before a bore.

How far is Shadybrook from Coffee City and our Yukon yard?

Shadybrook is in Cherokee County beside Lake Palestine, at an elevation of 384 feet across 7.72 square miles, and its ZIP code is 75757. Coffee City is 2.7 miles west, Berryville is 3.1 miles southwest, and Emerald Bay is 3.1 miles north. Bullard, the nearest larger city, is 6.7 miles east; Rusk, the county seat, is 27.5 miles southeast. The Yukon yard is 330 road miles away, or a 6.5 hour drive, so that distance factors into mobilization for a Woodhue Drive project.

Places near Shadybrook

What would we bore near Shadybrook’s Caroline Lane?

  • Highway crossing: A bore beneath FM 346 stays below the pavement, with the route and right of way reviewed for TxDOT requirements.
  • Water service: A route from a property near Woodhue Drive can connect with a confirmed provider without cutting the full street.
  • Fiber conduit: A Caroline Lane conduit bore can avoid opening the street, with marked utilities exposed before drilling near them.
  • Creek crossing: A route beneath Stone Chimney Creek needs channel depth planning and a check for federal waterway jurisdiction.
  • Lake side line: Work near Lake Palestine needs an address and route plan to account for access and nearby crossings.
  • State road approach: A route near Texas State Highway 155 needs its location checked because the highway is 1.3 miles outside the mapped community boundary.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a Shadybrook bore near Stone Chimney Creek?

Start with an address or map pin; an exact point near Stone Chimney Creek or FM 346 helps us identify the crossing and access. Include what is going in the ground, the pipe or conduit size and footage. A sketch or plans can show pits, other utilities and the route near Woodhue Drive.

The job scope sets the price. Ground conditions matter: Betis loamy fine sand and sandy clay loam can call for different fluid and reaming plans. Crossings such as FM 346, Stone Chimney Creek, marked utilities, pavement and concrete affect the work. Pit size, excavator time and sand backfill also count. Mobilization from the Yukon yard is part of the logistics for Shadybrook, 330 road miles away, and emergency or high profile work can change the scope.

Questions people ask about boring in Shadybrook

Does Trinity take directional boring jobs in Shadybrook, Cherokee County, and who staffs them?

Yes. Trinity takes directional boring work in Shadybrook and serves Cherokee County from its Oklahoma and Texas operation. Your point of contact stays with the job from the first call through the bore log, while the work may be handled by our own crews or vetted partner contractors based at satellite yards.

Who owns electric lines in Shadybrook, Cherokee County, and who confirms conduit specs?

The specific line owner must be confirmed for the address and route. Oncor Electric Delivery Company, Cherokee County Electric Cooperative Association and Houston County Electric Cooperative report service in the county, but that does not establish which serves a property on FM 346. Confirm conduit specifications with the owner of the line being installed.

Who is responsible for Caroline Lane in Shadybrook, and does a bore require cutting it?

Shadybrook is unincorporated and has no city government, so Caroline Lane is not managed by a city street department. The responsible authority depends on the road and right of way. Directional boring can pass beneath pavement rather than cut the street, with the route subject to utility locates and any applicable approval.

How old are homes and buried lines near Shadybrook’s San Saba Street?

The American Community Survey 2019 to 2023 five year estimates put the median housing year at 2000, with 7 percent of homes built before 1960. Those figures do not date buried lines. A replacement bore near San Saba Street should be planned around the existing route, with marked utilities exposed before drilling nearby.

Can groundwater or flood prone ground affect bore pits near Shadybrook’s Stone Chimney Creek?

It can. The USDA soil survey maps seasonal water tables within 60 inches across 20 percent of Shadybrook and flood prone soils across 3 percent. Near Stone Chimney Creek, pit placement and drainage need attention, and the bore route should pass below the channel with the crossing checked for federal waterway jurisdiction.

Does Shadybrook’s Betis soil create steel corrosion concerns, and what pipe is used?

The soil survey maps high steel corrosion risk under 33 percent of Shadybrook, which can matter for uncoated steel casing or tracer wire. HDPE is not subject to that steel corrosion concern. The line owner selects any coating for steel components and determines the pipe material for a route near Betis soil.

How far is Shadybrook from Trinity’s Yukon office, and does Bullard change the job?

Shadybrook is 330 road miles from our Yukon, Oklahoma main office, a 6.5 hour drive. Bullard is 6.7 miles east of Shadybrook, but the work location and required equipment determine the job plan. The Yukon distance can affect mobilization for a bore near FM 346 or another local route.

How much Texas811 notice is needed for a Shadybrook bore near Woodhue Drive?

Count back at least 48 hours, excluding Saturdays, Sundays and legal holidays, from the planned excavation start; the request cannot be made earlier than 14 days before work. A Woodhue Drive ticket has a 20 day life, but a start slipping more than 14 days past the original notice needs a new request. Refresh worn or moved marks through Texas811 before work continues.

What affects the cost of directional boring in Shadybrook near FM 346?

The job’s length, pipe or conduit size, Betis soil conditions, utility crossings, pavement, pits and access all affect the scope. A route beneath FM 346 may involve highway permit planning, while a Stone Chimney Creek crossing adds creek considerations. Mobilization from the Yukon yard also matters for work 330 road miles away.

Where the Shadybrook facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Shadybrook

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Shadybrook, Texas

Type the address of your job in Shadybrook. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Shadybrook

Same county: Jacksonville · Rusk · Alto · New Summerfield · Wells · Gallatin · Reklaw. All counties: Texas county list.