Lindale Texas Directional Boring: Wolfpen Sand, Prairie Creek and Interstate 20
Quick Answer: The top five feet around Lindale are mapped mostly as loamy fine sand and fine sandy loam, with sandy clay loam common at about 40 inches; we take directional boring, also called horizontal directional drilling (HDD), beneath roads and Prairie Creek. Lindale is 307 road miles from our Yukon, Oklahoma yard, a factor on work near Main Street. Wolfpen soil is common here, and sandy ground can cave behind the drill head. Staged reaming and drilling fluid help keep the hole open for a line under Wood Springs Road.
Lindale bores at a glance
- Incorporated city in Smith County, Texas. Population 7,227 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 307 miles, about 6 hours of driving.
- Ground: Wolfpen soil is mapped on 34 percent of the area, with sandy clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 5 percent of the area.
- Highways inside the boundary: Interstate 20, US 69, FM 849, FM 16 and FM 2710. State permit office: TxDOT Tyler District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Prairie Creek, Davis Branch, Long Brake Creek and Mill Creek.
- Public water: City of Lindale, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Does anyone handle directional boring on Lindale Main Street?
Lindale’s top five feet are mapped mainly as loamy fine sand and fine sandy loam, and Trinity Boring Solutions handles directional boring beneath Main Street. The Census Bureau Vintage 2024 estimate puts Smith County city Lindale at 7,227 people. Our crews install water, sewer, gas, electric conduit and fiber where routes follow streets such as Main Street or Wood Springs Road, or need to pass beneath them.
Our main office is in Yukon, Oklahoma, and Lindale work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. The family business began in 1965, and directional boring has been part of our work since 1982. Four decades of boring experience matters on Lindale routes where Wolfpen loamy fine sand can loosen around a new bore.

What kind of ground does Lindale Wolfpen soil map show?
The USDA soil survey maps Wolfpen as Lindale’s leading soil series, covering 34 percent of the city, with Oakwood at 22 percent and Pickton at 21 percent. Wolfpen loamy fine sand, 1 to 5 percent slopes, covers 25 percent of the mapped area. At about 40 inches, sandy clay loam is mapped under 66 percent of Lindale, while loamy fine sand accounts for 21 percent. Near the surface, loamy fine sand covers 56 percent and fine sandy loam 32 percent. These are mapped soil patterns, not test borings; the sandy surface can need support to keep a bore open.
| USDA soil survey, inside the Lindale city limits | What is mapped |
|---|---|
| Soil series mapped | Wolfpen 34 percent, Oakwood 22 percent, Pickton 21 percent, Cuthbert 7 percent and Mattex 5 percent |
| Texture at the surface | loamy fine sand 56 percent, fine sandy loam 32 percent and loam 5 percent |
| Texture about 40 inches down | sandy clay loam 66 percent, loamy fine sand 21 percent and clay 6 percent |
| Engineering class about 40 inches down | lean clay (CL) 39 percent, clayey sand (SC) 35 percent and silty clayey sand (SC SM) 21 percent |
| Average clay content about 40 inches down | 22 percent |
| Bedrock mapped within 60 inches | 5 percent of the area (0 percent hard rock, 5 percent weathered rock) |
| Seasonal water table within 60 inches | 52 percent of the area |
| Flood prone soils | 5 percent of the area |
| High corrosion risk for uncoated steel | 33 percent of the area |
The soil survey maps weathered bedrock within 60 inches across 5 percent of Lindale, with hard bedrock not mapped at that depth. A typical bedrock depth is 44 inches, so the bore plan still needs site checks. Seasonal water tables fall within 60 inches across 52 percent of the city, while flood prone soils cover 5 percent. High steel corrosion risk is mapped across 33 percent. The geologic map lists Quartz Sand Decomposition Residuum of Cenozoic age and Sparta Sand of Bartonian age, including sandstone, siltstone and claystone. Wet pits may need pumping, and the line owner should consider steel casing and tracer wire materials.
How is a bore run through Lindale sandy clay loam?
Lindale’s sandy clay loam at about 40 inches sits beneath sandy surface soils, so we plan for both a supported hole and firm steering. Prairie Creek and street crossings shape the route.
- Wolfpen loamy fine sand can fall into the bore behind the bit, so we use drilling fluid to support the hole and ream in stages before installing pipe.
- At about 40 inches, Lindale is mapped mainly as sandy clay loam; we adjust fluid and steering to the ground found along the route.
- Seasonal water tables are mapped within 60 inches across 52 percent of Lindale, so we keep pits small and pump them if groundwater enters.
- At Prairie Creek, we plan the bore beneath the channel, check possible Corps jurisdiction and track the drill head from the surface while logging depth and pitch.

What is in the way of a new Lindale line near Prairie Creek?
Lindale routes may meet Interstate 20, US 69, FM 849, FM 16 or FM 2710 within city limits; Texas State Highway 110 is 0.8 miles outside them. A bore beneath Interstate 20 or US 69 needs a profile that accounts for the highway crossing and its pavement. Main Street runs 3.95 miles in the city, Wood Springs Road 2.11 miles and South Street 1.41 miles. Hubbard Street adds another 1.34 miles. Their length and intersections can shape a practical bore route without cutting the roadway.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 20 | Interstate | 7.4 roadway miles inside | State highway office |
| US 69 | US highway | 5.3 roadway miles inside | State highway office |
| FM 849 | State highway | 1.7 roadway miles inside | State highway office |
| FM 16 | State highway | 1.5 roadway miles inside | State highway office |
| FM 2710 | State highway | 0.1 roadway miles inside | State highway office |
| Texas State Highway 110 | Highway nearby | 0.8 miles outside | State highway office |
| Prairie Creek | Stream | 2.38 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Davis Branch | Stream | 0.7 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Long Brake Creek | Stream | 0.7 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Mill Creek | Stream | 0.4 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Stevenson Branch | Stream | 0.39 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Cooks Creek | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| Hubbard Branch | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| Luckeible Branch | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Lindale or within 1 mile outside the limits, so the mapped route has no track crossing to plan around. Prairie Creek runs 2.38 channel miles within the city, and Davis Branch and Long Brake Creek each add 0.7 miles. Public mapping shows 10 street crossings of named streams. Hide-A-Way Lake, Hide-A-Way Lake No 2 and Tomlin Lake are among the lakes within 1 mile outside the city. A creek or lake route is checked for possible U.S. Army Corps of Engineers jurisdiction during planning.
Who has to sign off on a Lindale Interstate 20 bore?
For a Lindale highway crossing, required cover sets the bore depth: electric and communication lines need 60 inches below the lowest crossed grade, water lines need 60 inches, and pressurized sewer lines need 60 inches. Along the right of way, the listed cover is 48 inches for electric and communication and 36 inches for water. TxDOT rules call for boring or tunneling beneath existing highway pavement, with a casing and a bore extending under all travel lanes on rural highways. For Interstate 20, US 69 or a farm to market road, the utility owner files in TxDOT’s RULIS system for review by the TxDOT Tyler District. We prepare the bore plan and profile for that filing. Lindale city streets belong to the city, while a creek crossing is checked for Corps jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground in Lindale and Smith County?
The City of Lindale public water system uses groundwater wells and reports 3,242 service connections serving 6,313 people. That system is a useful starting point when planning a water bore near Wood Springs Road, but each address and line route still needs confirmation. Utilities reporting electric service in Smith County include Oncor Electric Delivery Company, Southwestern Electric Power, Cherokee County Electric Cooperative Association, Upshur Rural Electric Cooperative and Wood County Electric Cooperative. We confirm the line owner for a specific Lindale route before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Lindale | Public water system | Groundwater wells | 3,242 connections, 6,313 people served |
| Oncor Electric Delivery Company, Southwestern Electric Power, Cherokee County Electric Cooperative Association, Upshur Rural Electric Cooperative and Wood County Electric Cooperative | Electric utilities reporting service in Smith County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Lindale’s median housing year at 1994; 11 percent of homes were built before 1960, 43 percent from 1960 to 1999 and 46 percent in 2000 or later. That mix can mean either a replacement route for an older line or a service for newer construction along Main Street. Before drilling near marked utilities, we use hydrovac potholing to expose them: paint shows a line’s position, not its depth.

How far is Lindale from Hideaway and our Yukon yard?
Lindale is in Smith County, 13.6 miles northwest of county seat Tyler, and its elevation is 542 feet. The incorporated city covers 6.18 square miles and includes ZIP codes 75771 and 75706. Hideaway is 2.9 miles west; Mineola is 11.8 miles north; Winona is 13.4 miles east; Chandler is 13.5 miles south; and Van is 13.6 miles west. Our Yukon, Oklahoma yard is 307 road miles away, about a 6.0 hour drive. That distance is part of mobilization planning for work near Prairie Creek or Interstate 20.
Places near Lindale
- Directional boring in Hideaway: 2.9 miles west
- Directional boring in Mineola: 11.8 miles north
- Directional boring in Winona: 13.4 miles east
- Directional boring in Chandler: 13.5 miles south
- Directional boring in Van: 13.6 miles west
- Directional boring in Tyler: 13.6 miles southeast
What would we bore near Lindale Wood Springs Road?
- Highway crossing: A bore under Interstate 20 keeps the line below the paved travel lanes rather than cutting across the highway surface.
- Water service: A new or replacement connection near the City of Lindale groundwater system can run beneath Main Street without an open cut.
- Fiber route: A conduit along Wood Springs Road can pass beneath pavement and marked utilities after the route and line depths are checked.
- Creek crossing: A Prairie Creek bore is planned below the channel, with pits on the banks and a review for possible Corps jurisdiction.
- Electric conduit: Near Hubbard Street, the route begins with confirmation of the line owner and exposure of marked utilities before drilling close by.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a Lindale bore near Hubbard Street?
A map pin matters on Hubbard Street because a small shift can change which utilities, pavement or drainage features a bore meets. Send the address or pin, what will go in the ground, pipe or conduit size and footage. A sketch or plans help us see how the proposed route relates to Hubbard Street or Prairie Creek.
The job scope sets the price, with ground, crossings and logistics all in the plan. Wolfpen loamy fine sand can require staged reaming and fluid to hold the hole open. Crossings of Interstate 20, streets or Prairie Creek add route and exposure work. Pipe size, footage, pavement, utility locations, pits, excavator time and sand backfill also matter. Lindale’s 307 road miles from Yukon affect mobilization, and high profile or emergency work can add planning demands.
Questions people ask about boring in Lindale
Does Trinity Boring Solutions take directional boring work in Lindale, Smith County?
Yes. We take directional boring work in Lindale and across Texas, with our main office in Yukon, Oklahoma. Our own crews and partner contractor crews from vetted satellite yards handle the work, while you deal with Trinity through the bore log. Routes near Main Street or Prairie Creek are planned around their local crossings.
How old are Lindale lines near Wood Springs Road, and can replacement bores avoid digging up the street?
The American Community Survey 2019 to 2023 estimates give Lindale a median housing year of 1994, with 11 percent of homes built before 1960. A replacement bore near Wood Springs Road may avoid an open cut, but the route still needs utility locating and potholing because the survey does not date individual buried lines.
Can groundwater or flooding affect bore pits near Lindale Prairie Creek?
It can. Seasonal water tables are mapped within 60 inches across 52 percent of Lindale, and flood prone soils cover 5 percent. Near Prairie Creek, we plan pits with water entry in mind and route the bore beneath the channel; potential Corps jurisdiction is checked during planning.
Does Lindale Wolfpen soil corrode steel, and what pipe can go in the bore?
The USDA soil survey maps high steel corrosion risk across 33 percent of Lindale. The line owner should consider casing and tracer wire materials for a route through Wolfpen soil. HDPE is not subject to that soil corrosion concern, and the pipe choice depends on the line owner’s requirements.
What ground will a Lindale bore pass through in Wolfpen soil?
Wolfpen is Lindale’s most common mapped soil series at 34 percent. At about 40 inches, the USDA soil survey maps sandy clay loam under 66 percent of the city and loamy fine sand under 21 percent. These are mapped patterns, not test borings, so the exact route may meet different conditions.
Is there rock near the surface on a Lindale bore route?
The soil survey maps weathered bedrock within 60 inches in 5 percent of Lindale, and hard bedrock is not mapped within that depth. A typical bedrock depth is 44 inches. The mapped geology includes Sparta Sand with sandstone and siltstone, so site conditions still guide the bit choice.
How far is Lindale from the Yukon office, and does Tyler affect the job?
Lindale is 307 road miles and about a 6.0 hour drive from our Yukon, Oklahoma yard. Tyler is 13.6 miles southeast and is the county seat. The distance from Yukon can affect mobilization for a bore near Tyler facing routes such as Interstate 20 or Prairie Creek.
How much 811 notice does a Lindale bore on Main Street need?
Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If a Main Street start moves more than 14 days beyond the original notice, make a new request. Worn or moved marks must be refreshed through Texas811 before work continues.
What affects the price of a directional bore in Lindale near Interstate 20?
The job’s length, pipe size, soil, utility crossings, pavement, pits and backfill all affect the price. An Interstate 20 crossing has highway requirements to plan around, while Wolfpen loamy fine sand can call for staged reaming. Mobilization also reflects Lindale’s 307 road miles from Yukon, and emergency work can add planning needs.
Where the Lindale facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Lindale
- U.S. Census Bureau, TIGER/Line 2024: Lindale boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Lindale
- U.S. Census Bureau, American Community Survey 2019 to 2023: Lindale housing units and year built
- Macrostrat geologic map compilation: map units under Lindale
- U.S. EPA Safe Drinking Water Information System: public water systems serving Lindale
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Smith County
- U.S. Geological Survey, Elevation Point Query Service: Lindale elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Lindale
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Lindale
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Lindale, Texas
Type the address of your job in Lindale. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Lindale
Same county: Whitehouse · Bullard · Troup · Emerald Bay · Arp · Noonday · New Chapel Hill · Overton. All counties: Texas county list.
