trinityboringsolutions.com

Peaster Texas Directional Boring: Aledo Soil, FM 920 and Belknap Branch

Quick Answer: A line can pass beneath FM 920 without cutting the pavement when the route and permit allow it; Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), in Peaster, Texas. The Yukon, Oklahoma main office is 226 road miles from Peaster, and Zion Hill Road is one local route to plan around. Aledo soil and clay mapped below the surface can make the hole sticky, so the drilling fluid and reaming plan matter. Belknap Branch is another crossing to assess before setting the bore path.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Peaster bores at a glance

  • Incorporated city in Parker County, Texas. Population 634 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 226 miles, about 4.9 hours of driving.
  • Ground: Aledo soil is mapped on 28 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 61 percent of the area.
  • Highways inside the boundary: FM 920, FM 2421 and FM 1885. State permit office: TxDOT Fort Worth District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Belknap Branch, Willow Creek, Johnson Branch and Peaster Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near Belknap Branch in Peaster?

Trinity Boring Solutions takes directional boring work in Peaster, Parker County, where the Census Bureau Vintage 2024 estimate puts the population at 634. Can you get a line under a road or creek without cutting across it? We plan routes for water, sewer, gas, electric conduit and fiber, including runs beneath FM 920 or near Belknap Branch.

Our main office is in Yukon, Oklahoma, and Peaster work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore runs roughly 4,100 feet beneath the Arkansas River in Tulsa; a typical Peaster job beside that reach is a shorter service or conduit crossing near FM 920, Zion Hill Road or a local branch.

Horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
Our horizontal directional drill set up in an open field with the support trucks and the vacuum excavation truck. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show about Peaster ground near Aledo?

Peaster’s USDA soil survey maps Aledo soil across 28 percent of the town, with Windthorst at 22 percent and Duffau at 17 percent. Fine sandy loam is the leading surface texture at 38 percent, while the survey maps bedrock at 40 inches across 33 percent of the area and sandy clay across 21 percent at that depth. The mapped clay content averages 31 percent there, and heavy clay is mapped in 28 percent. These are survey patterns, not test borings; clay can cling to a reamer and grip a pipe.

USDA soil survey, inside the Peaster city limitsWhat is mapped
Soil series mappedAledo 28 percent, Windthorst 22 percent, Duffau 17 percent, Venus 9 percent and Denton 6 percent
Texture at the surfacefine sandy loam 38 percent, gravelly clay loam 28 percent and clay loam 15 percent
Texture about 40 inches downbedrock 33 percent, sandy clay 21 percent and sandy clay loam 20 percent
Engineering class about 40 inches downlean clay (CL) 58 percent and fat clay (CH) 7 percent
Average clay content about 40 inches down31 percent
Bedrock mapped within 60 inches61 percent of the area (39 percent hard rock, 22 percent weathered rock)
Seasonal water table within 60 inches1 percent of the area
Flood prone soils2 percent of the area
High corrosion risk for uncoated steel5 percent of the area

The USDA soil survey maps bedrock within 60 inches across 61 percent of Peaster, including hard bedrock in 39 percent and weathered bedrock in 22 percent; typical mapped depth is 31 inches. A seasonal water table within 60 inches is mapped in 1 percent, flood prone soils in 2 percent, and high steel corrosion risk in 5 percent. The geologic map names Paluxy Sand, of Aptian age, and describes fine sand with clay. Those patterns call for checking actual ground along the bore, watching for rock transitions, and considering casing or tracer wire materials with the line owner.

How do we drill Peaster ground where bedrock is mapped?

For a bore near Peaster’s mapped bedrock, we match the tooling and fluid plan to the ground found along the route, not just the townwide soil pattern. Clay mapped at 40 inches can call for staged reaming.

  1. Where Peaster’s mapped clay is present, we adjust drilling fluid and ream in stages so sticky cuttings do not load the reamer or bind the pipe.
  2. With fine sandy loam mapped at the surface, we keep the pipe ready as the hole is opened and use fluid suited to ground that may not hold its shape.
  3. The survey maps bedrock within 60 inches in much of Peaster; we check depth and pitch closely where a bore meets rock or changes from soil to rock.
  4. Near Belknap Branch, we plan the bore depth against the channel and review the crossing before work, while keeping the creek bank uncut.
Vermeer D24x40 S3 Navigator and water truck at the entry of a 385 foot sandstone rock bore above the wetland in Guthrie, Oklahoma
Our Vermeer D24x40 and water truck at the entry of a 385 foot sandstone rock bore in Guthrie, Oklahoma.

What is in the way of a new line near FM 920 in Peaster?

FM 920, FM 2421 and FM 1885 run within Peaster, so a route may need to cross a state highway or stay within its right of way. The town’s longest named streets are Zion Hill Road at 1.46 miles, Lee Street at 0.74 miles and Mark Layne Road at 0.71 miles. Precinct Road adds another local route. Boring can keep pavement and driveways intact, but a highway crossing needs an approved plan and the applicable cover depth before drilling begins.

CrossingTypeMapped extentWho has a say
FM 920State highway3.6 roadway miles insideState highway office
FM 2421State highway1.5 roadway miles insideState highway office
FM 1885State highway1.2 roadway miles insideState highway office
Belknap BranchStream0.57 channel miles insideChecked for Corps of Engineers jurisdiction
Willow CreekStream0.55 channel miles insideChecked for Corps of Engineers jurisdiction
Johnson BranchStream0.34 channel miles insideChecked for Corps of Engineers jurisdiction
Peaster CreekStream0.32 channel miles insideChecked for Corps of Engineers jurisdiction
Graham BranchStream0.24 channel miles insideChecked for Corps of Engineers jurisdiction
Town CreekStream nearby0.2 miles outsideChecked for Corps of Engineers jurisdiction
Reservoir No 24Lake or pond27 acres, nearbyChecked for Corps of Engineers jurisdiction
Reservoir No 25ALake or pond13 acres, nearbyChecked for Corps of Engineers jurisdiction
Reservoir No 25Lake or pond12 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Peaster or within 1 mile outside its limits, so a mapped rail crossing is not part of the town’s crossing picture. Belknap Branch, Willow Creek, Johnson Branch and Peaster Creek are among the streams within town; public mapping shows 8 street crossings of named streams. Reservoir No 24, Reservoir No 25A and Reservoir No 25 are within 1 mile but outside town limits. A creek or lake route needs a crossing review during planning.

Who has to sign off on a Peaster bore in Parker County?

For a bore beneath FM 920, FM 2421 or FM 1885, the utility owner applies for the TxDOT right of way permit through RULIS, and TxDOT’s Fort Worth District reviews it. Electric and communication lines crossing a state highway need 60 inches of cover below the lowest point of the crossed grade; water lines need the same crossing cover, and pressurized sewer lines also need 60 inches. For FM 2421 pavement crossings, we plan boring or tunneling beneath existing highway pavement as TxDOT requires. Peaster is incorporated, so city streets such as Lee Street belong to the city. A crossing of Belknap Branch is checked for federal waterway jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities may have lines in the ground in Parker County near Peaster?

The water provider for a specific Peaster address has to be confirmed with the city, Parker County or the local water district before a bore is planned; available records do not identify a provider for each address. Oncor Electric Delivery Company, Weatherford Municipal Utility System, Tri-County Electric Cooperative and Wise Electric Cooperative report electric service in Parker County. That countywide list does not identify the line owner at a particular Zion Hill Road property, so we confirm ownership before planning an electric conduit bore.

Line ownerWhat it isSourceSize
Oncor Electric Delivery Company, Weatherford Municipal Utility System, Tri-County Electric Cooperative and Wise Electric CooperativeElectric utilities reporting service in Parker CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Peaster’s median housing year at 1990: 12 percent of homes were built before 1960, 39 percent from 1960 to 1999 and 49 percent in 2000 or later. A job near Lee Street might replace an older service or add a newer one, and the existing lines can differ. We hydrovac expose each marked utility on the bore route before drilling near it, since locate marks show position, not depth.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

How far is Peaster from Weatherford and our Yukon office?

Peaster is in Parker County, at an elevation of 1,228 feet and with a land area of 2.27 square miles. Garner is 6.8 miles west; Carter is 8.9 miles northeast; Cool and Weatherford are each 9.0 miles away, southwest and southeast respectively. Weatherford is also the county seat and nearest larger city listed. From the Yukon, Oklahoma yard, Peaster is 226 road miles and a 4.9 hour drive, which is part of planning crew mobilization for a Zion Hill Road or FM 920 job.

Places near Peaster

What kinds of bores come up near Lee Street in Peaster?

  • Highway crossing: A route beneath FM 920 is bored under the pavement, with the utility owner’s TxDOT permit and required cover setting the plan.
  • Water service: A new service near Lee Street can be routed beneath pavement or a driveway after the address provider and marked lines are confirmed.
  • Fiber conduit: A conduit run along Zion Hill Road can avoid open cuts across pavement, with each marked utility exposed before the drill approaches.
  • Creek crossing: A line near Belknap Branch can be planned below the channel, with waterway jurisdiction checked during route planning.
  • Drainage crossing: Willow Creek or Johnson Branch may affect the route, so the bore path and depth need review before choosing entry and exit pits.
  • Acreage service: Near the edge of Peaster, a longer run toward Weatherford can require more footage and mobilization planning from Yukon.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Peaster quote near Zion Hill Road?

A map pin at the proposed Zion Hill Road crossing helps us see the exact route and nearby features such as Belknap Branch. Include what will go in the ground, the pipe or conduit size and the footage; a sketch or plans help us check the path and access before we prepare a quote.

The job details shape the price: ground conditions near Peaster’s Aledo soil, pipe size and length all affect the drilling plan. Crossings of FM 920, Belknap Branch or marked utilities can add permitting, exposure or equipment needs. Pavement, pits, backfill and excavator time also matter. Mobilization reflects the 226 road miles from Yukon, while emergency or high profile work can call for added planning.

Questions people ask about boring in Peaster

Does Trinity take directional boring jobs in Peaster and Parker County?

Yes. Trinity Boring Solutions takes Peaster work and staffs it with its own crews or partner contractor crews from satellite yards. You work with Trinity through planning and the bore log regardless of which crew is on site. For a route near FM 920, an address or map pin helps us assess the crossing.

How much rock is mapped near the surface in Peaster?

The USDA soil survey maps bedrock within five feet across 61 percent of Peaster, with hard bedrock in 39 percent and weathered bedrock in 22 percent. The typical mapped depth is 31 inches. We treat mapped soil patterns near Lee Street as planning context, since a test or bore can encounter different conditions.

Who approves a bore under FM 920 in Peaster?

The utility owner applies for the right of way permit in TxDOT’s RULIS system, and the TxDOT Fort Worth District reviews a Peaster crossing of FM 920. We prepare the route information for the owner’s application and work under its permit. The permitted plan establishes the crossing details, including required cover.

Can a line be bored under Belknap Branch in Peaster?

A bore can be planned beneath Belknap Branch, subject to the route and site review. The stream has 0.57 channel miles mapped inside Peaster, and water crossings are checked for federal jurisdiction during planning. We would choose a path and depth that account for the channel rather than cutting across the bank.

Which electric company owns lines in Parker County near Peaster?

County reports include Oncor Electric Delivery Company, Weatherford Municipal Utility System, Tri-County Electric Cooperative and Wise Electric Cooperative. That does not establish the owner at every Peaster address. Before planning a conduit bore near Zion Hill Road, we confirm the line owner and the conduit requirements for that job.

Does Peaster control Mark Layne Road, and can we bore beneath it?

Peaster is incorporated, so its city streets, including Mark Layne Road, belong to the city. Directional boring can pass beneath the street without an open cut, subject to the route and applicable approvals. We check the marked utilities on the path before drilling near the roadway.

What bore sizes and lengths can Trinity handle near Precinct Road in Peaster?

Trinity handles lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. A route near Precinct Road still needs a site specific plan: soil, access, crossings and the line being installed affect the equipment and approach.

How much notice does Texas811 need for a Peaster bore near Zion Hill Road?

For a bore near Zion Hill Road, make the Texas811 request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. For Parker County work, if the start slips more than 14 days past the original notice, we submit a new request. Before continuing on Zion Hill Road, we have worn or moved marks refreshed through Texas811.

What affects directional boring costs near FM 920 in Peaster?

The price depends on the job details, not a single measurement. Near FM 920, factors include bore length, pipe size, clay or bedrock, highway and utility crossings, pavement, pits, backfill and equipment time. The 226 road miles from Yukon affect mobilization, and a creek crossing such as Belknap Branch may add planning needs.

Where the Peaster facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Peaster

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Peaster, Texas

Type the address of your job in Peaster. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Peaster

Same county: Willow Park · Aledo · Briar · Springtown · Reno · Annetta · Azle · Hudson Oaks · Fort Worth · Western Lake · Dennis · Cresson. All counties: Texas county list.